Home / Browse projects / Ratnagiri, Maharashtra / Cape of Bliss Phase 1A
Cape of Bliss Phase 1A
RG-MH-06463 · RERA P52800052438 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Cape of Bliss Phase 1A is a Plotted project by HOABL Management LLP in Ratnagiri, Maharashtra, registered with MahaRERA as P52800052438 on 25 Aug 2023. The registration is recorded completed; possession was promised by 30 Dec 2025. 78 of the 385 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.
At a glance
Project
- NameCape of Bliss Phase 1A
- TypePlotted
- Location
- Kolthare
- Dapoli
- Ratnagiri
- Kolthare
- Dapoli
- 415712
- Pincode415712
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52800052438
- ReraGenie IDRG-MH-06463
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Aug 2023
- Promised completion30 Dec 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed104 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 85% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 70% |
| Community Buildings | Yes | 90% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 35.31 cr | Rs 7.03 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Tansika Misal |
| Architect | Bhalachandra Gothankar |
| Engineer | Dinesh Balkrishna Satam |
| Chartered Accountant | Chirag Sarvaiya |
| Chartered Accountant | U S MISHRA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| HOABL Management Private Limited | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400975 | Sukanya Kannappan | Lodha Management LLP | 02/12/2024 |
| CC12504534 | SANJAY MADANRAJ SHAH | HOABL Management Private Limited | 19/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Dec 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Jan 2026
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Signed_Form 2A_Cape of Bliss Phase 1A.pdf | 29 Jun 2026 |
| Completion CertificateFile: Completion Certificate confirmation Email from MSRDC to MahaRERA_29122025.pdf | 8 Jan 2026 |
| Completion CertificateFile: MSRDC notification 2025_highlighted.pdf | 7 Jan 2026 |
| Building plan approval or NA orderFile: COB 1A - NA Order.pdf | 26 Dec 2025 |
| Layout approvalFile: COB 1A - Layout.pdf | 26 Dec 2025 |
| Completion CertificateFile: COB 1A - Completion Certificate.pdf | 26 Dec 2025 |
| Completion CertificateFile: Encl - COB 1A - Completion Plans.pdf | 26 Dec 2025 |
| Withdrawal Update Form 1File: Architect Certificate_Cape of Bliss 1A_Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: AC - COB 1A.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: Engineer Certificate_COB 1A_Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: EC - COB 1A.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: CA Certificate_COB-1A_Signed.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: CA - COB-1A.pdf | 20 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_COB 1A_signed.pdf | 29 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - Cape of Bliss Phase Ia.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: COB 1A - Achitect Certificate.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase 1A-P52800052438-CA certificate.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: COB 1A - Engineer Certificate.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A_signed.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB1A.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP PH1A.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB1A.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Cape of bliss 1A.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP-Cape of Bliss PH 1A.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB 1A.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A_signed.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 9 COB Phase 1a_Form 5_promoter signed.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cape of Bliss - Phase 1A - Achitect Certificate-signed.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cape of Bliss Phase IA- Engineer certificate.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Cape of Bliss Phase 1A.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase 1A - CA certificate.pdf | 20 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Lodha Management LLP.pdf | 5 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_COB 1A_signed.pdf | 27 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Cape of Bliss Phase 1A.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Cob 1A.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB 1A.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LMLLP_1A.pdf | 20 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Sold Booked Inventory-Cape of Bliss Phase 1A.pdf | 20 Jan 2024 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-1-10.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-11-20.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-21-30.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-31-40.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-41-60.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-61-90.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-91-120.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-121-140.pdf | 6 Dec 2023 |
| Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-141-158.pdf | 6 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB-1A_signed.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG- CoB 1a.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA COB Phase 1a.pdf | 17 Oct 2023 |
| Other - TechnicalFile: AnyScanner_08_22_2023 (1) (8 files merged).pdf | 22 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca cERTIFICATE (1).pdf | 17 Aug 2023 |
| Other - LegalFile: 1 217-2023- 93-7.pdf | 17 Aug 2023 |
| Other - LegalFile: 2 999-2023 - 39-16.pdf | 17 Aug 2023 |
| Other - LegalFile: 3 1233-2023 -37-4.pdf | 17 Aug 2023 |
| Other - LegalFile: 4 2106-2023 - VIKAS ZAGADE.pdf | 17 Aug 2023 |
| Other - LegalFile: 5 2108-2023- KISHOR V ZAGADE- SUPPLEMENTARY AFS.pdf | 17 Aug 2023 |
| Other - LegalFile: 6 2319-2023 - 93-7.pdf | 17 Aug 2023 |
| Other - LegalFile: 7 2463-2022 - 37-3.pdf | 17 Aug 2023 |
| Other - LegalFile: 8 2615-2023 - 37-6, 37-7.pdf | 17 Aug 2023 |
| Other - LegalFile: 8 2615-2023 - 37-6, 37-7.pdf | 17 Aug 2023 |
| Other - LegalFile: 9 2909-2022 - 38-1.pdf | 17 Aug 2023 |
| Other - LegalFile: 11 3419-2022 - 38-1.pdf | 17 Aug 2023 |
| Other - LegalFile: 12 4968- 2022- 37-9.pdf | 17 Aug 2023 |
| Other - LegalFile: 13 5104-2022 -37-9.pdf | 17 Aug 2023 |
| Other - LegalFile: 14 AFS 2116-2023.pdf | 17 Aug 2023 |
| Other - LegalFile: 15 AFS 3666-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 15 AFS 3666-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 16 AFS_1088-2023.pdf | 17 Aug 2023 |
| Other - LegalFile: 17 AFS_3061-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 18 AFS_3220-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 19 AFS_3703-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 20 AFS_4806-2022.pdf | 17 Aug 2023 |
| Other - LegalFile: 10 2989-23 -37-6, 37-7.pdf | 17 Aug 2023 |
| Copy of the legal title reportFile: COB 1A -TITLE REPORT-New (1).pdf | 12 Aug 2023 |
| Other - TechnicalFile: CC Confirmation Email.pdf | 12 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Ratnagiri
Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
Keep Cape of Bliss Phase 1A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ratnagiri1,100+ in Ratnagiri
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
KONKAN TRAILS LIFESPACE
KONKANTRAILSLIFESPACELLP
VIAA VISION
VIAA VISION
COASTAL BREEZE
UNIVERSAL PROPERTIES
VRUNDAVAN
EMPIRE REALTORS AND DEVELOPERS
Cape of Bliss Phase I
Lodha Management LLP
Cape of Bliss 1B
HOABL Management Private Limited
See every Ratnagiri project, with the district possession charts
Builder: HOABL Management LLP
HOABL Management LLP has 2 registrations on MahaRERA, including Cape of Bliss Phase 1A and Waves of Bliss. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Ratnagiri district page.
Frequently asked questions
What are my rights if Cape of Bliss Phase 1A is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Cape of Bliss Phase 1A?
The registered promoter entity is HOABL Management LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Cape of Bliss Phase 1A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Cape of Bliss Phase 1A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Cape of Bliss Phase 1A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Cape of Bliss Phase 1A?
The professionals named in the filing: Architect: Tansika Misal; Architect: Bhalachandra Gothankar; Engineer: Dinesh Balkrishna Satam; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: U S MISHRA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Cape of Bliss Phase 1A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback