Home / Browse projects / Pune, Maharashtra / Palaash Enlite

Registered No litigation declared Residential / Group Housing project

Palaash Enlite

By G S Promoters

RG-MH-23501 · RERA P52100078813 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 92%
61 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Palaash Enlite is a Residential / Group Housing project by G S Promoters in Pune, Maharashtra, registered with MahaRERA as P52100078813 on 13 Jan 2025. Possession is promised by 31 Dec 2026. 15 of the 76 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NamePalaash Enlite
  • TypeResidential / Group Housing
  • Location
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078813
  • ReraGenie IDRG-MH-23501

Builder

  • NameG S Promoters
  • Entity typePartnership
  • PartnerSulochana Gurubux Pahlani
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jan 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed55 files

Current status

20%15 of 76 units booked
38.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA7728028
B BuildingNA7727027
C BuildingNA7721021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 92%.

A Building48%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.47%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Building48%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.47%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Building44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots120
Closed/Covered40
Open Space80
BuildingClosed/CoveredOpen SpaceTotal
A Building132538
B Building132538
C Building143044

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,859 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025
LandownerVillageDistrict
Mrs Urmila Vilas JagtapPimpri Chinchawad (M Corp.)Pune
Mr Hiraman Nivrutti BhujbalPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI7913.71
Proposed, not sanctioned7,914 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCANARA BANK JARVARI COOP HSG SOCIETY,SURVEY NO 153/1-3,SHOP NO 13-15,PIMPLE SAUDAGAR,PUNE MAHARASHTRA 411027
Estimated costRs 31.25 cr
Cost incurredRs 12.09 cr
Work done38.7%
BuildingWingEstimatedIncurred
A BuildingNARs 9.38 crRs 4.41 cr
B BuildingNARs 9.38 crRs 4.41 cr
C BuildingNARs 9.38 crRs 3.28 cr
-NARs 3.12 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Narendra D Joshi
EngineerNitin Vasant Kharat
Chartered AccountantAzam Mulani
Chartered AccountantRinkesh Gupta & Associates
PartnerRole in project
G S Promoters-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: form 2.pdf20 Apr 2026
Withdrawal Update Form 3File: form 3 (12).pdf20 Apr 2026
Withdrawal Update Form 1File: form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: form 2.pdf20 Jan 2026
Withdrawal Update Form 3File: form 3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3-compressed (10).pdf17 Oct 2025
Form 5 (FY 2024-2025)File: GS Promoters Form 5 FY 24-25 (2).pdf30 Sep 2025
Withdrawal Update Form 1File: Signed Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Signed Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Signed Form 3.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PALAASH ENLITE.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE PALAASH ENLITE.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PALAASH ENLITE.pdf19 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Hiraman Nivrutti Bhujbal (1).pdf3 Jan 2025
Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent (8) (1).pdf4 Dec 2024
Other - LegalFile: Declaration- Landowner.pdf4 Dec 2024
Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent (8) (1).pdf4 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Email CC-Palaash.pdf15 Oct 2024
Other - FinanceFile: 5 (30).pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost Fund withdrawal (Form 3) (52) (1) (1).pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2).pdf7 Oct 2024
Proforma of Agreement for saleFile: AFS-Palassh.pdf7 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of security Int.pdf7 Oct 2024
Building plan approvalFile: scan0316.pdf3 Aug 2024
Building plan approvalFile: scan0315.pdf3 Aug 2024
Building plan approvalFile: scan0314_compressed.pdf3 Aug 2024
Building plan approvalFile: scan0313_compressed.pdf3 Aug 2024
Layout approvalFile: scan (1).pdf3 Aug 2024
PAN CardFile: G S PROMOTERS PAN CARD COPY.pdf3 Aug 2024
Copy of the legal title reportFile: Untitled (1).pdf3 Aug 2024
Details of encumbrances concerned to FinanceFile: self declaration (3).pdf3 Aug 2024
Copy of Layout Approval (in case of layout)File: scan (1).pdf3 Aug 2024
Proforma of Allotment letterFile: Model form of AL-G S.pdf3 Aug 2024
Declaration in FORM BFile: Untitled (1).pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Appendix D3 Ravet .pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0315.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0313_compressed.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0314_compressed.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: scan0316.pdf3 Aug 2024
Declaration about Commencement CertificateFile: declaration about commencemnt.pdf3 Aug 2024
CERSAI detailsFile: GetUserDocumentFileContent (9) (1).pdf3 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A-Bank.pdf3 Aug 2024
Deviation Report with respect to Allotment letterFile: deviation for allotment.pdf3 Aug 2024
Details of encumbrances concerned to LegalFile: self declaration (3).pdf3 Aug 2024
Other - TechnicalFile: Annexure A- Order 50.pdf3 Aug 2024
Deviation Report with respect to model copy of AgreementFile: deviation report.pdf3 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (8) (1).pdf3 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure 2.pdf3 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B-Bank G S.pdf3 Aug 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
PALAASH TEMPLEP52100025044PUNE, PuneMar 2020CompletedDec 2023Aug 2022
Palaash Icon Phase 1P52100001017Chinchwad, PuneJul 2017CompletedDec 2018Jul 2018
Palaash Icon Phase 2P52100000740Chinchwad, PuneJul 2017CompletedMar 2018Nov 2017

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Palaash Enlite on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmPalaash EnliteCompleted 77Lapsed / revoked 36Other 59Dot size: filed unitsN

Filed coordinates, straight-line distance. 172 registered projects within 2 km.

Builder: G S Promoters

G S PROMOTERS has 5 registrations on MahaRERA, including Palaash Icon Phase 1 and Palaash Icon Phase 2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Palaash Enlite is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Palaash Enlite?

The registered promoter entity is G S Promoters, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Palaash Enlite?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Palaash Enlite?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Palaash Enlite?

The professionals named in the filing: Architect: Ar Narendra D Joshi; Engineer: Nitin Vasant Kharat; Chartered Accountant: Azam Mulani; Chartered Accountant: Rinkesh Gupta & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Palaash Enlite?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Palaash Enlite. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Palaash Enlite to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.