Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
27 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

OSWAL LIFESPACES - PHASE 1 is a Others project by OSWAL LIFESPACES in Palghar, Maharashtra, registered with MahaRERA as P99000002598 on 2 Aug 2017. The registration is recorded completed; possession was promised by 29 Mar 2024. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOSWAL LIFESPACES - PHASE 1
  • TypeOthers
  • Location
    • MAHIM-MANOR ROAD
    • PALGHAR
    • shelwali
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000002598
  • ReraGenie IDRG-MH-20015

Builder

  • NameOSWAL LIFESPACES
  • Entity typePartnership
  • PartnerKIRTIKUMAR JAKHU GALA

Key dates

this monthRegisteredAug 2017First promiseMar 2023Revised toMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Aug 2017
  • Promised completion29 Mar 2024
  • Revised completionRevised to 29 Mar 2024 (originally 30 Mar 2023)
  • Buildings3 building records
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 01NA80000
BUILDING NO 02NA80000
BUILDING NO 03NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 0182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 0282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 0382%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4
BuildingOpen SpaceTotal
BUILDING NO 0111
BUILDING NO 0211
BUILDING NO 0322

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,443 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VIKASH DEVELOPERSMahimPalghar

Approvals and building plan

Permissible FSI5401.27
Proposed, not sanctioned5,401 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANK OF BARODA, MOUNT POINSUR ANAND BHAVAN NEAR ST FRANCIS HIGH SCHOOL BORIVALI WEST MUMBAI 400103

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHENDRA KALE
EngineerMAHENDRAKUMAR RANE
Chartered AccountantCA JIGNESH GALA
Chartered AccountantCA Dipti Desai
Chartered AccountantCA Sandeep Desai
PartnerRole in project
OSWAL LIFESPACES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000014042Mar 2023 → Mar 2024

Reason as filed by the promoterDue to covid - 19 pandemic, there was delay in completion of the project.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503280Ganesh Daulat SableOSWAL LIFESPACES14/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Feb 2024

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: OL FORM 5 - 31-03-2023 - SCANNED.pdf4 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OL Bldg no 1_2_3_OC.pdf28 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: form 4 Architect certificate .pdf28 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL_Form_1_Dec_23.pdf7 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL_Form_2_Dec_2023.pdf7 Feb 2024
Declaration about Commencement CertificateFile: OL_FORMAT_D.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL form1 15_04_2022.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL form1 10_07_2022.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL from1 12_10_2022.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL form1 9_01_2023.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL form2 15_01_2022.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL form2 15_04_2022.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL form2 10_07_2022.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL form2 15_10_2022.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL form2 10_01_2023.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: OL From2A_28_03_2023.pdf4 Apr 2023
Certificates of CA (Form 3)File: OL From3 31_12_2021.pdf4 Apr 2023
Certificates of CA (Form 3)File: OL form3 31_03_2022.pdf4 Apr 2023
Certificates of CA (Form 3)File: OL Form3 18_01_2023_compressed.pdf4 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: OL Annual report 15_11_2022.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL_Arch_june22.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL_Arch_Sept22.pdf2 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL_Arch_dec22.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL_Engineet_June_2022.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL_Engineer_Sept_2022.pdf2 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL_Engineer_Dec_2022.pdf2 Feb 2023
Certificates of CA (Form 3)File: OL FORM 3 - Sept_2022_compressed.pdf2 Feb 2023
Certificates of CA (Form 3)File: New Doc 01202023 1721compressed.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: OL _ FORM 5 _19.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: OL FORM 5 31032020.pdf9 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OL Form 5 31032021.pdf22 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OL Form 5 31032021.pdf22 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: OL Form 5 31032022.pdf22 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL FORM 3 30092022.pdf15 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Dec_2021.pdf27 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_March_2022.pdf27 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Dec_2021_compressed.pdf18 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_MArch_2022_compressed.pdf18 Jun 2022
Certificates of CA (Form 3)File: FORM 3 - DEC 2021_compressed.pdf18 Jun 2022
Certificates of CA (Form 3)File: FORM 3 MARCH_2022_compressed.pdf18 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate - 30-09-2021.PDF28 Dec 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 30-09-2021.pdf19 Dec 2021
Certificates of CA (Form 3)File: CA Form 3 - 30-09-2021.pdf19 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL Architect Certificate June2021 Maharera Compressed.pdf2 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate FORM 2 June 2021 Compressed.pdf2 Aug 2021
Certificates of CA (Form 3)File: OL FORM 3 June 2021 (1).pdf2 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Compressed OL_ Architect_Certificate_Dec 2020.pdf15 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OL_Architect_Certificate_Mar 2021 Compressed.pdf15 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL Engineers Certificate Dec 2020 Compressed.pdf15 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf15 Jul 2021
Disclosure of sold/ booked inventoryFile: OL -DISCLOSURE AS ON March 2021.pdf15 Jul 2021
Disclosure of sold/ booked inventoryFile: OL - Disclosure as on March 2021.pdf15 Jul 2021
Certificates of CA (Form 3)File: OL Form 3 - 31-12-2020 Compressed.pdf15 Jul 2021
Certificates of CA (Form 3)File: OL Form 3 Compressed.pdf15 Jul 2021
Certificates of CA (Form 5)File: OL Form 5.pdf15 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: September 2019 - uploaded.pdf10 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate - September 2019 - uploaded.pdf10 Dec 2019
Certificates of CA (Form 3)File: OL Form 3 - 30-Sept-19.pdf10 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Dec 2018 SCANNED final.pdf13 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OL FORM 2 Dec 2018 SCANNED.pdf13 Apr 2019
Certificates of CA (Form 3)File: OL FORM 3 Dec 2018 SCANNED.pdf13 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ol form 1 march 2018.pdf6 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ol form 2 march 2018.pdf6 Mar 2019
Certificates of CA (Form 3)File: ol form 3 march 2018.pdf6 Mar 2019
Certificates of CA (Form 5)File: OL Form 5 March 2018.pdf6 Mar 2019
Declaration in FORM BFile: OL-FORM B pdf.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate final.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eNGINEERS CERTIFICATE final.pdf26 Jul 2017
Certificates of CA (Form 3)File: OSWAL CA CERTIFICATE.pdf26 Jul 2017
Building plan approvalFile: OL-Bldg 01 pdf.pdf23 Jul 2017
Building plan approvalFile: OL-Bldg 2-3 pdf.pdf23 Jul 2017
Layout approvalFile: OL-Layout-01 pdf.pdf23 Jul 2017
PAN CardFile: OL PAN pdf.pdf23 Jul 2017
Copy of the legal title reportFile: OL - TITLE - COMPRESSED.pdf23 Jul 2017
Details of encumbrancesFile: Declaration for no Encumbrance pdf.pdf23 Jul 2017
Copy of Layout Approval (in case of layout)File: OL-Layout-01 pdf.pdf23 Jul 2017
Building Plan Approval (IOD)File: OL-Bldg 01 pdf.pdf23 Jul 2017
Building Plan Approval (IOD)File: OL-Bldg 2-3 pdf.pdf23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: OL -NA Order Part-1.pdf23 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: OL - NA Order Part 2.pdf23 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSWAL LIFESPACES - PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR3,200+ in Palghar

2 kmOSWAL LIFESPACES - PHASECompleted 10Lapsed / revoked 8Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: OSWAL LIFESPACES

OSWAL LIFESPACES has 1 registration on MahaRERA, including OSWAL LIFESPACES - PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if OSWAL LIFESPACES - PHASE 1 is delayed beyond 29 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSWAL LIFESPACES - PHASE 1?

The registered promoter entity is OSWAL LIFESPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSWAL LIFESPACES - PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OSWAL LIFESPACES - PHASE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OSWAL LIFESPACES - PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSWAL LIFESPACES - PHASE 1?

The professionals named in the filing: Architect: MAHENDRA KALE; Engineer: MAHENDRAKUMAR RANE; Chartered Accountant: CA JIGNESH GALA; Chartered Accountant: CA Dipti Desai; Chartered Accountant: CA Sandeep Desai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSWAL LIFESPACES - PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSWAL LIFESPACES - PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSWAL LIFESPACES - PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.