VIAA VISION

By VIAA VISION

RG-MH-73336 · RERA P52800018488 · Last updated on MahaRERA portal: 9 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
320 of 333Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

VIAA VISION is a Plotted project by VIAA VISION in Ratnagiri, Maharashtra, registered with MahaRERA as P52800018488 on 12 Nov 2018. Possession is promised by 30 Dec 2029. 13 of the 333 units on this registration are recorded sold or booked. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVIAA VISION
  • TypePlotted
  • Location
    • VILLAGE TADIL
    • TADIL
    • Dapoli
    • Ratnagiri
    • 415712
  • Pincode415712
  • RERA no.P52800018488
  • ReraGenie IDRG-MH-73336

Builder

  • NameVIAA VISION
  • Entity typeOthers
  • Named personsGREEN HILL COUNTY, SHREERAJ WEST SIDE COUNTY, SHREERAJ SEA BREEZE COUNTY

Key dates

this monthRegisteredNov 2018PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Nov 2018
  • Promised completion30 Dec 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed62 files

Current status

4%13 of 333 units booked

Figures as on 9 Sep 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 9 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area161,436 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Jun 2026

Approvals and building plan

Sanctioning authorityTown Planning and Valuation Department
Permissible FSI135886.65
Proposed, not sanctioned135,887 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAWANI PETH PUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL BHAMARE
EngineerBalkrishna Kalbhor
Chartered AccountantAkshay Mukesh Kriplani
Chartered AccountantPriti Ashok Gandhi
Chartered AccountantPunit Kriplani
PartnerRole in project
VIAA VISION-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12605226Ranjan Vidyadhar PhadkeVIAA VISION17/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Jun26.pdf9 Sep 2026
Withdrawal Update Form 1File: Architect Jun26.pdf9 Sep 2026
Withdrawal Update Form 1File: Form 1 Final.pdf9 Sep 2026
Withdrawal Update Form 1File: Form 1 Final.pdf9 Sep 2026
Withdrawal Update Form 2File: Engineer Jun26.pdf9 Sep 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf9 Sep 2026
Withdrawal Update Form 2File: Form 2 Final.pdf9 Sep 2026
Withdrawal Update Form 2File: Form 2 Final.pdf9 Sep 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf9 Sep 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf9 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf9 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf9 Sep 2026
Withdrawal Update Form 1File: Architect Jun26.pdf31 Aug 2026
Withdrawal Update Form 2File: Engineer Jun26.pdf31 Aug 2026
Withdrawal Update Form 3File: FORM_3_Q4_25-26_compressed (1).pdf31 Aug 2026
Withdrawal Update Form 1File: FORM - I 31-12-2022.pdf20 Aug 2026
Withdrawal Update Form 2File: Signed Form 2.pdf20 Aug 2026
Withdrawal Update Form 3File: FORM_3_Q4_25-26_compressed (1).pdf20 Aug 2026
Withdrawal Update Form 1File: FORM - I 31-12-2022.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM - I 31-12-2022.pdf4 Aug 2026
Withdrawal Update Form 1File: FORM - I 31-12-2022.pdf4 Aug 2026
Withdrawal Update Form 2File: Signed Form 2.pdf4 Aug 2026
Withdrawal Update Form 2File: Signed Form 2.pdf4 Aug 2026
Withdrawal Update Form 2File: Signed Form 2.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM_3_Q2_25-26_compressed (3).pdf4 Aug 2026
Withdrawal Update Form 3File: Form_3_Q3_25-26_compressed.pdf4 Aug 2026
Withdrawal Update Form 3File: FORM_3_Q4_25-26_compressed (1).pdf4 Aug 2026
Withdrawal Update Form 1File: FORM - I 31-12-2022.pdf1 Aug 2026
Withdrawal Update Form 2File: Signed Form 2.pdf1 Aug 2026
Withdrawal Update Form 3File: Form_3_Q1_25-26_compressed.pdf1 Aug 2026
Form 1File: FORM - I 31-12-2022.pdf9 Jul 2026
Form 2File: VIAA VISION 31 MARCH 2025.pdf9 Jul 2026
Form 3File: Form_3_Q4_24-25.pdf9 Jul 2026
Disclosure of Sold and Booked InventoryFile: Form_3_Q4_24-25.pdf9 Jul 2026
Declaration about Commencement CertificateFile: DECLARATION_ABOUT_COMMENCEMENT_OF_PROJECT.pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 2018-2019.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 05 - 2019 2020.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020 2021.pdf13 Feb 2023
Proforma of Agreement for saleFile: PLOT_AGREEMENT.pdf13 Feb 2023
PAN CardFile: GREEN HILL COUNTY PAN CARD.pdf10 Dec 2022
Proforma of Allotment letterFile: RERA FORMAT - ALLOTMENT LETTER AS PER ORDER 31 2022.pdf10 Dec 2022
Building plan approval or NA orderFile: LAYOUT 38 ACRES-min-ilovepdf-compressed.pdf20 Oct 2018
Building plan approval or NA orderFile: ilovepdf_jpg_to_pdf(1).pdf20 Oct 2018
Layout approvalFile: LAYOUT 38 ACRES-min-ilovepdf-compressed.pdf20 Oct 2018
Layout approvalFile: ilovepdf_jpg_to_pdf(1).pdf20 Oct 2018
Copy of the legal title reportFile: SEARCH 1.pdf20 Oct 2018
Copy of the legal title reportFile: 2.pdf20 Oct 2018
Copy of the legal title reportFile: 3.pdf20 Oct 2018
Copy of the legal title reportFile: 4.pdf20 Oct 2018
Copy of the legal title reportFile: ilovepdf_merged-ilovepdf-compressed-1-12.pdf20 Oct 2018
Copy of the legal title reportFile: ilovepdf_merged-ilovepdf-compressed-13-25.pdf20 Oct 2018
Details of encumbrancesFile: SELF DECLARATION No Encum.pdf20 Oct 2018
Copy of Layout Approval (in case of layout)File: LAYOUT 38 ACRES-min-ilovepdf-compressed.pdf20 Oct 2018
Copy of Layout Approval (in case of layout)File: ilovepdf_jpg_to_pdf(1).pdf20 Oct 2018
Building Plan Approval (IOD)File: LAYOUT 38 ACRES-min-ilovepdf-compressed.pdf20 Oct 2018
Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf(1).pdf20 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA Order Phase 2.pdf20 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA-Order-Phase-1 1-10.pdf20 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: NA-Order-Phase-1 11-20.pdf20 Oct 2018
Declaration in FORM BFile: FORM B.pdf20 Oct 2018
Certificates of CA (Form 3)File: RERA CERTIFICAE.pdf20 Oct 2018
Proforma of Allotment letterFile: DECLARATION ATS.pdf20 Oct 2018

How this compares with Ratnagiri

4%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep VIAA VISION on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TADIL1,100+ in Ratnagiri

Builder: VIAA VISION

VIAA VISION has 1 registration on MahaRERA, including VIAA VISION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if VIAA VISION is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VIAA VISION?

The registered promoter entity is VIAA VISION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VIAA VISION?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VIAA VISION?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VIAA VISION?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VIAA VISION?

The professionals named in the filing: Architect: SUNIL BHAMARE; Engineer: Balkrishna Kalbhor; Chartered Accountant: Akshay Mukesh Kriplani; Chartered Accountant: Priti Ashok Gandhi; Chartered Accountant: Punit Kriplani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VIAA VISION?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VIAA VISION. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VIAA VISION to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.