Home / Browse projects / Pune, Maharashtra / NYATI EQUINOX II

Registered Litigation declared Others project

NYATI EQUINOX II

By MIHIR HOMES ENTERPRISE LLP

RG-MH-35181 · RERA P52100054912 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 7 cases
  • Rs 100.00 crore secured on the land, in favour of Kotak Mahindra Investments Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 90%
142 of 238Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

NYATI EQUINOX II is a Others project by MIHIR HOMES ENTERPRISE LLP in Pune, Maharashtra, registered with MahaRERA as P52100054912 on 15 Feb 2024. Possession is promised by 31 May 2027. 96 of the 238 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameNYATI EQUINOX II
  • TypeOthers
  • Location
    • MULSHI
    • BAWDHAN
    • Bavdhan Kh.
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054912
  • ReraGenie IDRG-MH-35181

Builder

  • NameMIHIR HOMES ENTERPRISE LLP
  • Entity typePartnership
  • GSTIN27ABBFM8951G2Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersNITIN DWARKADAS NYATI, PIYUSH NITIN NYATI, PRANAV NITIN NYATI, MAHENDRA FAKIRCHAND SABADRA, MIHIR MAHENDRA SABADRA, VEDANT MAHENDRA SABADRA
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2024PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2024
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed113 files

Current status

40%96 of 238 units booked
45.8%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG ANA30271044108
BLDG BNA30271300130

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 90%.

BLDG A38%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)75%
Plinth80%
Stilt Floor0%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Sanitary Fittings within the flats / premises13%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.7%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.6%
BLDG B35%
ActivityProgress
Excavation90%
Basement (if any)0%
Podiums (if any)75%
Plinth80%
Stilt Floor0%
Slabs of Super Structure61%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Sanitary Fittings within the flats / premises9%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.7%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes26%
Storm Water DrainsYes7%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes16%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed121

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots121
Closed/Covered2
Open Space119
BuildingClosed/CoveredOpen SpaceTotal
BLDG A16869
BLDG B15152

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Investments Limited
Secured amountRs 100.00 crore
CERSAI search filedYes
Declared on12 Jul 2025
LandownerVillageDistrict
HEMANT PANDURANG PIMPALEKothrudPune
RAJENDRA PANDURANG PIMPALEKothrudPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI21763.42
Proposed, not sanctioned21,763 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBAKRE AVENUE, F-P-NO 226/3, PUNE 411004
Estimated costRs 84.16 cr
Cost incurredRs 38.51 cr
Work done45.76%
BuildingWingEstimatedIncurred
BLDG ANARs 45.65 crRs 21.06 cr
BLDG BNARs 27.41 crRs 16.48 cr
-NARs 11.10 crRs 97.61 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjeev Mukund Mehta Sanjeev Mehta
ArchitectShirish Dasnurkar and Associates
EngineerNITESH BINAWAT
EngineerRAJENDRA RUPNAR
EngineerVishwanath Dhande
EngineerJW Consultant LLP PMC LIC NO 20
Chartered AccountantMilani Gattani & Co.
Chartered AccountantVIPIN GUJARATHI AND ASSOCIATES
Chartered AccountantKUSHAL D JAIN
PartnerRole in project
MIHIR HOMES ENTERPRISE LLP-

Litigation declared7

CaseCourtStatus
878/2019Civil Judge Senior Division PuneClosed
592/2020Civil Judge Junior Division PMCOngoing
592/2020CIVIL COURT SENIOR DIVISIONOngoing
12405/2024BOMBAY HIGH COURTOngoing
71/2025BOMBAY HIGH COURTOngoing
1082/2025BOMBAY HIGH COURTOngoing
494/2025CIVIL COURTOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 New Format.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 New Format.pdf28 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: Nyati Equinox II Form 2A 2025-2026.pdf23 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2A.pdf25 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf21 Jan 2026
Withdrawal Update Form 2File: FORM 2 NEW FORMAT.pdf21 Jan 2026
Withdrawal Update Form 3File: FORM 3.pdf21 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2 New Format.pdf31 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf31 Oct 2025
Form 5 (FY 2024-2025)File: Equinox II-Form 5.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Nyati Equinox II Form 2A 2024-2025.pdf23 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nyati Equinox II Form 3.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Apr 2025
Copy of the legal title reportFile: Legal Title Report dt 30042024.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Jan 2025
Proforma of Agreement for saleFile: EQUINOX II UNIT AGREE 21112024.pdf22 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf16 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Nyati Equinox II - Form 5.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Jul 2024
Proforma of Agreement for saleFile: EQUINOX II UNIT AGREE 26042024 REVISED 03072024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf18 May 2024
Building plan approvalFile: A B GR Floor Plans.pdf7 May 2024
Building plan approvalFile: A B Typ Floor Plans.pdf7 May 2024
Building Plan Approval / NA Order for plotted developmentFile: A B GR Floor Plans.pdf7 May 2024
Building Plan Approval / NA Order for plotted developmentFile: A B Typ Floor Plans.pdf7 May 2024
Building plan approvalFile: A B GR First Flr.pdf24 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B GR First Flr.pdf24 Apr 2024
Building plan approvalFile: A B Section.pdf23 Apr 2024
Building plan approvalFile: A B Elevation.pdf23 Apr 2024
Building plan approvalFile: A B Section.pdf23 Apr 2024
Building plan approvalFile: A B Typ Flr Plan.pdf23 Apr 2024
Building plan approvalFile: A B-Basement 1 plan.pdf23 Apr 2024
Building plan approvalFile: A B-Basement 2 plan.pdf23 Apr 2024
Layout approvalFile: Layout.pdf23 Apr 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B Section.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B Elevation.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B Section.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B Typ Flr Plan.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B-Basement 1 plan.pdf23 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: A B-Basement 2 plan.pdf23 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mihir Homes Form 3 Equinox II_11zon.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf8 Apr 2024
Other - TechnicalFile: A B MHADA Gr Typ Floor.pdf13 Feb 2024
Other - TechnicalFile: Sanction BP Layout.pdf13 Feb 2024
Other - TechnicalFile: A B MHADA Parking B1.pdf8 Feb 2024
Other - TechnicalFile: A B MHADA Parking B2.pdf8 Feb 2024
Other - TechnicalFile: A B MHADA Refuge Floor.pdf8 Feb 2024
Other - TechnicalFile: Ele.pdf8 Feb 2024
Other - TechnicalFile: Section AA.pdf8 Feb 2024
Other - TechnicalFile: Section BB.pdf8 Feb 2024
Details of encumbrances concerned to FinanceFile: LEGAL AND FINANCE DECLARATION 12012024.pdf12 Jan 2024
Details of encumbrances concerned to LegalFile: LEGAL AND FINANCE DECLARATION 12012024.pdf12 Jan 2024
CERSAI detailsFile: CERSAI DECLARATION 12012024.pdf12 Jan 2024
Other - FinanceFile: CERSAI DECLARATION 12012024.pdf12 Jan 2024
Other - TechnicalFile: AutoDCR.pdf12 Jan 2024
Proforma of Agreement for saleFile: EQUINOX II UNIT AGREE REVISED 191223 CLEAN.pdf19 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account Details.pdf19 Dec 2023
Layout approvalFile: SANCTION BP LAYOUT.pdf18 Dec 2023
Copy of Layout Approval (in case of layout)File: SANCTION BP LAYOUT.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Dec 2023
Copy of the legal title reportFile: Legal Title Report 12122023.pdf13 Dec 2023

How this compares with Pune

40%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NYATI EQUINOX II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAWDHAN13,700+ in Pune

2 kmNYATI EQUINOX IICompleted 68Lapsed / revoked 45Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: MIHIR HOMES ENTERPRISE LLP

MIHIR HOMES ENTERPRISE LLP has 2 registrations on MahaRERA, including NYATI EQUINOX I and NYATI EQUINOX II. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NYATI EQUINOX II is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NYATI EQUINOX II?

The registered promoter entity is MIHIR HOMES ENTERPRISE LLP, a partnership as per the filing. Its GSTIN 27ABBFM8951G2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NYATI EQUINOX II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NYATI EQUINOX II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NYATI EQUINOX II?

The professionals named in the filing: Architect: Sanjeev Mukund Mehta Sanjeev Mehta; Architect: Shirish Dasnurkar and Associates; Engineer: NITESH BINAWAT; Engineer: RAJENDRA RUPNAR; Engineer: Vishwanath Dhande; Engineer: JW Consultant LLP PMC LIC NO 20. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NYATI EQUINOX II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NYATI EQUINOX II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NYATI EQUINOX II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.