Home / Browse projects / Thane, Maharashtra / OSTWAL PARADISE BUILDING NO.9 WING A - B - C

Registered Litigation declared Residential / Group Housing project

OSTWAL PARADISE BUILDING NO.9 WING A - B - C

By SHREE OSTWAL BUILDERS LTD

RG-MH-98426 · RERA P51700048041 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 91%
57 of 194Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

OSTWAL PARADISE BUILDING NO.9 WING A - B - C is a Residential / Group Housing project by SHREE OSTWAL BUILDERS LTD in Thane, Maharashtra, registered with MahaRERA as P51700048041 on 7 Dec 2022. Possession is promised by 31 Dec 2028. 137 of the 194 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameOSTWAL PARADISE BUILDING NO.9 WING A - B - C
  • TypeResidential / Group Housing
  • Location
    • MIRA BHAYANDER ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048041
  • ReraGenie IDRG-MH-98426

Builder

  • NameSHREE OSTWAL BUILDERS LTD
  • Entity typeCompany
  • CINU45200MH1989PLC050872
  • GSTIN27AAFCS2523N1Z4
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorUMRAOSINGH PRITHVIRAJ OSTWAL
  • DirectorsKULDEEP UMRAOSINGH Ostwal, ASHA UMRAOSINGH OSTWAL
  • Other registrations19 more →
  • Completed7 of 20
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2022PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed103 files

Current status

71%137 of 194 units booked
58.2%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OSTWAL PARADISE BUILDING NO 9 WING - ANA252081081
OSTWAL PARADISE BUILDING NO 9 WING - BNA24036036
OSTWAL PARADISE BUILDING NO 9 WING - CNA24077077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 91%.

OSTWAL PARADISE BUILDING NO 9 WING - A46%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OSTWAL PARADISE BUILDING NO 9 WING - B47%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
OSTWAL PARADISE BUILDING NO 9 WING - C50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered182
Open Space6
BuildingClosed/CoveredOpen SpaceTotal
OSTWAL PARADISE BUILDING NO 9 WING - A86692
OSTWAL PARADISE BUILDING NO 9 WING - B48048
OSTWAL PARADISE BUILDING NO 9 WING - C48048

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,560 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Aug 2025
LandownerVillageDistrict
BRASS FRANCIS GOMES FAMILYMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMIRA BHAINDER MAHANAGARPALIKA
Permissible FSI13520.0
Proposed, not sanctioned13,520 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA BHAYANDER ROAD MIRA ROAD EAST
Estimated costRs 65.32 cr
Cost incurredRs 37.99 cr
Work done58.16%
BuildingWingEstimatedIncurred
OSTWAL PARADISE BUILDING NO 9 WING - ANARs 20.11 crRs 12.16 cr
OSTWAL PARADISE BUILDING NO 9 WING - BNARs 20.11 crRs 12.16 cr
OSTWAL PARADISE BUILDING NO 9 WING - CNARs 20.11 crRs 12.16 cr
-NARs 5.00 crRs 1.50 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMIT KUMAR JHA
ArchitectTEJ'S CONSULTANT
ArchitectTEJ'S CONSULTANTS
EngineerPRO-TECH CONSULTANTS
EngineerSHUBHAM MUKESH OSTWAL SHUBHAM MUKESH OSTWAL
EngineerBHAVESH TODANKAR BHAVESH BALCHANDRA TODANKAR
Chartered AccountantMadhubala Jain & Co
Chartered AccountantABHISHEK SURANA & CO
Chartered AccountantKHURDIA JAIN AND CO
PartnerRole in project
SHREE OSTWAL BUILDERS LTD-

Litigation declared2

CaseCourtStatus
769/2022CIVIL COURT THANEPENDING FOR HEARING
769/2022CIVIL COURT THANEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Paradise_31032026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2_Paradise_31032026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3_Paradise_31032026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1_Ostwal Paradise_31122025.pdf27 Jan 2026
Withdrawal Update Form 2File: FORM-2_PARADISE BOLD NO 9_31122025.pdf27 Jan 2026
Withdrawal Update Form 3File: FORM-3_PARADISE_31122025.pdf27 Jan 2026
Withdrawal Update Form 1File: FORM-1_OSTWAL PARADISE_30092025.pdf25 Oct 2025
Withdrawal Update Form 2File: FORM-2_OSTWAL PARADISE_30092025.pdf25 Oct 2025
Withdrawal Update Form 3File: FORM-3_OSTWAL PARADISE_30092025.pdf25 Oct 2025
Withdrawal Update Form 1File: FORM 1_30062025-PARADISE.pdf25 Sep 2025
Withdrawal Update Form 2File: FORM 2_30062025-PARADISE.pdf25 Sep 2025
Withdrawal Update Form 3File: Form 3 30062025_Paradise.pdf25 Sep 2025
Form 1File: FORM 1_30062025-PARADISE.pdf2 Sep 2025
Form 2File: FORM 2_30062025-PARADISE.pdf2 Sep 2025
Form 3File: Form 3 30062025_Paradise.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_ 30062025_Paradise.pdf2 Sep 2025
Self-declaration of Quarterly ProgressFile: Paradise_Self Declaration 30062025.pdf2 Sep 2025
Form 1File: FORM-1_ 31032025-Paradise.pdf19 Jun 2025
Form 2File: FORM 2 31032025-PARADISE.pdf19 Jun 2025
Form 3File: Self Certification Form-3 _31032025 _Paradise Bldg 9 .pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_31032025-Paradise 9.pdf19 Jun 2025
Form 1File: FORM-1_ 31032025-Paradise.pdf19 Jun 2025
Form 2File: FORM 2 31032025-PARADISE.pdf19 Jun 2025
Form 3File: Self Certification Form-3 _31032025 _Paradise Bldg 9 .pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_31032025-Paradise 9.pdf19 Jun 2025
Form 1File: FORM-1_ 31122024-Paradise.pdf19 Jun 2025
Form 2File: FORM 2 31122024-PARADISE.pdf19 Jun 2025
Form 3File: Paradise Self Certification 31122024.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD_OSTWAL PARADISE_31122024.pdf19 Jun 2025
Form 1File: FORM 1 30092024.pdf19 Jun 2025
Form 2File: FORM 2 30092024.pdf19 Jun 2025
Form 3File: FORM 3 30092024.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_OSTWAL PARADISE BLDG NO 09 WING A B C.pdf19 Jun 2025
Self-declaration of Quarterly ProgressFile: Ostwal Paradise Bldg No 9 Wing A B C Self Certification 30092024.pdf19 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Certification Form-3 _31032025 _Paradise Bldg 9 .pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_31032025-Paradise 9.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_March-25_Paradise 9.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Paradise Self Certification 31122024.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31122024-PARADISE.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032025-PARADISE.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ 31122024.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_ 31032025.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD_OSTWAL PARADISE_31122024.pdf14 Jan 2025
Other - FinanceFile: SELF CERTIFICATION_OSTWAL PARADISE_31122024.pdf14 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_OSTWAL PARADISE BLDG NO 9_31122024.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_OSTWAL PARADISE BLDG NO 09 WING A B C.pdf20 Oct 2024
Other - TechnicalFile: Ostwal Paradise Bldg No9 Wing A B C Self Certification_30092024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Ostwal Paradise Bldg No 9 Wing A B C_30092024.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Paradise Bldg No 09 Quality Assurance Certificate.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Paradise Bldg No 09 Quality Assurance Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Paradise Sold Unsold 30062024.pdf20 Jul 2024
Other - FinanceFile: Paradise Self Declaration as on 30062024.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Paradise_Bldg No 9_March-2024.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold_ Paradise Bldg No 9.pdf16 Apr 2024
Other - FinanceFile: Self Declaration_ Paradise Bldg NO 9.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 7 - PARADISE - Discloser Sold Unsold Inventory.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: 7 - PARADISE - Discloser Sold Unsold Inventory.pdf13 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG CERT PARADISE.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: PARADISE.pdf20 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM2A Ostwal Paradise.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY Paradise.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: OSTWAL PARADISE SOLD UNSOLD.pdf17 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PARADISE- 9 - 2A QUALITY.pdf14 Apr 2023
Copy of the legal title reportFile: Title Paradise.pdf6 Feb 2023
Copy of the legal title reportFile: Title Paradise_rotated.pdf6 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Ostwal Paradise Bldg No 9 Wing A B C.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: PARADISE.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION BANK ACCOUNT.pdf13 Dec 2022
Proforma of Agreement for saleFile: Agr Paradise.pdf15 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf15 Nov 2022
Proforma of Agreement for saleFile: DRAFT AGREEMENT PAREDISE.pdf11 Oct 2022
Proforma of Allotment letterFile: DRAFT AGREEMENT PAREDISE.pdf11 Oct 2022
Deviation Report with respect to model copy of AgreementFile: 11zon_cropped-PDF.pdf11 Oct 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LITIGATION.pdf9 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf9 Sep 2022
Deviation Report with respect to model copy of AgreementFile: 7-Agr-Paradise 9-09092022.pdf9 Sep 2022
Other - LegalFile: AGR N POWER.pdf9 Sep 2022
Proforma of Allotment letterFile: DRAFT ALLOTMENT.pdf23 Aug 2022
Proforma of Agreement for saleFile: DRAFT ALLOTMENT.pdf23 Aug 2022

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OSTWAL WOODSP99000019832OPP. UNION PARK, Palghar-Mar 2019CompletedDec 2024Jun 2023
OSTWAL DARSHANP51700004905BHAYANDER EAST, Thane-Aug 2017CompletedDec 2024Registered original: Dec 2023Jun 2024
OSTWAL GARDENKANAKIA ROAD MIRA ROAD EAST69-CompletedDec 2015Jun 2015
OSTWAL OASISMIRA ROAD EAST33-CompletedApr 2015Jan 2015
OSTWAL PRIDE IKANAKIA ROAD MIRA ROAD EAST63-CompletedMar 2015Mar 2015
OSTWAL HEIGHT BLDG 1 TO 4KANAKIA ROAD MIRA ROAD EAST195-CompletedDec 2013Dec 2013

How this compares with Thane

71%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSTWAL PARADISE BUILDING NO.9 WING A - B - C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmOSTWAL PARADISE BUILDINGCompleted 101Lapsed / revoked 77Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 282 registered projects within 2 km.

Builder: SHREE OSTWAL BUILDERS LTD

SHREE OSTWAL BUILDERS LTD has 20 registrations on MahaRERA, including OSTWAL DARSHAN and OSTWAL POINT. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OSTWAL PARADISE BUILDING NO.9 WING A - B - C is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSTWAL PARADISE BUILDING NO.9 WING A - B - C?

The registered promoter entity is SHREE OSTWAL BUILDERS LTD, a company as per the filing. Its CIN U45200MH1989PLC050872 and GSTIN 27AAFCS2523N1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSTWAL PARADISE BUILDING NO.9 WING A - B - C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSTWAL PARADISE BUILDING NO.9 WING A - B - C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSTWAL PARADISE BUILDING NO.9 WING A - B - C?

The professionals named in the filing: Architect: AMIT KUMAR JHA; Architect: TEJ'S CONSULTANT; Architect: TEJ'S CONSULTANTS; Engineer: PRO-TECH CONSULTANTS; Engineer: SHUBHAM MUKESH OSTWAL SHUBHAM MUKESH OSTWAL; Engineer: BHAVESH TODANKAR BHAVESH BALCHANDRA TODANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSTWAL PARADISE BUILDING NO.9 WING A - B - C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSTWAL PARADISE BUILDING NO.9 WING A - B - C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSTWAL PARADISE BUILDING NO.9 WING A - B - C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.