Home / Browse projects / Ratnagiri, Maharashtra / Cape of Bliss Phase 1A

Completed No litigation declared Plotted project

Cape of Bliss Phase 1A

By HOABL Management LLP

RG-MH-06463 · RERA P52800052438 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
307 of 385Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Cape of Bliss Phase 1A is a Plotted project by HOABL Management LLP in Ratnagiri, Maharashtra, registered with MahaRERA as P52800052438 on 25 Aug 2023. The registration is recorded completed; possession was promised by 30 Dec 2025. 78 of the 385 units on this registration are recorded sold or booked. 2 complaints are on record with the regulator.

At a glance

Project

  • NameCape of Bliss Phase 1A
  • TypePlotted
  • Location
    • Kolthare
    • Dapoli
    • Ratnagiri
    • Kolthare
    • Dapoli
    • 415712
  • Pincode415712
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800052438
  • ReraGenie IDRG-MH-06463

Builder

  • NameHOABL Management LLP
  • Entity typePartnership
  • PartnersSamujjwal Ghosh, Rakesh Ramdas Gupta
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Aug 2023
  • Promised completion30 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed104 files

Current status

20%78 of 385 units booked
19.9%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes70%
Street LightingYes70%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area121,591 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jul 2025

Approvals and building plan

Sanctioning authorityTown Planning, Ratnagiri
Permissible FSI68506.0
Proposed, not sanctioned68,506 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShirin Manzil Co-Op Housing Society, Ground Floor, Shop No 3 to 6, 18/24, St Marry Road, Mazgaon, Mu
Estimated costRs 35.31 cr
Cost incurredRs 7.03 cr
Work done19.9%
BuildingWingEstimatedIncurred
-NARs 35.31 crRs 7.03 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTansika Misal
ArchitectBhalachandra Gothankar
EngineerDinesh Balkrishna Satam
Chartered AccountantChirag Sarvaiya
Chartered AccountantU S MISHRA AND ASSOCIATES
PartnerRole in project
HOABL Management Private Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12400975Sukanya KannappanLodha Management LLP02/12/2024
CC12504534SANJAY MADANRAJ SHAHHOABL Management Private Limited19/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2026

