Home / Browse projects / Pune, Maharashtra / OM MANGALAM YASH

Registered No litigation declared Others project

OM MANGALAM YASH

By SHRI ASSOCIATES

RG-MH-27700 · RERA P52100034227 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
8 of 229Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

OM MANGALAM YASH is a Others project by SHRI ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100034227 on 25 Mar 2022. Possession is promised by 31 Dec 2026. 221 of the 229 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameOM MANGALAM YASH
  • TypeOthers
  • Location
    • NEAR EXPRESS HIGHWAY
    • VILLEGE KIWALE
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034227
  • ReraGenie IDRG-MH-27700

Builder

  • NameSHRI ASSOCIATES
  • Entity typeOthers
  • GSTIN27AAKAS6978E2ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNARESH THAKURDAS WADHWANI WADHWANI, AJAY DEVELOPERS DEVELOPERS, NIRMAL THAKURDAS WADHWANI WADHWANI, DHARMESH THAKURDAS WADHWANI WADHWANI
  • Other registrations4 more →
  • Completed1 of 5
  • Past their filed date1
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed146 files

Current status

97%221 of 229 units booked
98.7%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YASH - RESIDENTIALNA16141120112
KASTURI CORNERNA430117117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

YASH - RESIDENTIAL82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
KASTURI CORNER82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed258

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots258
Closed/Covered253
Open Space5
BuildingClosed/CoveredOpen SpaceTotal
YASH - RESIDENTIAL1645169
KASTURI CORNER89089

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,206 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityPimpri chinchwad Municipal Corporation
Permissible FSI20659.69
Proposed, not sanctioned8,975 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE NILAKH
Estimated costRs 74.00 cr
Cost incurredRs 73.01 cr
Work done98.66%
BuildingWingEstimatedIncurred
YASH - RESIDENTIALNARs 46.00 crRs 45.26 cr
KASTURI CORNERNARs 22.00 crRs 22.00 cr
-NARs 6.00 crRs 5.75 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANKALP DESIGNER
ArchitectA G BHILARE CONSULTANT PVT LTD
ArchitectGREE MEP CONSULTANT
EngineerVijay Gawade
Chartered AccountantV L JAIN AND COMPANY
Chartered AccountantV S A P AND COMPANY
PartnerRole in project
SHRI ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Feb 2024

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 FY2025-26 Q4 Final.pdf9 May 2026
Withdrawal Update Form 2File: Form 2 FY 2025-26 Q4 final.pdf9 May 2026
Withdrawal Update Form 3File: Form 3 F Y2025-26 Q4 Final.pdf9 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26 Final.pdf9 May 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3 - OMY.pdf5 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A for FY 2025-26 final.pdf15 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 FY 2024-25-OMY.pdf24 Nov 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FY 25-26 Q2 YASH.pdf31 Oct 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE YASH FY 2025-26 Q2 Final.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 3 Om Mangalam Yash FY 2025-26 Q2.pdf31 Oct 2025
Withdrawal Update Form 1File: Form 1_OMY Sign copy.pdf9 Sep 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE - YASH Q1 FY 2025-26.pdf9 Sep 2025
Withdrawal Update Form 3File: Signed Form 3.pdf9 Sep 2025
Withdrawal Update Form 1File: Form 1_OMY Sign copy.pdf2 Aug 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE - YASH Q1 FY 2025-26.pdf2 Aug 2025
Withdrawal Update Form 3File: Signed Form 3.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - Yash Q4.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEER CERTIFICATE 2A- Yash Q4.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: om mangalam yash form 3 Q4.pdf3 May 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Yash_11zon.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Yash Q3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Yash Q3.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Yash Q3 (1).pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Yash Q3.pdf1 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure - Yash Q3.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SA-FY2324-FORM 5-YASH.pdf4 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 24-25 OMY Q-2.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY24-25 Q2 YASH.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 24-25 - YASH Q2.pdf28 Oct 2024
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE - YASH Q2.pdf28 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE YASH.pdf8 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE YASH.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE YASH.pdf8 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 FY2024-25 Q1 OMY.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure OMY FY 23-24 Q4.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OMY FY 23-24 Q4.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OMY FY 23-24 Q4.pdf9 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OMY FY 23-24 Q4.pdf9 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A OMY FY 23-24.pdf9 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SA -OMY Completion certificate yash commercial 9-11-239(833).pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 YASH ARCHITECTS CERT FY 23-24 Q3.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 YASH ENGG CERT Q3 FY 23-24 20 -01-2024.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: YASH PROMOTER DISCLOSURE FY 23-24 Q3.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Form 3 - Q3 OMY.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Q1 OMY Revised.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Form 5 (OMY) FY 22-23.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SA YASH - ARCHITECTS CERTIFICATE FY 23-24 Q2.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT AC NO 258605017547 FY 23-24 Q2.pdf8 Nov 2023
Disclosure of sold/ booked inventoryFile: SA- YASH PROMOTER DISCLOSURE FY 23-24 Q2 .pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OMY Q2 Form 3.pdf8 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Compressed.pdf25 Sep 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Q4 OMY.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Q1 OMY.pdf24 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1 OMY.pdf22 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 OMY.pdf22 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form-3 FY 23-24 Q1 OMY.pdf22 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: EN Certi 2A OMY.pdf16 Jun 2023
Other - FinanceFile: CA Certificate - OMY (Q1 May-23) FY 2023-24.pdf13 Jun 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances - Legal.pdf6 Jun 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances - Legal.pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q1 FY 23-24 OMY.pdf5 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q1 FY 23-24 OMY.pdf5 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - OMY (Q1 May-23) FY 2023-24.pdf3 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 22-23 YASH.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate Q-4 OMY.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Q-4 OMY.pdf3 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q-4 OMY.pdf3 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FY 22-23 Q3.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate FY 22-23 Q3.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: PROMOTERS DISCLOSURE FY 22-23 Q3.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Q3 OMY.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form 5 FY 2021-22-OMY.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q2_compressed.pdf5 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FY 22-23 Q2.pdf5 Nov 2022
Disclosure of sold/ booked inventoryFile: Promoters Disclosure Q2.pdf5 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Q2.pdf5 Nov 2022
Proforma of Agreement for saleFile: Draft Agreement to sale dated 26-09-2022.pdf31 Oct 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Sai ParadisePlot No C S No 12-1 To 7 Bangalore Pune Highway Punavale Pune- 411033368CompletedDec 2021Late, Mar 2022

How this compares with Pune

97%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM MANGALAM YASH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLEGE KIWALE13,700+ in Pune

2 kmOM MANGALAM YASHCompleted 81Lapsed / revoked 51Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 236 registered projects within 2 km.

Builder: SHRI ASSOCIATES

SHRI ASSOCIATES has 5 registrations on MahaRERA, including OM MANGALAM CHAITANYA and OM MANGALAM YASH. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OM MANGALAM YASH is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM MANGALAM YASH?

The registered promoter entity is SHRI ASSOCIATES, an others as per the filing. Its GSTIN 27AAKAS6978E2ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM MANGALAM YASH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM MANGALAM YASH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM MANGALAM YASH?

The professionals named in the filing: Architect: SANKALP DESIGNER; Architect: A G BHILARE CONSULTANT PVT LTD; Architect: GREE MEP CONSULTANT; Engineer: Vijay Gawade; Chartered Accountant: V L JAIN AND COMPANY; Chartered Accountant: V S A P AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM MANGALAM YASH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM MANGALAM YASH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM MANGALAM YASH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.