Paarshvanath
RG-MH-18416 · RERA P99000076684 · Last updated on MahaRERA portal: 3 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Paarshvanath is a Residential / Group Housing project by ESKCAYS ESTATESS in Palghar, Maharashtra, registered with MahaRERA as P99000076684 on 20 Jun 2024. Possession is promised by 30 Dec 2030.
At a glance
Project
- NamePaarshvanath
- TypeResidential / Group Housing
- Location
- Vevoor Road
- Palghar
- 401404
- Pincode401404
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000076684
- ReraGenie IDRG-MH-18416
Builder
- NameESKCAYS ESTATESS
- Entity typePartnership
- GSTIN27AAKFE6871H1Z1
- PartnerKirtikumar Hemraj Bafna
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2024
- Promised completion30 Dec 2030
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building Labh Wing B | NA | 8 | 7 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Building Labh Wing B: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Saroj Kirtikumar Bafna | Palghar | Palghar |
| Kirtikumar Hemraj Bafna | Palghar | Palghar |
| Eesha Kotecha | Palghar | Palghar |
| Chirag Kirtikumar Bafna | Palghar | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Chirag Bafna Architect And Associates |
| Engineer | Awhad Consulting Engineers |
| Chartered Accountant | B R Kotecha And Co |
| Chartered Accountant | SIDDHARTH BHUPENDRA GOGARI |
| Chartered Accountant | EESHA |
| Partner | Role in project |
|---|---|
| ESKCAYS ESTATESS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2030
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1_ARCH_Q4_FY2025-26_LabhWingB_.pdf | 3 May 2026 |
| Form 2File: Form 2_Q4_FY2025-26_Eng Certificate_Labh B wing.pdf | 3 May 2026 |
| Form 3File: Form 3_CA_Q4_2025-26_Labh B wing.pdf | 3 May 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q4_FY2025-26 LABH B wing.pdf | 3 May 2026 |
| Form 2A (FY 2024-2025)File: EE PARSHWANATH LABH -LABH B WING (1).pdf | 14 Feb 2026 |
| Form 1File: FORM 1_ARCH_Q2_FY2024-25_Labh B wing.pdf | 8 Feb 2026 |
| Form 2File: FORM 2_ENG_Q2_FY2024-25_Labh B wing.pdf | 8 Feb 2026 |
| Form 3File: FORM 3_CA_Q2_FY2024-25_Labh B wing.pdf | 8 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q2_FY2024-25_Labh B wing.pdf | 8 Feb 2026 |
| Form 1File: Form 1_ARCH_Q3_FY2025-26_LabhWingB.pdf | 22 Jan 2026 |
| Form 2File: Form 2_Q3_FY2025-26_Eng Certificate_Labh B wing_220126.pdf | 22 Jan 2026 |
| Form 3File: Form 3_Q3_2025-26_CA_Labh B wing_220126.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q3_FY2025-26 LABH B wing_170126.pdf | 22 Jan 2026 |
| Form 1File: Form 1_ARCH_Q2_FY2025-26_LabhWingB.pdf | 29 Nov 2025 |
| Form 2File: Form 2_Q2_FY2025-26_Eng Certificate_Labh B wing_151125.pdf | 29 Nov 2025 |
| Form 3File: Form 3_Q2_2025-26_Labh B wing_151125.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY_Q2_2025-26_LABH B wing_151125.pdf | 29 Nov 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25 ESKCAYS ESTATESS LABH WING B.pdf | 27 Sep 2025 |
| Form 1File: Form 1_Q1_FY2025-26_LabhWingB.pdf | 3 Aug 2025 |
| Form 2File: Form 2_Q1_FY2025-26_Eng Certificate_LabhWingB.pdf | 3 Aug 2025 |
| Form 3File: Form 3_Q1 FY2025-26 (19th April to 30 June)_LabhWingB 250725.pdf | 3 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY Q1 FY 25-26 LABH B WING.pdf | 3 Aug 2025 |
| Form 1File: FORM 1 LABH B WING Q2 FY2024-25.pdf | 2 Aug 2025 |
| Form 2File: Form 2 Q2 FY2024-25.pdf | 2 Aug 2025 |
| Form 3File: Form3_Q2 FY2024-25_LabhWingB signed.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY LABH B WING Q2 FY2024-25.pdf | 2 Aug 2025 |
| Form 1File: Form 1 Project Paarshvanth Labh B Wing Certificate Q3 FY2024-25.pdf | 2 Aug 2025 |
| Form 2File: Form 2 Q3 FY24-25_ Eng Certificate_LabhWingB.pdf | 2 Aug 2025 |
| Form 3File: Form 3_Q3 FY24-25_CACertificate_LabhWingB 140125 Signed.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY LABH B WING Q3 FY2024-25.pdf | 2 Aug 2025 |
| Form 1File: Form 1 Q4 FY24-25 Paarashvanath labh B.pdf | 2 Aug 2025 |
| Form 2File: Form 2 Q4 FY24-25_ Eng Certificate_LabhWingB.pdf | 2 Aug 2025 |