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Signed_Form 2A_Cape of Bliss Phase 1A.pdf29 Jun 2026
Completion CertificateFile: Completion Certificate confirmation Email from MSRDC to MahaRERA_29122025.pdf8 Jan 2026
Completion CertificateFile: MSRDC notification 2025_highlighted.pdf7 Jan 2026
Building plan approval or NA orderFile: COB 1A - NA Order.pdf26 Dec 2025
Layout approvalFile: COB 1A - Layout.pdf26 Dec 2025
Completion CertificateFile: COB 1A - Completion Certificate.pdf26 Dec 2025
Completion CertificateFile: Encl - COB 1A - Completion Plans.pdf26 Dec 2025
Withdrawal Update Form 1File: Architect Certificate_Cape of Bliss 1A_Signed.pdf20 Oct 2025
Withdrawal Update Form 1File: AC - COB 1A.pdf20 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate_COB 1A_Signed.pdf20 Oct 2025
Withdrawal Update Form 2File: EC - COB 1A.pdf20 Oct 2025
Withdrawal Update Form 3File: CA Certificate_COB-1A_Signed.pdf20 Oct 2025
Withdrawal Update Form 3File: CA - COB-1A.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_COB 1A_signed.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A - Cape of Bliss Phase Ia.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: COB 1A - Achitect Certificate.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase 1A-P52800052438-CA certificate.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: COB 1A - Engineer Certificate.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A_signed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB1A.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP PH1A.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB1A.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Cape of bliss 1A.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_LM LLP-Cape of Bliss PH 1A.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB 1A.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Cape of Bliss 1A_signed.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 9 COB Phase 1a_Form 5_promoter signed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cape of Bliss - Phase 1A - Achitect Certificate-signed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cape of Bliss Phase IA- Engineer certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Cape of Bliss Phase 1A.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cape of Bliss Phase 1A - CA certificate.pdf20 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Lodha Management LLP.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_COB 1A_signed.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Cape of Bliss Phase 1A.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_Cob 1A.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC_COB 1A.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: LMLLP_1A.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Sold Booked Inventory-Cape of Bliss Phase 1A.pdf20 Jan 2024
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-1-10.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-11-20.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-21-30.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-31-40.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-41-60.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-61-90.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-91-120.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-121-140.pdf6 Dec 2023
Copy of the legal title reportFile: Detailed_Saraf Title Report - Cape of Bliss Phase 1A_compressed-141-158.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC_COB-1A_signed.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG- CoB 1a.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA COB Phase 1a.pdf17 Oct 2023
Other - TechnicalFile: AnyScanner_08_22_2023 (1) (8 files merged).pdf22 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca cERTIFICATE (1).pdf17 Aug 2023
Other - LegalFile: 1 217-2023- 93-7.pdf17 Aug 2023
Other - LegalFile: 2 999-2023 - 39-16.pdf17 Aug 2023
Other - LegalFile: 3 1233-2023 -37-4.pdf17 Aug 2023
Other - LegalFile: 4 2106-2023 - VIKAS ZAGADE.pdf17 Aug 2023
Other - LegalFile: 5 2108-2023- KISHOR V ZAGADE- SUPPLEMENTARY AFS.pdf17 Aug 2023
Other - LegalFile: 6 2319-2023 - 93-7.pdf17 Aug 2023
Other - LegalFile: 7 2463-2022 - 37-3.pdf17 Aug 2023
Other - LegalFile: 8 2615-2023 - 37-6, 37-7.pdf17 Aug 2023
Other - LegalFile: 8 2615-2023 - 37-6, 37-7.pdf17 Aug 2023
Other - LegalFile: 9 2909-2022 - 38-1.pdf17 Aug 2023
Other - LegalFile: 11 3419-2022 - 38-1.pdf17 Aug 2023
Other - LegalFile: 12 4968- 2022- 37-9.pdf17 Aug 2023
Other - LegalFile: 13 5104-2022 -37-9.pdf17 Aug 2023
Other - LegalFile: 14 AFS 2116-2023.pdf17 Aug 2023
Other - LegalFile: 15 AFS 3666-2022.pdf17 Aug 2023
Other - LegalFile: 15 AFS 3666-2022.pdf17 Aug 2023
Other - LegalFile: 16 AFS_1088-2023.pdf17 Aug 2023
Other - LegalFile: 17 AFS_3061-2022.pdf17 Aug 2023
Other - LegalFile: 18 AFS_3220-2022.pdf17 Aug 2023
Other - LegalFile: 19 AFS_3703-2022.pdf17 Aug 2023
Other - LegalFile: 20 AFS_4806-2022.pdf17 Aug 2023
Other - LegalFile: 10 2989-23 -37-6, 37-7.pdf17 Aug 2023
Copy of the legal title reportFile: COB 1A -TITLE REPORT-New (1).pdf12 Aug 2023
Other - TechnicalFile: CC Confirmation Email.pdf12 Aug 2023

How this compares with Ratnagiri

20%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Cape of Bliss Phase 1A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ratnagiri1,100+ in Ratnagiri

2 kmCape of Bliss Phase 1ACompleted 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: HOABL Management LLP

HOABL Management LLP has 2 registrations on MahaRERA, including Cape of Bliss Phase 1A and Waves of Bliss. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Cape of Bliss Phase 1A is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cape of Bliss Phase 1A?

The registered promoter entity is HOABL Management LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cape of Bliss Phase 1A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Cape of Bliss Phase 1A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Cape of Bliss Phase 1A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cape of Bliss Phase 1A?

The professionals named in the filing: Architect: Tansika Misal; Architect: Bhalachandra Gothankar; Engineer: Dinesh Balkrishna Satam; Chartered Accountant: Chirag Sarvaiya; Chartered Accountant: U S MISHRA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cape of Bliss Phase 1A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cape of Bliss Phase 1A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cape of Bliss Phase 1A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.