ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / OPULENT TOWER

Registered No litigation declared Residential / Group Housing project

OPULENT TOWER

By MAHESHWARI LANDMARK

RG-MH-05590 · RERA P52100077241 · Last updated on MahaRERA portal: 11 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Excavation, 90%
47 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

OPULENT TOWER is a Residential / Group Housing project by MAHESHWARI LANDMARK in Pune, Maharashtra, registered with MahaRERA as P52100077241 on 31 Jul 2024. Possession is promised by 30 Jun 2027. 7 of the 54 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameOPULENT TOWER
  • TypeResidential / Group Housing
  • Location
    • S B Patil School Road
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077241
  • ReraGenie IDRG-MH-05590

Builder

  • NameMAHESHWARI LANDMARK
  • Entity typePartnership
  • PartnersSANJAY SAKHARAM GAVHANE, ANAND YASHWANT BUCHADE
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

13%7 of 54 units booked
52.3%Work done, per cost certificate

Figures as on 11 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OPULENT TOWERNA77441054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 90%.

OPULENT TOWER: 40% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)75%
Podiums (if any)75%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Open Space26

Land and ownership18

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,995 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2025
LandownerVillageDistrict
NANASO DEVRAM BHONDVERavetPune
DHONDIBA DEVRAM BHONDVERavetPune
TARABAI DEVRAM BHONDVERavetPune
MARUTI JAYWANT BHONDVERavetPune
NANDKUMAR NIVRUTTI BHONDVERavetPune
SUNIL NIVRUTTI BHONDVERavetPune
NIRMALA SHREEDHAR BHASERavetPune
GULAB GOVIND NAVALETathwadePune
NAMDEV GOVIND NAVALETathwadePune
ASHOK GOVIND NAVALETathwadePune
KAILAS GOVIND NAVALETathwadePune
HARISHCHANDRA DIGAMBAR BHONDVERavetPune
AMOL BALU BHONDVERavetPune
ATUL BALU BHONDVERavetPune
MANJULA SHIVAJI KALOKHERavetPune
PRASHANT RAJENDRA BRAHMANKARRavetPune
UMESH GANESH KATEPimpale SaudagarPune
SANJAY SAKHARAM GAVHANEBhosariPune