| Form 3File: Form 3_Q4 FY24-25_CACertificate_LabhWingB 05042025.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY LABH B WING Q4_FY24-25.pdf | 2 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY24-25 Paarashvanath labh B.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY24-25_ Eng Certificate_LabhWingB.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY25-26_ Eng Certificate_LabhWingB.pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Q4_FY24-25 SOLD INVENTORY LABH B WING.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1 April till 18th FY2025-26_CACertificate_LabhWingB 190425.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4 FY2024-25_CACertificate_LabhWingB 05042025.pdf | 6 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY24-25_ Eng Certificate_LabhWingB.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LABH B WING.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Paarshvanath Labh Wing B Q32425.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3 FY24-25_CACertificate_LabhWingB 140125 Signed.pdf | 14 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Q3 SOLD INVENTORY LABH B WING.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_Q2FY24-25_CACertificate_Bakulesh Kotecha_LabhWingB signed.pdf | 29 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 29 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration for no finance and legal .pdf | 13 Jun 2024 |
| Details of encumbrances concerned to LegalFile: Declaration for no finance and legal .pdf | 13 Jun 2024 |
| Building plan approvalFile: Building Plan.pdf | 1 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 1 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_LabhWingB_PAARSHVANATH.pdf | 1 Jun 2024 |
| Declaration in FORM BFile: Form B_EskcaysEstatess_compressed.pdf | 1 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE LABH B WING.pdf | 1 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE FOR Parshvanath Building Labh Wing B.pdf | 1 Jun 2024 |
| Proforma of Agreement for saleFile: AFS.pdf | 1 Jun 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 1 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: fDeclaration for Separate Bank Account_compressed.pdf | 1 Jun 2024 |
| Deviation Report with respect to Allotment letterFile: No deviation from ALLOTMENT LETTER.pdf | 1 Jun 2024 |
| Deviation Report with respect to model copy of AgreementFile: DECLARATION FOR DEVIATION (AFS).pdf | 1 Jun 2024 |
| Other - TechnicalFile: Annexure A__.pdf | 1 Jun 2024 |
| Copy of the legal title reportFile: _Title _31_05_24_.pdf | 31 May 2024 |
| Details of encumbrances concerned to FinanceFile: FINANCE N LEGAL ENCUMBRANCE CERTIFICATE 31 5.pdf | 31 May 2024 |
| Details of encumbrances concerned to LegalFile: FINANCE N LEGAL ENCUMBRANCE CERTIFICATE 31 5.pdf | 31 May 2024 |
| Declaration about Commencement CertificateFile: DECLARATION C C 31 5.pdf | 31 May 2024 |
| CERSAI detailsFile: CERSAI DECLARATION 31 5.pdf | 31 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 31 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST 31 5.pdf | 31 May 2024 |
| Layout approvalFile: Layout Plan.pdf | 30 May 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 30 May 2024 |
| PAN CardFile: PAN Card.pdf | 28 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Paarshvanath on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Palghar3,200+ in Palghar
Filed coordinates, straight-line distance. 26 registered projects within 2 km.
Veena Samrajya-Sector-VIII
Veena Developers
Prithvi Anand Kuber Complex Phase 2
Prithvi Anand Housing and Land Developers
INFINIA PHASE 1
URBAN LAND SOLUTIONS
AV SMART CITY PHASE 1
ADITYA REALTORS
PRITHVI ANAND KUBER COMPLEX
Prithvi Anand Housing and Land Developers
OSTWAL IMPERIAL
SHREE OSTWAL BUILDERS LTD
See every Palghar project, with the district possession charts
Builder: ESKCAYS ESTATESS
Eskcays Estatess has 2 registrations on MahaRERA, including Paarshvanath and Paarshvanath. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Paarshvanath is delayed beyond 30 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Paarshvanath?
The registered promoter entity is ESKCAYS ESTATESS, a partnership as per the filing. Its GSTIN 27AAKFE6871H1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Paarshvanath?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Paarshvanath?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Paarshvanath?
The professionals named in the filing: Architect: Chirag Bafna Architect And Associates; Engineer: Awhad Consulting Engineers; Chartered Accountant: B R Kotecha And Co; Chartered Accountant: SIDDHARTH BHUPENDRA GOGARI; Chartered Accountant: EESHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Paarshvanath?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.