Home / Browse projects / Palghar, Maharashtra / OSTWAL VILLAS
OSTWAL VILLAS
RG-MH-05422 · RERA P99000051610 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 6 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 19 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OSTWAL VILLAS is a Residential / Group Housing project by SHREE OSTWAL BUILDERS LTD in Palghar, Maharashtra, registered with MahaRERA as P99000051610 on 27 Jun 2023. Possession is promised by 31 Dec 2028. 13 of the 36 units on this registration are recorded sold or booked, and 165 of 396 construction stages are filed complete.
At a glance
Project
- NameOSTWAL VILLAS
- TypeResidential / Group Housing
- Location
- PALGHAR KHAREKURAN ROAD
- TEMBHODE
- Palghar
- 401405
- Pincode401405
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000051610
- ReraGenie IDRG-MH-05422
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings36 building records
- Documents filed104 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUNGALOW NO 1 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 2 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 3 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 4 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 5 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 6 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 7 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 8 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 9 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 10 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 11 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 12 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 13 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 14 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 15 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 16 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 17 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 18 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 19 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 20 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 21 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 22 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 23 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 24 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 25 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 26 TYPE B | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 27 TYPE B1 | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 28 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 29 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 30 TYPE A | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 31 TYPE D | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 32 TYPE C | NA | 2 | 2 | 1 | 0 | 1 |
| BULGALOW NO 33 TYPE C | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 34 TYPE C | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 35 TYPE C | NA | 2 | 2 | 1 | 0 | 1 |
| BUNGALOW NO 36 TYPE C | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 36 buildings; the table lists the first 20.
165 of 396 construction stages are filed complete across 36 buildings. The stage furthest along is Staircases, at 95%.
BUNGALOW NO 1 TYPE A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 2 TYPE A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 3 TYPE A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 4 TYPE A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 5 TYPE A68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 6 TYPE B145%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 7 TYPE B45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 8 TYPE B141%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 9 TYPE B41%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 10 TYPE B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 11 TYPE B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 12 TYPE A45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 13 TYPE A58%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 14 TYPE A59%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 15 TYPE A43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 16 TYPE A45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 17 TYPE A48%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 18 TYPE A43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 19 TYPE B10%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUNGALOW NO 20 TYPE B9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DEVENDRA RAMESH TIWARI | Palghar | Palghar |
| KARAN BIRENDRA TIWARI | Palghar | Palghar |
| KIRAN BIRENDRA TIWARI | Palghar | Palghar |
| SAKSHI BIRENDRA TIWARI | Palghar | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.00 cr | Rs 1.10 cr |
