Home / Browse projects / Palghar, Maharashtra / OSWAL DREAM CITY BUILDING NO.19, 20, 21

Registered No litigation declared Residential / Group Housing project

OSWAL DREAM CITY BUILDING NO.19, 20, 21

By Palghar Developers

RG-MH-07516 · RERA P99000055149 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
8 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
51 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

OSWAL DREAM CITY BUILDING NO.19, 20, 21 is a Residential / Group Housing project by Palghar Developers in Palghar, Maharashtra, registered with MahaRERA as P99000055149 on 4 Mar 2024. Possession is promised by 31 Dec 2027. 13 of the 64 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete.

At a glance

Project

  • NameOSWAL DREAM CITY BUILDING NO.19, 20, 21
  • TypeResidential / Group Housing
  • Location
    • Bidco Road
    • Chintupada
    • Mahim
    • Palghar
    • 401404
  • Pincode401404
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055149
  • ReraGenie IDRG-MH-07516

Builder

  • NamePalghar Developers
  • Entity typePartnership
  • PartnersBijender Kumar Sukhveer Singh Zhinzhoter, Dharmendra Kumar, Vikas Satyaprakash Singh, Anshuman Indal Singh

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed70 files

Current status

20%13 of 64 units booked
39.6%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 19 Type C - SatyamNA4424024
Building No 20 Type C - ShivamNA4424024
Building No 21 Type A - SundaramNA4416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

Building No 19 Type C - Satyam12%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth30%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 20 Type C - Shivam37%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 21 Type A - Sundaram73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Open Space64
BuildingOpen SpaceTotal
Building No 19 Type C - Satyam2525
Building No 20 Type C - Shivam2525
Building No 21 Type A - Sundaram1414

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,803 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jul 2025
LandownerVillageDistrict
OSWAL REALTORS PVT. LTD.MahimPalghar

Approvals and building plan

Sanctioning authorityUppar Collector Thane
Permissible FSI3803.4
Proposed, not sanctioned3,803 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPrestige - 1, Achole Road, Nallasopara East, Thane, Maharashtra - 401302
Estimated costRs 7.50 cr
Cost incurredRs 2.97 cr
Work done39.61%
BuildingWingEstimatedIncurred
Building No 19 Type C - SatyamNARs 2.90 crRs 28.95 lakh
Building No 20 Type C - ShivamNARs 2.90 crRs 1.59 cr
Building No 21 Type A - SundaramNARs 1.21 crRs 1.09 cr
-NARs 50.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Kale
EngineerKS Engineering Services
EngineerSunil Pal
Chartered AccountantVirendra K Tare & Co
Chartered AccountantSurendra Kumar Trivedi
PartnerRole in project
Palghar Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: From 2 Palghar Developers upto 31 03 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: From 2 Palghar Developers upto 31 03 2026.pdf19 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30 12 2025 Final.pdf19 Jun 2026
Withdrawal Update Form 2File: From 2 Palghar Developers upto 31 03 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: From 3 Palghar Developers upto 31 03 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: From 3 Palghar Developers upto 31 03 2026.pdf19 Jun 2026
Withdrawal Update Form 1File: Architect Certificate FORM 1 30 12 2025 Final.pdf18 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30 12 2025 Final.pdf18 Jun 2026
Withdrawal Update Form 3File: From 3 Palghar Developers upto 31 12 2025.pdf18 Jun 2026
Withdrawal Update Form 1File: Architect Certificate FORM 1 30 09 2025 Final.pdf16 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 30 09 2025 Final.pdf16 Jun 2026
Withdrawal Update Form 3File: From 3 Palghar Developers upto 30 09 2025.pdf16 Jun 2026
Form 2A (FY 2023-2024)File: RERA Form 2A Palghar Developers 31 03 2024.pdf21 Jul 2025
Form 2A (FY 2024-2025)File: RERA Form 2A Palghar Developers 31 03 2025.pdf21 Jul 2025
Form 5 (FY 2023-2024)File: RERA Form 5 Palghar Developers 01 04 2023 to 31 03 2024.pdf20 Jul 2025
Form 5 (FY 2024-2025)File: RERA Form 5 Palghar Developers 01 04 2024 to 31 03 2025.pdf20 Jul 2025
Form 1File: Form 1 - Architect Certificate - 10 10 2024.pdf15 Jul 2025
Form 2File: Form 2 - Engineer Certificate 10 10 2024.pdf15 Jul 2025
Form 3File: RERA Form 3 Palghar Developers 30 09 2024.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory 30 09 2024.pdf15 Jul 2025
Form 1File: RERA Form 1 Palghar Developers 30 06 2025.pdf14 Jul 2025
Form 2File: RERA Form 2 Palghar Developers 30 06 2025.pdf14 Jul 2025
Form 3File: RERA Form 3 Palghar Developers 30 06 2025.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf14 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Palghar Developers.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate - 10 10 2024.pdf1 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Palghar Developers 30 09 2024.pdf1 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate 10 10 2024.pdf1 Dec 2024
Other - TechnicalFile: 1 Palghar Developers Technical Declaration.pdf20 Feb 2024
Other - TechnicalFile: 2 CC Issued by Addl Collector on 08 Jull 2011.pdf20 Feb 2024
Other - TechnicalFile: 3 Palghar Developers Justification.pdf20 Feb 2024
Other - TechnicalFile: 4 OC of nearby project.pdf20 Feb 2024
Other - TechnicalFile: 5 Land Purchase Agreement.pdf20 Feb 2024
Other - TechnicalFile: 6 Oswal Agreement.pdf20 Feb 2024
Other - TechnicalFile: 71 Development Agreement 1 to 18.pdf20 Feb 2024
Other - TechnicalFile: 72 Development Agreement 19 to 36.pdf20 Feb 2024
Other - TechnicalFile: 73 Development Agreement 37 to 54.pdf20 Feb 2024
Other - TechnicalFile: 8 Layout Plan Oswal Dream City.pdf20 Feb 2024
Other - TechnicalFile: 9 Type A D Bldg Plan.pdf20 Feb 2024
Other - TechnicalFile: 10 Type C Bldg Plan.pdf20 Feb 2024
Other - TechnicalFile: 11 Power of Attorney Oswal to Palghar 1 to 12.pdf20 Feb 2024
Other - TechnicalFile: 12 Power of Attorney Oswal to Palghar 13 to 23.pdf20 Feb 2024
Declaration in FORM BFile: Form B Promoter.pdf10 Feb 2024
Other - TechnicalFile: Clarification Letter wrt Sanctioned Area.pdf10 Feb 2024
Other - TechnicalFile: Form B Land Owner.pdf10 Feb 2024
Layout approvalFile: Highlighted Layout Plan Oswal Dream City.pdf31 Jan 2024
Copy of Layout Approval (in case of layout)File: Highlighted Layout Plan Oswal Dream City.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1st Form 3 Revised.pdf31 Jan 2024
Building plan approvalFile: Type A D Bldg Plan.pdf6 Jan 2024
Building plan approvalFile: Type C Bldg Plan.pdf6 Jan 2024
PAN CardFile: Palghar Developers PAN Card.pdf6 Jan 2024
Copy of the legal title reportFile: Legal Title Report.pdf6 Jan 2024
Details of encumbrances concerned to FinanceFile: Finance Legal Encumbrances.pdf6 Jan 2024
Details of encumbrances concerned to LegalFile: Finance Legal Encumbrances.pdf6 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Type A D Bldg Plan.pdf6 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Type C Bldg Plan.pdf6 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf6 Jan 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate [Format D].pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf6 Jan 2024
CERSAI detailsFile: Undertaking for Security Interest CERSAI.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A [Anshuman Singh].pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A [Bijender Singh].pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A [Dharmendra Kumar].pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A [Vikas S Singh].pdf6 Jan 2024
Proforma of Allotment letterFile: Allotment Letter Palghar Developers.pdf6 Jan 2024
Proforma of Agreement for saleFile: Agreement for Sale Palghar Developers.pdf6 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Account.pdf6 Jan 2024
Deviation Report with respect to Allotment letterFile: No Deviation Report for Allotment.pdf6 Jan 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Report for Agreement.pdf6 Jan 2024

How this compares with Palghar

20%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSWAL DREAM CITY BUILDING NO.19, 20, 21 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chintupada3,200+ in Palghar

2 kmOSWAL DREAM CITY BUILDINCompleted 86Lapsed / revoked 40Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 168 registered projects within 2 km.

Builder: Palghar Developers

Palghar Developers has 1 registration on MahaRERA, including OSWAL DREAM CITY BUILDING NO.19, 20, 21. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if OSWAL DREAM CITY BUILDING NO.19, 20, 21 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSWAL DREAM CITY BUILDING NO.19, 20, 21?

The registered promoter entity is Palghar Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSWAL DREAM CITY BUILDING NO.19, 20, 21?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSWAL DREAM CITY BUILDING NO.19, 20, 21?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSWAL DREAM CITY BUILDING NO.19, 20, 21?

The professionals named in the filing: Architect: Mahendra Kale; Engineer: KS Engineering Services; Engineer: Sunil Pal; Chartered Accountant: Virendra K Tare & Co; Chartered Accountant: Surendra Kumar Trivedi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSWAL DREAM CITY BUILDING NO.19, 20, 21?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSWAL DREAM CITY BUILDING NO.19, 20, 21. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSWAL DREAM CITY BUILDING NO.19, 20, 21 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.