Home / Browse projects / Pune, Maharashtra / NYATI ESTEBAN I

Completed No litigation declared Residential / Group Housing project

NYATI ESTEBAN I

By NYATI REALTORS LLP

RG-MH-09539 · RERA P52100003767 · Last updated on MahaRERA portal: 20 Sep 2021

Source: official MahaRERA filing

Red flags

  • 10 complaints at MahaRERA
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
53 of 77Construction stages doneacross 7 buildings; furthest along: Internal walls, 95%
10Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

NYATI ESTEBAN I is a Residential / Group Housing project by NYATI REALTORS LLP in Pune, Maharashtra, registered with MahaRERA as P52100003767 on 6 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2022. The completion date has moved by 9 months from the original filing. 10 complaints are on record with the regulator.

At a glance

Project

  • NameNYATI ESTEBAN I
  • TypeResidential / Group Housing
  • Location
    • Mohammadwadi
    • Mohammaswadi
    • UNDRI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003767
  • ReraGenie IDRG-MH-09539

Builder

  • NameNYATI REALTORS LLP
  • Entity typeOthers
  • GSTIN27AALFN3096J1ZR
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsNITIN DWARKADAS NYATI, PIYUSH NITIN NYATI
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 30 Jun 2021)
  • Buildings7 building records
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA140000
A2NA140000
A3NA140000
BNA150000
C1NA140000
C2NA140000
C3NA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 20 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

53 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Internal walls, at 95%.

A179%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
A266%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
A372%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
B56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes65%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes70%
Street LightingYes65%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes70%
Energy managemcntYes65%
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Parking filed306

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots306
Closed/Covered306
BuildingClosed/CoveredTotal
A14646
A24646
A34646
B3030
C14646
C24646
C34646

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,677 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
NYATI REALTORS LLPPune (M Corp.)Pune
NITIN D NYATIPune (M Corp.)Pune
NYATI BUILDERS PVT LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI31917.9
Proposed, not sanctioned28,518 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHARADI PUNE

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
NYATI REALTORS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100010125Jun 2021 → Sep 2021

Reason as filed by the promoterMentioned in the Explanatory Note to Form No. E which is uploaded herewith.

Litigation declared5

CaseCourtStatus
403/2012CIVIL JUDGE SENIOR DIVISION PUNEDISPOSED
188/2014CIVIL JUDGE SENIOR DIVISION PUNEUNREADY HEARING
2599/2010CIVIL JUDGE SENIOR DIVISION PUNEHEARING
RTS APPEAL 96/2015ADDITIONAL COLLECTOR PUNEHEARING
1753/2008Civil Judge Senior Division PuneHearing

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC005000000010758Muzammil Abdul Majeed DesaiMarvel Realtors23/12/2017
CC005000000000363Shakunata ZanvarVishwajeet Jhavar07/10/2017
CC005000000010432Ajay Kumar PatelMarvel Zeta Devlopers Pvt Ltd20/12/2017
CC005000000010557Swapnil and Preeti MitkariMarvel Builder19/11/2017
CC005000000011023ARJUN RAWATMARVEL ZETA DEVELOPERS PVT LTD26/03/2018
CC005000000011457Vikas Deo ShettMARVEL ZETA DEVELOPERS PVT LTD25/04/2018
CC005000000011721Wincy Dominic Savio DsouzaMarvel Zeta Developers Pvt Ltd. & Ors10/07/2018
CC005000000022260Kulwant Singh Reen & Gurpreet Kour ReenMarvel Zeta Developers Pvt Ltd19/11/2018
CC005000000022868Nyati Realtors LLPMr. Ajay Kumar Patel05/04/2019
CC005000000258953Neha SharmaNYATI REALTORS LLP03/06/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jun 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Aug 2021