Approvals and building plan

Sanctioning authorityPCMC CORPORATION
Permissible FSI12050.09
Proposed, not sanctioned5,050 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK LTD SHOP NO 1 PART BALLINA SECTOR NO 29 PLOT NO SDC 2 RAVET PRADHIKARAN PUNE 412101
Estimated costRs 15.56 cr
Cost incurredRs 8.14 cr
Work done52.31%
BuildingWingEstimatedIncurred
OPULENT TOWERNARs 15.56 crRs 8.14 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMRS ANJALI ARBAT
ArchitectDEEPAK PATIL
EngineerMR GAURAV BANG
Chartered AccountantCA ABHISHEKH DASHPUTE
Chartered AccountantD S SONAWANE & COMPANY
Chartered AccountantPankaj Patil
PartnerRole in project
MAHESHWARI LANDMARK-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arch Form 1 Q3.pdf11 Mar 2026
Withdrawal Update Form 1File: Arch Form 1 Q3.pdf11 Mar 2026
Withdrawal Update Form 2File: Q3 Form2.pdf11 Mar 2026
Withdrawal Update Form 2File: Q3 Form2.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q3 - FY 25-26.pdf11 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q3 - FY 25-26.pdf11 Mar 2026
Withdrawal Update Form 1File: Arch Form 1 Q2.pdf10 Mar 2026
Withdrawal Update Form 2File: Q2 Form2.pdf10 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q2 - FY 25-26.pdf10 Mar 2026
Form 2A (FY 2024-2025)File: Format Form - 2A SBP - FY 24-25.pdf14 Aug 2025
Form 5 (FY 2024-2025)File: Form 5 - FY 24-25.pdf14 Aug 2025
Form 1File: Arch Form 1 Q2.pdf8 Aug 2025
Form 2File: Q2 Form2.pdf8 Aug 2025
Form 3File: Form 3 - Q2 - FY 24-25.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q-2.pdf8 Aug 2025
Form 1File: Arch Form 1 Q3.pdf8 Aug 2025
Form 2File: Q3 Form2.pdf8 Aug 2025
Form 3File: Form 3 - Q3 - FY 24-25.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q-3.pdf8 Aug 2025
Form 1File: Arch Form 1 Q4.pdf8 Aug 2025
Form 2File: Q4 Form2.pdf8 Aug 2025
Form 3File: Form 3 - Q4 - FY 24-25.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q-4.pdf8 Aug 2025
Form 1File: Arch Form 1 Q1.pdf8 Aug 2025
Form 2File: Q1 Form2.pdf8 Aug 2025
Form 3File: Form 3 - Q1 - FY 25-26.pdf8 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Q-1.pdf8 Aug 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration Format A.pdf26 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: May-24.pdf26 Jul 2024
Copy of the legal title reportFile: TSR Part B.pdf16 Jul 2024
Copy of the legal title reportFile: TSR Part A.pdf16 Jul 2024
Other - LegalFile: 7 12 no 139 2 2 1.pdf15 Jul 2024
Other - LegalFile: 7 12 no 139 2 2 3.pdf15 Jul 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT - BY LEGAL REALTY LLP - OPULENT TOWER - Revised.pdf24 Jun 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER - Revised.pdf24 Jun 2024
Other - TechnicalFile: Annexure A Declaration Cum Undertaking.pdf10 May 2024
Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbrances.pdf6 May 2024
Details of encumbrances concerned to LegalFile: Self Declaration - Encumbrances.pdf6 May 2024
CERSAI detailsFile: Self Declaration - CERSAI.pdf6 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of interest in other Real Estate Org.pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Format Form - 2 SBP.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Format Form - 2A SBP - FY 19-20.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Format Form - 2A SBP - FY 20-21.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Format Form - 2A SBP - FY 21-22.pdf23 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Format Form - 2A SBP - FY 22-23.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked Inventory.pdf23 Apr 2024
Declaration in FORM BFile: Affidavit form B Builder PB Revised.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Self Declaration - Form 5.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Self Declaration - Form 5.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Self Declaration - Form 5.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Self Declaration - Form 5.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Self Declaration - Form 5.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Self Declaration - Form 5.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 - Revised.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 100424 - Revised.pdf11 Apr 2024
Details of encumbrances concerned to FinanceFile: Self Declaration - Encumbrances.pdf10 Apr 2024
Details of encumbrances concerned to LegalFile: Self Declaration - Encumbrances.pdf10 Apr 2024
Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT.pdf10 Apr 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION OF AGREEMENT.pdf10 Apr 2024
Declaration about Commencement CertificateFile: Deceleration about Commencement Certificate _compressed.pdf8 Apr 2024
Building plan approvalFile: scan 180_Compressed.pdf29 Mar 2024
Building plan approvalFile: scan 181_Compressed.pdf29 Mar 2024
Building plan approvalFile: scan 182_Compressed.pdf29 Mar 2024
Layout approvalFile: scan 180_Compressed.pdf29 Mar 2024
PAN CardFile: 3_PAN Landmark.pdf29 Mar 2024
Copy of Layout Approval (in case of layout)File: scan 180_Compressed.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 180_Compressed.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 181_Compressed.pdf29 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: scan 182_Compressed.pdf29 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: 20240322052604_Compressed.pdf29 Mar 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Bajirao ParkSr No 180 Pipeline Road Shinde Wasti Ravet Pune - 41210171CompletedSep 2023Aug 2023
Vyankat HomesVyankat Homes Sr No 73 Adarsh Colony Near Samarth Tower Kiwale Pune - 41210116CompletedMar 2022Feb 2022

How this compares with Pune

13%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OPULENT TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmOPULENT TOWERCompleted 115Lapsed / revoked 55Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 285 registered projects within 2 km.

Builder: MAHESHWARI LANDMARK

MAHESHWARI LANDMARK has 1 registration on MahaRERA, including OPULENT TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OPULENT TOWER is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OPULENT TOWER?

The registered promoter entity is MAHESHWARI LANDMARK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OPULENT TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OPULENT TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OPULENT TOWER?

The professionals named in the filing: Architect: MRS ANJALI ARBAT; Architect: DEEPAK PATIL; Engineer: MR GAURAV BANG; Chartered Accountant: CA ABHISHEKH DASHPUTE; Chartered Accountant: D S SONAWANE & COMPANY; Chartered Accountant: Pankaj Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OPULENT TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OPULENT TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OPULENT TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.