Home / Browse projects / Pune, Maharashtra / Oxy Beaumonde Phase -2
Oxy Beaumonde Phase -2
RG-MH-27591 · RERA P52100034157 · Last updated on MahaRERA portal: 8 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Oxy Beaumonde Phase -2 is a Residential / Group Housing project by VENKATESH LANDMARK in Pune, Maharashtra, registered with MahaRERA as P52100034157 on 24 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameOxy Beaumonde Phase -2
- TypeResidential / Group Housing
- Location
- AIRPORT ROAD
- BEHIND SYMBOISIS LAW SCHOOL VIMANNAGAR
- LOHGAON
- Haveli
- Pune
- 411014
- Pincode411014
- RERA no.P52100034157
- ReraGenie IDRG-MH-27591
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Mar 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed64 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B | NA | 14 | 0 | 0 | 0 | 0 |
| C | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.
B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership12
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr. Aslam A. Haji | wanwadi | Pune |
| Mr. Mohammad Ali A. Haji | wanwadi | Pune |
| Mr. Suhail Sayyad | Pune (CB) | Pune |
| Mr. Tausif Irshad Shaikh | Pune (M Corp.) | Pune |
| Ms. Anjum Golandai | Pune (M Corp.) | Pune |
| Mr .Shaikh Irshad Mohammad Ishaque | Pune (M Corp.) | Pune |
| Mr. Mansoor T. Poonawala | kondhwa khurd | Pune |
| Mr. Shabbir T. Poonawala | Pune (CB) | Pune |
| Mr. Moiz M. Poonawala | Pune (M Corp.) | Pune |
| Ms. Minoti H. Aurora | - | Pune |
| Mr. Mohit H. Aurora | - | Pune |
| Ms. Radhika H. Aurora | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MR ATIT ADMULWAR |
| Engineer | MR NILESH D RASKAR |
| Chartered Accountant | YOGESH D MALI |
| Partner | Role in project |
|---|---|
| VENKATESH LANDMARK | - |
Litigation declared4
| Case | Court | Status |
|---|---|---|
| Civil MA /1658/2021/2021 | DISTRICT COURT PUNE CJSD | Precept be sent to District Collector Pune |
| WP/1859/2017/2017 | HIGH COURT OF BOMBAY | Pre Admission |
| 13161/2022 | HIGH COURT OF BOMBAY | DISPOSED OF |
| 011051/2023 | SUPREME COURT OF INDIA | For admission |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000258920 | Pradeep Lunavat | Venkatesh Landmark | 26/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Mar 2025
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - LegalFile: 08-05-2025 Affidavit_0001.pdf | 8 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 phase 2.pdf | 3 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Venkatesh Landmark- PH2 Form 4_0001.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 30 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4_0001.pdf | 30 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_0001_compressed (1).pdf | 30 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 30 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: BOOKING_0001.pdf | 30 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_0001.pdf | 30 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE_0001.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VL-Ph2 ARCH Cert_0001.pdf | 13 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VL-Ph2 Engg Cert_0001_compressed.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: VL-Ph2 B wing sold flat_0001.pdf | 13 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: VL-Ph2 C wing sold flat_0001.pdf | 13 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VL-Ph2 CA Cert_0001_compressed.pdf | 13 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: P2 FORM1_0001.pdf | 27 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P2 FORM 2_0001.pdf | 27 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: P2 BOOKING_0001.pdf | 27 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P2 FORM 3_0001.pdf | 27 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 phase-2 22-23_0001_compressed.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 phase 2_0001_compressed.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 PHASE 2_0001_compressed.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booking disclosure p-2_compressed.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 phase 2_0001_compressed.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate-PH2- June-2023_0001_compressed.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: b and c_0001.pdf | 25 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: e b c_0001.pdf | 25 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Oxy Beaumonde- PH2- B wing Details_0001.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Oxy Beaumonde- PH2- C wing Details_0001.pdf | 24 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 10 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 10 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 10 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: society certificate.pdf | 10 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: B -C 31-12.pdf | 28 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2a-2022-p2.pdf | 21 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2a-2023-p2.pdf | 21 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC22-Phase 2- Form1 AR.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 P-2.pdf | 20 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Phase 2_compressed.pdf | 20 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22 Phase 2.pdf | 20 Jan 2023 |
| Layout approvalFile: Layout (2).pdf | 18 Mar 2022 |
| Building plan approvalFile: P-1.pdf | 18 Mar 2022 |
| Building plan approvalFile: P-2.pdf | 18 Mar 2022 |
| Building plan approvalFile: P-3.pdf | 18 Mar 2022 |
| Building plan approvalFile: P-4.pdf | 18 Mar 2022 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 18 Mar 2022 |
| Copy of the legal title reportFile: ADV KUMBHAR Search Report 12-03-2021.pdf | 18 Mar 2022 |
| Details of encumbrancesFile: Encumbrances Certificate 2.pdf | 18 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: Layout (2).pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: P-1.pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: P-2.pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: P-3.pdf | 18 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: P-4.pdf | 18 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 (2).pdf | 18 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2 (2).pdf | 18 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf | 18 Mar 2022 |
| Declaration about Commencement CertificateFile: Form-D.pdf | 18 Mar 2022 |
| Declaration in FORM BFile: Builder_compressed.pdf | 18 Mar 2022 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 18 Mar 2022 |
| Proforma of Allotment letterFile: Agreement draft VLOB - RERA UPLODED 18-3-22.pdf | 18 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 9 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG Certificate.pdf | 9 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 9 Mar 2022 |
| PAN CardFile: Venkatesh Landmark PANCARD.pdf | 5 Mar 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| OXY EVOLVE | WAGHOLI PUNE | 197 | Completed | Dec 2019 | Jan 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Oxy Beaumonde Phase -2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BEHIND SYMBOISIS LAW SCHOOL VIMANNAGAR13,700+ in Pune
VJ IndiLife Kharadi
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
VJ Central Avenue
Vilas Javdekar Eco Homes
VJ IndiWorks Kharadi Central
Vilas Javdekar Eco Homes
RIVERDALE GRAND
DUVILLE ESTATES PRIVATE LIMITED
Yashwin Orizzonte Phase II
VILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP
ZEN ESTATE
DESTINATION KHARADI DEVELOPERS LLP
Builder: VENKATESH LANDMARK
VENKATESH LANDMARK has 3 registrations on MahaRERA, including OXY BEAUMONDE PHASE 1 and Oxy Beaumonde Phase -2. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Oxy Beaumonde Phase -2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Oxy Beaumonde Phase -2 is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Oxy Beaumonde Phase -2?
The registered promoter entity is VENKATESH LANDMARK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Oxy Beaumonde Phase -2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Oxy Beaumonde Phase -2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Oxy Beaumonde Phase -2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Oxy Beaumonde Phase -2?
The professionals named in the filing: Architect: MR ATIT ADMULWAR; Engineer: MR NILESH D RASKAR; Chartered Accountant: YOGESH D MALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Oxy Beaumonde Phase -2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.