| BUNGALOW NO 32 TYPE C | NA | Rs 97.00 lakh | Rs 58.20 lakh |
| BULGALOW NO 33 TYPE C | NA | Rs 97.00 lakh | Rs 58.20 lakh |
| BUNGALOW NO 34 TYPE C | NA | Rs 96.00 lakh | Rs 33.60 lakh |
| BUNGALOW NO 35 TYPE C | NA | Rs 95.00 lakh | Rs 71.25 lakh |
| BUNGALOW NO 36 TYPE C | NA | Rs 95.00 lakh | Rs 88.35 lakh |
| BUNGALOW NO 1 TYPE A | NA | Rs 85.00 lakh | Rs 79.05 lakh |
| BUNGALOW NO 2 TYPE A | NA | Rs 85.00 lakh | Rs 79.05 lakh |
| BUNGALOW NO 3 TYPE A | NA | Rs 85.00 lakh | Rs 79.05 lakh |
| BUNGALOW NO 4 TYPE A | NA | Rs 85.00 lakh | Rs 79.05 lakh |
| BUNGALOW NO 5 TYPE A | NA | Rs 85.00 lakh | Rs 80.75 lakh |
| BUNGALOW NO 12 TYPE A | NA | Rs 85.00 lakh | Rs 53.73 lakh |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VASTU SHILP MR NISHANT P PATIL |
| Engineer | RAJESH DUBEY |
| Engineer | BHAVESH TODANKAR |
| Engineer | SUNIL PAWAR MAHIPAL PAWAR |
| Engineer | BHAVESH TODANKAR BALCHANDRA TODANKAR |
| Chartered Accountant | ABHISHEK SURANA & CO |
| Chartered Accountant | KHURDIA JAIN & CO. |
| Chartered Accountant | ABHISHEK SURANA & CO. |
| Chartered Accountant | Madhubala Jain & Co |
| Partner | Role in project |
|---|---|
| SHREE OSTWAL BUILDERS LTD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1_Villas_31032026.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Form 2_Villas_31032026.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: Form 3_Villas_31032026.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1_VILLAS_31122025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 2File: FORM-2_VILLAS_31122025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 3File: FORM-3_VILLAS_31122025.pdf | 28 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1_OSTWAL VILLAS_30092025.pdf | 4 Dec 2025 |
| Withdrawal Update Form 2File: FORM-2_OSTWAL VILLAS_30092025.pdf | 4 Dec 2025 |
| Withdrawal Update Form 3File: FORM-3_OSTWAL VILLAS_30092025.pdf | 4 Dec 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 VILLAS-2023-24.pdf | 29 Sep 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 VILLAS-2024-25.pdf | 29 Sep 2025 |
| Form 1File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 27 Sep 2025 |
| Form 2File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 27 Sep 2025 |
| Form 3File: 12 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 27 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 8 Disclosure of sold_ booked inventory (2).pdf | 27 Sep 2025 |
| Form 1File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 27 Sep 2025 |
| Form 2File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf | 27 Sep 2025 |
| Form 3File: 11 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 27 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: 7 Disclosure of sold_ booked inventory.pdf | 27 Sep 2025 |
| Form 1File: Form 1_30062025_Villas_11zon.pdf | 19 Jul 2025 |
| Form 2File: Form 2 30062025 Villas.pdf | 19 Jul 2025 |
| Form 3File: FORM -3 OSTWAL VILLAS.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_ 30062025_Villas.pdf | 19 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Villas_Self Declaration 30062025.pdf | 19 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032025-VILLAS.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ 31032025-VILLAS_.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Certification Form-3 _31032025 _Villas .pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_31032025-Villas.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_March-25_Villas.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -31122024-villas_.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31122024.pdf | 3 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 _31122024.pdf | 3 Feb 2025 |
| Other - LegalFile: Bank Change Letter.pdf | 3 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD_OSTWAL VILLAS_31122024.pdf | 14 Jan 2025 |
| Other - FinanceFile: SELF CERTIFICATION_OSTWAL VILLAS_31122024.pdf | 14 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_OSTWAL VILLAS_31122024.pdf | 14 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31122023.pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30092023.pdf | 4 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 17062024.pdf | 17 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AS ON 30092024.pdf | 27 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AS ON 30092024.pdf | 27 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_OSTWAL VILLAS.pdf | 20 Oct 2024 |
| Other - FinanceFile: Ostwal Villas_Self Certification_30092024.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate of Ostwal Villas.pdf | 19 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Villas Quality Assurance Certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Villas Sold Unsold Ostwal 30062024.pdf | 20 Jul 2024 |
