Home / Browse projects / Ratnagiri, Maharashtra / ORRCHID ROYAL
ORRCHID ROYAL
RG-MH-12236 · RERA P52800003190 · Last updated on MahaRERA portal: 11 Mar 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ORRCHID ROYAL is a Others project by WINSOME REALTY in Ratnagiri, Maharashtra, registered with MahaRERA as P52800003190 on 4 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 60 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameORRCHID ROYAL
- TypeOthers
- Location
- Jalgaon
- Dapoli
- Ratnagiri
- 412712
- Pincode412712
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800003190
- ReraGenie IDRG-MH-12236
Builder
- NameWINSOME REALTY
- Entity typePartnership
- PartnersMONIKA MILIND POKHARKAR, JAYSHREE PRAVIN ANNADATE, KIRAN DAGDU GOGAWALE, SUDHIR SHANKARRAO HIWALE, SANJEEV RAJESHWAR KUMAR, JITENDRA KUMAR NATHULAL SHARMA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Aug 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Dec 2020)
- Buildings4 building records
- Documents filed26 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING B | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING C | NA | 5 | 0 | 0 | 0 | 0 |
| BUILDING D | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 11 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 80%.
BUILDING A14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 25% |
| Podiums (if any) | 0% |
| Plinth | 25% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING B14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 25% |
| Podiums (if any) | 0% |
| Plinth | 25% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING D50%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 10% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VAISHALI SUDHIR KALEKAR | Dapoli Camp | Ratnagiri |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY KULKARNI |
| Partner | Role in project |
|---|---|
| WINSOME REALTY | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterInitially at the time of registration we have planned to complete the whole project in a single phase. But due to unavoidable reasons we are unable to do that. Hence after that we have decided to complete the project in phase wise (JDA is revised as per current condition ) i.e. weeing C is completed and OC has been uploaded. Weeing D is near 90% competition and A and B is yet to start. We have 0 ZERO booking or advances in Weeing A, B AND D.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000196214 | Eknath Mahadik | Winsome Realty | 01/03/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Oct 2022
Documents filed26
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 11 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate 2020_compressed.pdf | 11 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer's Certificate 2021_compressed.pdf | 11 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer's Certificate 2022_compressed.pdf | 11 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: SoldBooked Inventories (1)_compressed.pdf | 11 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: royal_form5_2017-18.pdf | 25 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: royal_form5_2018-19.pdf | 25 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: royal_form5_2019-20.pdf | 25 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: royal_form5_2020-21.pdf | 25 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: royal_form5_2021-22.pdf | 25 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Noc (2).pdf | 12 Oct 2022 |
| Layout approvalFile: Drawing1.pdf | 27 Jul 2017 |
| Building plan approvalFile: Drawing1.pdf | 27 Jul 2017 |
| Building plan approvalFile: DRAWING 2.pdf | 27 Jul 2017 |
| PAN CardFile: PAN.pdf | 27 Jul 2017 |
| Copy of the legal title reportFile: Search title.pdf | 27 Jul 2017 |
| Details of encumbrancesFile: ENCUBRANCES.pdf | 27 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Drawing1.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: Drawing1.pdf | 27 Jul 2017 |
| Building Plan Approval (IOD)File: DRAWING 2.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement.pdf | 27 Jul 2017 |
| Declaration in FORM BFile: FORM B.pdf | 27 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 27 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER.pdf | 27 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate -1.pdf | 27 Jul 2017 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 26 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep ORRCHID ROYAL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jalgaon1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 51 registered projects within 2 km.
Mandke Lighthouse
Mandke and Mandke Infrastructure Pvt. Ltd.
TomorrowView
House of Abhinandan Lodha Estate Holdings
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
Codename Tomorrowland Ph-2
House of Abhinandan Lodha Estate Holdings
Cape of Bliss Phase 1A
HOABL Management LLP
VIAA VISION
VIAA VISION
See every Ratnagiri project, with the district possession charts
Builder: WINSOME REALTY
WINSOME REALTY has 1 registration on MahaRERA, including ORRCHID ROYAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What does it mean that ORRCHID ROYAL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ORRCHID ROYAL is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ORRCHID ROYAL?
The registered promoter entity is WINSOME REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ORRCHID ROYAL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against ORRCHID ROYAL?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for ORRCHID ROYAL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ORRCHID ROYAL?
The professionals named in the filing: Architect: SANJAY KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ORRCHID ROYAL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback