OM SAI SRA CHS LTD
RG-MH-40545 · RERA P51900033094 · Last updated on MahaRERA portal: 13 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OM SAI SRA CHS LTD is a Residential / Group Housing project by RIDDHI SIDDHI DEVELOPERS in Mumbai City, Maharashtra, registered with MahaRERA as P51900033094 on 9 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 38 of the 38 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameOM SAI SRA CHS LTD
- TypeResidential / Group Housing
- Location
- NRITYANJALI MARG
- TANK ROAD
- Mumbai City
- 400078
- Pincode400078
- RERA no.P51900033094
- ReraGenie IDRG-MH-40545
Builder
- NameRIDDHI SIDDHI DEVELOPERS
- Entity typePartnership
- PartnersBABULAL DEVCHANDBHAI PATEL, ROHIT CHANDRAKANT SAWANT, CHANDRAKANT YASHWANT SAWANT, BIPINKUMAR DEVCHAND PATEL, AMRATLAL DEVHAND PATEL, ANIL BHAGWAN DUDAVADKAR, PRANAY BIPIN MEHTA, PRABHUDAS RAJARAM SAWANT
- Other registrations7 more →
- Completed2 of 8
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Feb 2022
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2023)
- Buildings2 building records
- Documents filed75 files
Current status
Figures as on 13 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 2 | NA | 1 | 1 | 1 | 0 | 1 |
| BUILDING NO 3 | NA | 1 | 1 | 37 | 0 | 37 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 95%.
BUILDING NO 290%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 390%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| OM SAI SRA CHS LTD | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 2 | NA | Rs 2.70 cr | Rs 2.56 cr |
| BUILDING NO 3 | NA | Rs 1.75 cr | Rs 1.66 cr |
| - | NA | Rs 66.00 lakh | Rs 62.80 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRABHAKAR SATAM & ASSOCIATES |
| Engineer | VINAYAK CHOPDEKAR & ASSOCIATES |
| Chartered Accountant | SAMIR BHAGAT & CO |
| Partner | Role in project |
|---|---|
| RIDDHI SIDDHI DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to shortage of labour & material and other reasons there are delay in completion of the project. But as approximately 75% to 80% of the project is completed we need extension of only few months for the completion of the same.
Reason as filed by the promoterAt the outset it may be noted that 95% of the work is completed as mentioned in the architect certificate. Developers has simultaneously applied for OC. The application for OC goes through the rigorous process of verification and also required approval from the allied departments. Extension will also help us to enable sale and registration of the unsold flats. The proceeds from the flats will help the developer to complete the unfinished work and to pay the various statutory and other dues for the purpose of obtaining OC. Hence, we require extension for maximum 1 year till 31/12/2025. Your pos
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed75
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: 4 FORM 2A.pdf | 13 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 2 Jul 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: form 2compressed.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: form 2compressed.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: form 2compressed.pdf | 2 Jul 2026 |
| Withdrawal Update Form 2File: form 2compressed.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 2 Jul 2026 |
| Form 1File: 2 FORM 1 - 31st Decembar 2024.pdf | 22 Jun 2026 |
| Form 2File: 3 Form 2 Enginees Certificate.pdf | 22 Jun 2026 |
| Form 3File: 5 Form3.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: 9 SOLD INVENTORY.pdf | 22 Jun 2026 |
| Form 1File: Form 1.pdf | 22 Jun 2026 |
| Form 2File: form 2compressed.pdf | 22 Jun 2026 |
| Form 3File: Form 3.pdf | 22 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 22 Jun 2026 |
| Withdrawal Update Form 1File: Architect Certificate.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 22 Jun 2026 |
| Withdrawal Update Form 2File: FORM2.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 22 Jun 2026 |
| Form 5 (FY 2024-2025)File: FORM 5.pdf | 22 Jun 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: signed form 1.pdf | 24 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC BUILDING 2.PDF | 22 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC BUILDING 3.pdf | 22 Feb 2024 |
| Declaration in FORM BFile: FORM B SOCIETY.pdf | 22 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 22 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf | 22 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf | 22 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 22 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 22 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Riddhi Siddhi Developers Rera Certificate001.pdf | 22 Feb 2024 |
| Declaration in FORM BFile: FORM B_SOCIETY.pdf | 7 Feb 2022 |
| Declaration in FORM BFile: SELF DECLARATION OF NON EMCUMBRANCE.pdf | 7 Feb 2022 |
| Details of encumbrancesFile: SELF DECLARATION OF NON EMCUMBRANCE.pdf | 5 Feb 2022 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 5 Feb 2022 |
| CERSAI detailsFile: CERSAI.pdf | 5 Feb 2022 |
| OtherFile: FORM D.pdf | 5 Feb 2022 |
| Building plan approvalFile: IOA 1 Plan.pdf | 1 Feb 2022 |
| Building plan approvalFile: IOA 2 Plan.pdf | 1 Feb 2022 |
| Building plan approvalFile: IOA 3 Plan.pdf | 1 Feb 2022 |
| Copy of the legal title reportFile: FORM AT- A.pdf | 1 Feb 2022 |
| Copy of the legal title reportFile: ANNEXURE-1.pdf | 1 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA 1 Plan.pdf | 1 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA 2 Plan.pdf | 1 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA 3 Plan.pdf | 1 Feb 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTCERTIFICATE.pdf | 31 Jan 2022 |
| Proforma of Allotment letterFile: allotmentletter.pdf | 31 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 7 Jan 2022 |
| Layout approvalFile: IOA Layout Plan.pdf | 6 Jan 2022 |
| PAN CardFile: PANCARD.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_BABULAL.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_ROHIT SAWANT.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_CHANDRAKANT SAWANT.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_BIPINKUMAR PATEL.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_AMRATLAL PATEL.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_ANILDUDAWADKAR.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_PRABHUDAS SAWANT.pdf | 6 Jan 2022 |
| PAN CardFile: PAN_PANAYMEHTA.pdf | 6 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: IOA Layout Plan.pdf | 6 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC BUILDINGNO2.pdf | 6 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC BUILDINGNO3.pdf | 6 Jan 2022 |
| Declaration in FORM BFile: FORMB.PDF | 6 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf | 6 Jan 2022 |
| Proforma of Allotment letterFile: AGREEMENT.pdf | 6 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 75 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OM SAI SRA CHS LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TANK ROAD780+ in Mumbai City
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai City project, with the district possession charts
Builder: RIDDHI SIDDHI DEVELOPERS
RIDDHI SIDDHI DEVELOPERS has 8 registrations on MahaRERA, including VASUNDHARA and Riddhi Siddhi Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that OM SAI SRA CHS LTD shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if OM SAI SRA CHS LTD is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OM SAI SRA CHS LTD?
The registered promoter entity is RIDDHI SIDDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OM SAI SRA CHS LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OM SAI SRA CHS LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OM SAI SRA CHS LTD?
The professionals named in the filing: Architect: PRABHAKAR SATAM & ASSOCIATES; Engineer: VINAYAK CHOPDEKAR & ASSOCIATES; Chartered Accountant: SAMIR BHAGAT & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM SAI SRA CHS LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback