Registered No litigation declared Residential / Group Housing project

Padmavati Hills A Wing

By Suyog City Developers

RG-MH-66598 · RERA P52100052667 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 90%
17 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Padmavati Hills A Wing is a Residential / Group Housing project by Suyog City Developers in Pune, Maharashtra, registered with MahaRERA as P52100052667 on 15 Sep 2023. Possession is promised by 31 Mar 2027. 23 of the 40 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NamePadmavati Hills A Wing
  • TypeResidential / Group Housing
  • Location
    • Bavdhan Budruk
    • Bavadhan BK
    • Mulshi
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052667
  • ReraGenie IDRG-MH-66598

Builder

  • NameSuyog City Developers
  • Entity typePartnership
  • PartnersRajendra Keshavlal Shah, Ashish Rajendra Shah
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Sep 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

57%23 of 40 units booked
31.9%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA131040040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

A Wing: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,543 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 May 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority,Pune
Permissible FSI6906.5
Proposed, not sanctioned4,316 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSatara Road Pune
Estimated costRs 19.43 cr
Cost incurredRs 6.21 cr
Work done31.95%
BuildingWingEstimatedIncurred
A WingNARs 17.70 crRs 6.21 cr
-NARs 1.73 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJaideep Sunil Deshpande
EngineerSomnath Kulkarni
EngineerJaysukh Bhuva
Chartered AccountantAshutosh Shah
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantPravin Pise
PartnerRole in project
Suyog City Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PADMAVATI HILLS A WING FORM 1 MARCH 26.pdf4 May 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE FORM 2.pdf4 May 2026
Withdrawal Update Form 3File: FM_3_Sign.pdf4 May 2026
Withdrawal Update Form 1File: FORM 1 ATCHITECT.pdf2 Feb 2026
Withdrawal Update Form 1File: Architect Certificate - 31-12-2025 (A wing).pdf2 Feb 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer.pdf2 Feb 2026
Withdrawal Update Form 3File: CA Certificate.pdf2 Feb 2026
Withdrawal Update Form 3File: F3-SUYOG CITY DEVELOPERS.pdf2 Feb 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTu0027S CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 2File: Form 2 ENGINEERu0027S CERTIFICATE.pdf31 Jul 2025
Withdrawal Update Form 3File: Form-3 CA Certificate.pdf31 Jul 2025
Withdrawal Update Form 1File: FORM 1_March 25.pdf10 Jun 2025
Withdrawal Update Form 2File: FORM 2 _March 25.pdf10 Jun 2025
Withdrawal Update Form 3File: CA Certificate_Mar 25.pdf10 Jun 2025
Form 1File: FORM 1_Sep 24.pdf6 Jun 2025
Form 2File: FORM2 _Sep 24.pdf6 Jun 2025
Form 3File: Form 3_Sep 2024 .pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Sep 24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration of Quarterly Progress.pdf6 Jun 2025
Form 1File: FORM 1_Dec 24.pdf6 Jun 2025
Form 2File: FORM2 _Dec 24.pdf6 Jun 2025
Form 3File: Form 3_Dec 2024.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_Dec 24.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration of Quarterly Progress.pdf6 Jun 2025
Form 1File: FORM 1_March 25.pdf6 Jun 2025
Form 2File: FORM2 _March 25.pdf6 Jun 2025
Form 3File: Form 3 - March 2025.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: Declaration of Quarterly Progress.pdf6 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf30 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 A Wing.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech's certificate 30th June 2024.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate 30th June 2024.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory 30th June 2024.pdf10 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2023 - 2024 Form 5 Annual Report on Statement of Account.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WING A FORM 1 ARCHITECT CERTIFICATES_compressed.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING A FORM 2 ENGINEERING CERTIFICATE.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: A WING UNSOLD 31 MARCH 2024.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Padmavati Hills -A wing.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: sold Unsold Dec 2023.pdf20 Jan 2024
Other - TechnicalFile: revised a wing revised certificate 11 08 23_compressed.pdf28 Apr 2023
Proforma of Agreement for saleFile: a wing final sent to priyanka madam 23 03 23 pdf (1).pdf18 Feb 2023
Copy of the legal title reportFile: Flow of Title Annexure A.pdf8 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-4-6.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-7-9.pdf6 Feb 2023
Layout approvalFile: 1 of 14_compressed.pdf5 Feb 2023
Building plan approvalFile: 2 of 14_compressed.pdf5 Feb 2023
Building plan approvalFile: 3 of 14_compressed.pdf5 Feb 2023
PAN CardFile: Pan Card.pdf5 Feb 2023
Copy of the legal title reportFile: Latest title clearance certificate 2101 23 by khopkar advocate.pdf5 Feb 2023
Details of encumbrances concerned to FinanceFile: Encumbrances .pdf5 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrances .pdf5 Feb 2023
Copy of Layout Approval (in case of layout)File: 1 of 14_compressed.pdf5 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 of 14_compressed.pdf5 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 of 14_compressed.pdf5 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: ilovepdf_merged (17).pdf5 Feb 2023
Declaration about Commencement CertificateFile: declaration about commencement certificate 28 01 23.pdf5 Feb 2023
Declaration in FORM BFile: Form B.pdf5 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200259559167_For_Asset_Based_Search_05_02_2023_23_21_51_785.pdf5 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-1-3.pdf5 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure-a rajendra k shah.pdf5 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure-a tejas r shah.pdf5 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure-a-ashish r shah.pdf5 Feb 2023
Proforma of Allotment letterFile: model form of allotment letter-3 _compressed.pdf5 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration of seperate bank accounts-5.pdf5 Feb 2023
Deviation Report with respect to Allotment letterFile: deviation report of model copy of allotment letter-2.pdf5 Feb 2023
Deviation Report with respect to model copy of AgreementFile: revised deviation report 17 02 23 rera _compressed (1).pdf5 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Padmavati Hills EFGBAWDHAN BUDRUK PUNE 411021144CompletedSep 2022Nov 2020

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Padmavati Hills A Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bavdhan Budruk13,700+ in Pune

2 kmPadmavati Hills A WingCompleted 50Lapsed / revoked 32Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 149 registered projects within 2 km.

Builder: Suyog City Developers

Suyog City Developers has 4 registrations on MahaRERA, including Padmavati Hills - E, F, G and Padmavati Hills - A, D, H. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Padmavati Hills A Wing is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Padmavati Hills A Wing?

The registered promoter entity is Suyog City Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Padmavati Hills A Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Padmavati Hills A Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Padmavati Hills A Wing?

The professionals named in the filing: Architect: Jaideep Sunil Deshpande; Engineer: Somnath Kulkarni; Engineer: Jaysukh Bhuva; Chartered Accountant: Ashutosh Shah; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Pravin Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Padmavati Hills A Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Padmavati Hills A Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Padmavati Hills A Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.