ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Oswal Dream City Phase-2 Building No 22 and 23

Registered No litigation declared Residential / Group Housing project

Oswal Dream City Phase-2 Building No 22 and 23

By Mahendra Pratap Ojha

RG-MH-07299 · RERA P99000054773 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 50%
36 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Oswal Dream City Phase-2 Building No 22 and 23 is a Residential / Group Housing project by Mahendra Pratap Ojha in Palghar, Maharashtra, registered with MahaRERA as P99000054773 on 12 Feb 2024. Possession is promised by 31 Dec 2028. 12 of the 48 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameOswal Dream City Phase-2 Building No 22 and 23
  • TypeResidential / Group Housing
  • Location
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000054773
  • ReraGenie IDRG-MH-07299

Builder

  • NameMahendra Pratap Ojha
  • Entity typeIndividual
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed67 files

Current status

25%12 of 48 units booked
50.7%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 22NA5524024
Building No 23NA5524024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

Building No 2264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Building No 2329%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,066 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Aug 2025
LandownerVillageDistrict
Oswal Realtors Pvt LtdBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityPalghar District council
Permissible FSI1877.84
Proposed, not sanctioned1,878 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 4 to 10 Jai Gurudev Commercial Complex Devisha Road Palghar W
Estimated costRs 3.80 cr
Cost incurredRs 1.93 cr
Work done50.66%
BuildingWingEstimatedIncurred
Building No 22NARs 1.75 crRs 1.57 cr
Building No 23NARs 1.75 crRs 35.00 lakh
-NARs 30.00 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Kale
EngineerK S Engineering Services
EngineerKS ENGINEERING SERVICES
EngineerCENTRELINE CONSULTANTS & ENGINEERS
Chartered AccountantBharat Dhonde and Co
Chartered AccountantBharat Dhonde & Co.
Chartered AccountantMohammad Memon
PartnerRole in project
Mahendra Pratap Ojha-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf28 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf28 Apr 2026
Withdrawal Update Form 3File: Form-3 Jayendra Mar-2026.pdf28 Apr 2026
Form 5 (FY 2024-2025)File: Form 5.pdf10 Mar 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf21 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate FORM 2 30 12 2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 December 25.pdf21 Feb 2026
Form 2A (FY 2024-2025)File: Form-2A(Fy 2024-25).pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 .pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2 as on 30-09-25.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3 as on 30-09-25.pdf1 Dec 2025
Layout approvalFile: Building Plan comn.pdf23 Aug 2025
Building plan approvalFile: building plan.pdf23 Aug 2025
Withdrawal Update Form 1File: Form 1 June 2025.pdf23 Aug 2025
Withdrawal Update Form 2File: Form 2 June 2025.pdf23 Aug 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf23 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-12-2024.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold as on 31-12-2024.pdf24 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold 30-09-2024.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 As on 30-09-2024.pdf23 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf23 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Jayendra Developers.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 as on 31-03-2024.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 as on 30-06-2024.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 as on 31-03-2024.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 as on 30-06-2024.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold 31-03-2024.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold 30-06-2024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 as on 31-03-2024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 as on 30-06-2024.pdf25 Jul 2024
Other - TechnicalFile: 1 Conveyance Deed (Suresh Dube to Oswal).pdf7 Feb 2024
Other - TechnicalFile: 2 Oswal Realtors Pvt Ltd (Development Agreement).pdf7 Feb 2024
Other - TechnicalFile: 3 Development Agreement (Oswal to Jayendra).pdf7 Feb 2024
Other - TechnicalFile: 4 Power of Attorny - POA (Oswal to Jayendra).pdf7 Feb 2024
Layout approvalFile: Layout.pdf20 Jan 2024
Layout approvalFile: Building Plan.pdf20 Jan 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf20 Jan 2024
Copy of Layout Approval (in case of layout)File: Building Plan.pdf20 Jan 2024
Proforma of Agreement for saleFile: Final Draft of Agreement for Sale.pdf20 Jan 2024
Other - TechnicalFile: Technical Declaration.pdf20 Jan 2024
Other - TechnicalFile: Acknowledgement of CC sent to MahaRERA.pdf20 Jan 2024
Other - TechnicalFile: Calculation of BUA.pdf20 Jan 2024
Other - TechnicalFile: Part OC.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Dec 2023
Copy of the legal title reportFile: Legal title Report.pdf26 Dec 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Declaration.pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance Declaration.pdf26 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Dec 2023
Declaration in FORM BFile: Form B-Jayendra Developers.pdf26 Dec 2023
CERSAI detailsFile: Cersai Report.pdf26 Dec 2023
Proforma of Allotment letterFile: Allotment letter.pdf26 Dec 2023
Building plan approvalFile: Building Plan comn.pdf22 Dec 2023
PAN CardFile: Pancard.pdf22 Dec 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Declaration.pdf22 Dec 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance Declaration.pdf22 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan comn.pdf22 Dec 2023
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate -CC- Formate -D.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech Certificate Form 1.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf22 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Org -Annexure A.pdf22 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank State For Real Estate Project -Format A.pdf22 Dec 2023
Deviation Report with respect to Allotment letterFile: deviation Report of Allotment Letter.pdf22 Dec 2023
Deviation Report with respect to model copy of AgreementFile: deviation Report of Draft Agreement.pdf22 Dec 2023

How this compares with Palghar

25%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Oswal Dream City Phase-2 Building No 22 and on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Palghar3,200+ in Palghar

Builder: Mahendra Pratap Ojha

Mahendra Pratap Ojha has 2 registrations on MahaRERA, including Oswal Dream City Phase-2 Building No 22 and 23 and AWADH APARTMENT. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Oswal Dream City Phase-2 Building No 22 and 23 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Oswal Dream City Phase-2 Building No 22 and 23?

The registered promoter entity is Mahendra Pratap Ojha, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Oswal Dream City Phase-2 Building No 22 and 23?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Oswal Dream City Phase-2 Building No 22 and 23?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Oswal Dream City Phase-2 Building No 22 and 23?

The professionals named in the filing: Architect: Mahendra Kale; Engineer: K S Engineering Services; Engineer: KS ENGINEERING SERVICES; Engineer: CENTRELINE CONSULTANTS & ENGINEERS; Chartered Accountant: Bharat Dhonde and Co; Chartered Accountant: Bharat Dhonde & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Oswal Dream City Phase-2 Building No 22 and 23?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Oswal Dream City Phase-2 Building No 22 and 23. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Oswal Dream City Phase-2 Building No 22 and to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.