Home / Browse projects / Thane, Maharashtra / PALAVA ALLURA C and D

De-registered No litigation declared Residential / Group Housing project

PALAVA ALLURA C and D

By PALAVA DWELLERS PVT LTD

RG-MH-85378 · RERA P51700018963 · Last updated on MahaRERA portal: 30 Dec 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 31 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 60%
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

PALAVA ALLURA C and D is a Residential / Group Housing project by PALAVA DWELLERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700018963 on 17 Dec 2018. Possession was promised by 30 Mar 2024 and is now 31 months past that date.

At a glance

Project

  • NamePALAVA ALLURA C and D
  • TypeResidential / Group Housing
  • Location
    • KALYAN SHILPHATA ROAD
    • PALAVA
    • Khoni
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700018963
  • ReraGenie IDRG-MH-85378

Builder

  • NamePALAVA DWELLERS PVT LTD
  • Entity typeCompany
  • GSTIN27AAACL1490J1ZG
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsHITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK, HITESH MARTHAK
  • Other registrations15 more →
  • Completed8 of 16
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

31 months past promisethis monthRegisteredDec 2018PromisedMar 2024

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on17 Dec 2018
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed116 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ALLURA CNA00000
ALLURA DNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 60%.

ALLURA C5%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ALLURA D5%
ActivityProgress
Excavation60%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 30 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
2 Wheeler ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,040 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
LODHA DEVELOPERS LIMITEDMumbai CityMumbai City

Approvals and building plan

Permissible FSI11899.61
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKamla Mills Compound

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
Chartered AccountantChirag Sarvaiya & Co
PartnerRole in project
PALAVA DWELLERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: MDL-PDPL merger INC-28.pdf30 Dec 2024
Other - LegalFile: NCLT Order Palava to MDL.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Dec 21.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep 21.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - March 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Dec 23.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep 23.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - March 23.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Dec 22.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - Sep 22.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June 22.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - March 22.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2 3 - June 23.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - Dec 23.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - Sep 24.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - June 24.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - March 24.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - Sep 23.pdf6 Nov 2024
Certificates of CA (Form 3)File: Form 1 2 3 - June 23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - March 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - March 23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Dec 23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June 23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Dec 22.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep 22.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - June 22.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 2 3 - Sep 23.pdf6 Nov 2024
Other - LegalFile: Annexure A - Allura C and D.pdf6 Nov 2024
Other - LegalFile: MDL-PDPL merger INC-28.pdf6 Nov 2024
Other - LegalFile: Copy Of Resolution.pdf6 Nov 2024
Other - LegalFile: Palava Allurra C and D - Notary.pdf6 Nov 2024
Other - LegalFile: Annexure A.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - March 24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - June 24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Sep24.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf6 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700018963 - Palava Allura C D.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY18-19_merged.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY 20-21 merged.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FY-21-22merged.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - PALAVA ALLURA C D - P51700018963 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - PALAVA ALLURA C D - P51700018963 - Dec23.pdf26 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Palava Allurra C D - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Palava Allura C D.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Palava Allura C To D - March23.pdf25 Jul 2023
Certificates of CA (Form 3)File: 36 PALAVA ALLURA C D - Form3.pdf25 Jul 2023
Certificates of CA (Form 3)File: PALAVA ALLURA C D - June23.pdf25 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 66 Allura C D.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 48 PALAVA ALLURA C D.pdf12 Nov 2022
Certificates of CA (Form 3)File: 48 PALAVA ALLURA - C and D.pdf13 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 48 PALAVA ALLURA - C and D.pdf12 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PALAVA ALLURA - C N D.pdf29 Jun 2022
Disclosure of sold/ booked inventoryFile: PALAVA ALLURA C D.pdf27 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 PALAVA ALLURA C D.pdf17 Dec 2021
Certificates of CA (Form 3)File: 48 PALAVA ALLURA C D.pdf15 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15_Allura C-D.pdf15 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 59 Palava Allura - C-D.pdf15 Oct 2021
Disclosure of sold/ booked inventoryFile: P51700018963.pdf14 Oct 2021
Certificates of CA (Form 3)File: 48 PALAVA ALLURA - C and D.pdf9 Oct 2021
Form 2AFile: P51700018963.pdf13 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 60 Palava Allura C and D.pdf27 Oct 2020
Form 2AFile: Palava Allura C D.pdf28 Aug 2020
Annual Audit Report of Statutory CA (Form 5)File: Palava Allura C D.pdf30 Sep 2019
Form 2AFile: ALLURA C D.pdf17 Jun 2019
Details of encumbrancesFile: PALAVA ALLURA C D.pdf25 Feb 2019
Proforma of Allotment letterFile: ATS Casa_Azzhuro_4_Jan_18_1_19.pdf4 Jan 2019
Proforma of Allotment letterFile: ATS Casa_Azzhuro_4_Jan_18_20_38.pdf4 Jan 2019
Proforma of Allotment letterFile: ATS_Casa Azzhuro_19_Dec_18_1_19.pdf20 Dec 2018
Proforma of Allotment letterFile: ATS_Casa Azzhuro_19 Dec 18 20_38.pdf20 Dec 2018
Layout approvalFile: Approved Layout.pdf12 Dec 2018
Building plan approvalFile: Plan 27.pdf12 Dec 2018
Building plan approvalFile: Plan 28.pdf12 Dec 2018
Building plan approvalFile: Plan 29.pdf12 Dec 2018

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PALAVA ALLURA C and D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALAVA7,600+ in Thane

Builder: PALAVA DWELLERS PVT LTD

Palava Dwellers Pvt Ltd has 16 registrations on MahaRERA, including Orchid A to L and PALAVA AZZURRA A TO D. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that PALAVA ALLURA C and D shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PALAVA ALLURA C and D is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALAVA ALLURA C and D?

The registered promoter entity is PALAVA DWELLERS PVT LTD, a company as per the filing. Its GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALAVA ALLURA C and D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PALAVA ALLURA C and D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALAVA ALLURA C and D?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES; Chartered Accountant: Chirag Sarvaiya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALAVA ALLURA C and D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALAVA ALLURA C and D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALAVA ALLURA C and D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.