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg Certificate Nyati Esteban I.pdf20 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf3 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf3 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf23 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory Details 30062021 1MB.pdf12 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 201819.pdf12 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 201920.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: Annexure.pdf6 Jul 2021
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf2 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 with Annexure.pdf2 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf8 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Part II B.pdf15 Apr 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 B wing.pdf15 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf16 Jan 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf31 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf12 Oct 2020
Annual Audit Report of Statutory CA (Form 5)File: Nyati Esteban I.pdf30 Sep 2020
Proforma of Allotment letterFile: ESTEBAN I UNIT AGREE FOR 4 INCOMPLETE BUILDINGS 03082020.pdf3 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A.pdf9 Jul 2020
Proforma of Allotment letterFile: UNIT-AGR-NYATI-ESTEBAN-7 JULY 2020.pdf8 Jul 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf6 Jul 2020
Layout approvalFile: Sanction Layout BP.pdf25 Jun 2020
Layout approvalFile: Sanction Layout DP.pdf25 Jun 2020
Building plan approvalFile: A1 Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: A2 Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: A2 Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: A3 Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: A3 Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: B Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: B Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: C1 Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: C1 Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: C2 Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: C2 Odd Even Floor Plans.pdf25 Jun 2020
Building plan approvalFile: C3 Even Floor Elevation Sections.pdf25 Jun 2020
Building plan approvalFile: C3 Odd Floor Plans.pdf25 Jun 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout BP.pdf25 Jun 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout DP.pdf25 Jun 2020
Building Plan Approval (IOD)File: A1 Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: A2 Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: A2 Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: A3 Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: A3 Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: B Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: B Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: C1 Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: C1 Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: C2 Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: C2 Odd Even Floor Plans.pdf25 Jun 2020
Building Plan Approval (IOD)File: C3 Even Floor Elevation Sections.pdf25 Jun 2020
Building Plan Approval (IOD)File: C3 Odd Floor Plans.pdf25 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 May 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 May 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 27-01-2020.pdf15 Feb 2020
Details of encumbrancesFile: INDENTURE OF MORTGAGE 24755-2019.pdf11 Feb 2020
Proforma of Allotment letterFile: UNIT AGR NYATI ESTEBAN revised 24122019 CLEAN 2.pdf27 Jan 2020
Proforma of Allotment letterFile: UNIT AGR NYATI ESTEBAN.pdf24 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3.pdf6 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1.pdf6 Dec 2019
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2.pdf6 Dec 2019
Annual Audit Report of Statutory CA (Form 5)File: Nyati Esteban I_opt.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Esteban I.pdf10 Jul 2019
Copy of the legal title reportFile: Title Certificate 1st part.pdf4 May 2019
Copy of the legal title reportFile: Title Certificate 2nd Part.pdf4 May 2019
Copy of the legal title reportFile: Title Certificate 3rd Part.pdf4 May 2019
Details of encumbrancesFile: Index II of Altico mortgage for 375 crs.pdf6 Jun 2018
Copy of the legal title reportFile: Izara Add Title Report.pdf26 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IZARA.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate A1 A2 A3 B C1 C2 C3.pdf28 Jul 2017
Certificates of CA (Form 3)File: C A Certificate.pdf28 Jul 2017
Proforma of Allotment letterFile: Allotment Letter And Unit Agreement.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report.pdf27 Jul 2017
Layout approvalFile: Sanction Layout-FSI- Sheet No New.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sanction Layout-FSI- Sheet No New.pdf26 Jul 2017
Declaration in FORM BFile: Affidevit.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf26 Jul 2017
Building plan approvalFile: Sheet No17.pdf14 Jul 2017
Building plan approvalFile: Sheet No18.pdf14 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI ESTEBAN I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mohammaswadi13,700+ in Pune

2 kmNYATI ESTEBAN ICompleted 90Lapsed / revoked 34Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 208 registered projects within 2 km.

Builder: NYATI REALTORS LLP

NYATI REALTORS LLP has 3 registrations on MahaRERA, including NYATI ESTEBAN I and NYATI ESTEBAN II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI ESTEBAN I is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI ESTEBAN I?

The registered promoter entity is NYATI REALTORS LLP, an others as per the filing. Its GSTIN 27AALFN3096J1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI ESTEBAN I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against NYATI ESTEBAN I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for NYATI ESTEBAN I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NYATI ESTEBAN I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI ESTEBAN I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI ESTEBAN I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.