| Other - FinanceFile: Villas Self Declaration as on 30062024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Qtr Ended 30092023.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr Ended 31122023.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr Ended 31032024.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert As on 30 09 2023_11zon.pdf | 22 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert As on 31 12 2023_11zon.pdf | 22 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert_ As on 31 03 2024_11zon.pdf | 22 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 30 09 2023.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31 03 2024.pdf | 18 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31 12 2023.pdf | 18 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate As on 30 09 2023.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate As on 31 12 2023.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate As on 31 03 2024.pdf | 17 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Separate Bank Account_Villas.pdf | 27 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Villas_March-2024.pdf | 16 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold_ Villas.pdf | 16 Apr 2024 |
| Other - FinanceFile: Self Declaration_ Villas.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 ARCH CER_11zon.pdf | 5 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf | 5 Apr 2024 |
| Other - FinanceFile: Villas.pdf | 12 Feb 2024 |
| Other - FinanceFile: villa SEP.pdf | 12 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_ Ostwal Villas.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 8 - VILLAS - Discloser Sold Unsold Inventory.pdf | 13 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 8 - Form - 2A - Ostwal Villas.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: VILLA.pdf | 20 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A Ostwal Villas.pdf | 19 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY Ostwal Villas.pdf | 19 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration _CC.pdf | 14 Jun 2023 |
| Other - TechnicalFile: OSTWAL VILLAS FSI DECLARATION.pdf | 23 May 2023 |
| Building plan approvalFile: LAYOUT N BUNGLOW PLAN-3_11zon.pdf | 22 May 2023 |
| Building plan approvalFile: LAYOUT N BUNGLOW PLAN-4_11zon.pdf | 22 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT N BUNGLOW PLAN-3_11zon.pdf | 22 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: LAYOUT N BUNGLOW PLAN-4_11zon.pdf | 22 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_REVISED.pdf | 17 Apr 2023 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| OSTWAL WOODSP99000019832 | OPP. UNION PARK, Palghar | - | Mar 2019 | Completed | Dec 2024 | Jun 2023 |
| OSTWAL DARSHANP51700004905 | BHAYANDER EAST, Thane | - | Aug 2017 | Completed | Dec 2024Registered original: Dec 2023 | Jun 2024 |
| OSTWAL GARDEN | KANAKIA ROAD MIRA ROAD EAST | 69 | - | Completed | Dec 2015 | Jun 2015 |
| OSTWAL OASIS | MIRA ROAD EAST | 33 | - | Completed | Apr 2015 | Jan 2015 |
| OSTWAL PRIDE I | KANAKIA ROAD MIRA ROAD EAST | 63 | - | Completed | Mar 2015 | Mar 2015 |
| OSTWAL HEIGHT BLDG 1 TO 4 | KANAKIA ROAD MIRA ROAD EAST | 195 | - | Completed | Dec 2013 | Dec 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 19 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OSTWAL VILLAS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TEMBHODE3,200+ in Palghar
Filed coordinates, straight-line distance. 85 registered projects within 2 km.
OSTWAL PALACE
SHREE OSTWAL BUILDERS LTD
Bafna Palatial Villas
DIAMOND DEVELOPERS
ANAND BASERA WING I AND J
PAN INDIA REALTY
PADMA BHAVANI VILLAS
PATEL CONSTRUCTION
Bhavani Darshan
Bhavani Builders & Developers
DEEPA HEIGHTS
SHRUSHTI VINAYAK REALTORS
See every Palghar project, with the district possession charts
Builder: SHREE OSTWAL BUILDERS LTD
SHREE OSTWAL BUILDERS LTD has 20 registrations on MahaRERA, including OSTWAL DARSHAN and OSTWAL POINT. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if OSTWAL VILLAS is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OSTWAL VILLAS?
The registered promoter entity is SHREE OSTWAL BUILDERS LTD, a company as per the filing. Its CIN U45200MH1989PLC050872 and GSTIN 27AAFCS2523N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OSTWAL VILLAS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OSTWAL VILLAS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OSTWAL VILLAS?
The professionals named in the filing: Architect: VASTU SHILP MR NISHANT P PATIL; Engineer: RAJESH DUBEY; Engineer: BHAVESH TODANKAR; Engineer: SUNIL PAWAR MAHIPAL PAWAR; Engineer: BHAVESH TODANKAR BALCHANDRA TODANKAR; Chartered Accountant: ABHISHEK SURANA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OSTWAL VILLAS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback