ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / NOVA EXOTICA

Registered No litigation declared Residential / Group Housing project

NOVA EXOTICA

By Navkar Venture

RG-MH-07136 · RERA P99000055282 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
15 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 85%
189 of 201Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

NOVA EXOTICA is a Residential / Group Housing project by Navkar Venture in Palghar, Maharashtra, registered with MahaRERA as P99000055282 on 14 Mar 2024. Possession is promised by 6 Dec 2028. 12 of the 201 units on this registration are recorded sold or booked, and 15 of 55 construction stages are filed complete.

At a glance

Project

  • NameNOVA EXOTICA
  • TypeResidential / Group Housing
  • Location
    • DEVISHA ROAD
    • PALGHAR
    • 401404
  • Pincode401404
  • RERA no.P99000055282
  • ReraGenie IDRG-MH-07136

Builder

  • NameNavkar Venture
  • Entity typePartnership
  • PartnersLokesh Badamiya, BALUSINGH RATHOD

Key dates

this monthRegisteredMar 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion6 Dec 2028
  • Revised completionNone
  • Buildings5 building records
  • Documents filed95 files

Current status

6%12 of 201 units booked
61.1%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 1NA77707
Building No 2NA6612012
Building No 5NA7742042
Building No 6NA7728028
Building No 7 A/B/C/D WingNA771120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

Building No 135%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 235%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 535%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 635%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No 7 A/B/C/D Wing35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed173

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots173
Closed/Covered30
Open Space143
BuildingClosed/CoveredOpen SpaceTotal
Building No 1033
Building No 2088
Building No 503030
Building No 602020
Building No 7 A/B/C/D Wing3082112

Land and ownership19

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,252 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Mar 2026
LandownerVillageDistrict
HIRARAM SONARAM CHOUDHARYPalghar Palghar
Bharat Himmatlal JainPalghar Palghar
Sumeet Phoolchand JainPalghar Palghar
Khubilal Ganeshlal JainPalghar Palghar
Ankit Vishwanath BagadiyaPalghar Palghar
Amar Ratanlal BafnaPalghar Palghar
Chandanbala Dinesh JainVasai-Virar City (M Corp)Palghar
Manisha Lokesh JainPalghar Palghar
Reena Bhavesh JainPalghar Palghar
Pankaj Arjunlal JainPalghar Palghar
Jimesh Laharilal JainPalghar Palghar
Laxman Mohanlal ChoudhariKurlaMumbai Suburban
Ganesh Bheraram ChoudharyPalghar Palghar
Shwetha Vikrant PatkarPalghar Palghar
Kshama Subhash PatkarPalghar Palghar
Shantilal Mangilal JainUmberpada Palghar
Mukesh Paras KothariVangaonPalghar
Chandanmal Sukhraj JainPalghar Palghar
Sanjay Ganeshlal JainPalghar Palghar

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI14997.08
Proposed, not sanctioned14,997 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAGHUNANDAN CO-OP HSG SOC MAHIM ROAD PALGHAR
Estimated costRs 44.01 cr
Cost incurredRs 26.91 cr
Work done61.14%
BuildingWingEstimatedIncurred
Building No 7 A/B/C/D WingNARs 18.64 crRs 12.11 cr
Building No 5NARs 10.34 crRs 6.72 cr
Building No 6NARs 6.60 crRs 4.29 cr
Building No 2NARs 2.92 crRs 1.90 cr
Building No 1NARs 2.90 crRs 1.89 cr
-NARs 2.62 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRIKANT Yevale
ArchitectAnjalis Associates
EngineerAnjali's Associates
Chartered AccountantVirendra K Tare
Chartered AccountantPratik Thakur
PartnerRole in project
Navkar Venture-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 6 Dec 2028

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1.pdf5 Aug 2026
Withdrawal Update Form 2File: Form 2Q1.pdf5 Aug 2026
Withdrawal Update Form 3File: Form3 Q1.pdf5 Aug 2026
Withdrawal Update Form 1File: Form 1 Venture Q 1 Signed.pdf4 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2 Venture Q1 Signed.pdf4 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf4 Aug 2026
Withdrawal Update Form 3File: Navkar venture Form 3 Signed.pdf4 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf4 Aug 2026
Form 1File: Architect certificate Navkar venture 31 march 2025 (1).pdf31 Jul 2026
Form 2File: Engineer certificate Navkar venture 31 march 2025.pdf31 Jul 2026
Form 3File: Navkar Venture RERA Form 3.pdf31 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Jul 2026
Form 1File: Architect certificate Navkar venture 31 march 2025 (1).pdf31 Jul 2026
Form 2File: Engineer certificate Navkar venture 31 march 2025.pdf31 Jul 2026
Form 3File: Navkar Venture RERA Form 3.pdf31 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Jul 2026
Form 1File: Architect certificate Navkar venture 31 march 2025 (1).pdf31 Jul 2026
Form 2File: Engineer certificate Navkar venture 31 march 2025.pdf31 Jul 2026
Form 3File: Navkar Venture RERA Form 3.pdf31 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Jul 2026
Form 1File: Architect certificate Navkar venture 31 march 2025 (1).pdf31 Jul 2026
Form 2File: Engineer certificate Navkar venture 31 march 2025.pdf31 Jul 2026
Form 3File: Navkar Venture RERA Form 3.pdf31 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf31 Jul 2026
Withdrawal Update Form 1File: from 1.pdf31 Jul 2026
Withdrawal Update Form 1File: from 1.pdf31 Jul 2026
Withdrawal Update Form 1File: from 1.pdf31 Jul 2026
Withdrawal Update Form 1File: from 1.pdf31 Jul 2026
Withdrawal Update Form 2File: From 2.pdf31 Jul 2026
Withdrawal Update Form 2File: From 2.pdf31 Jul 2026
Withdrawal Update Form 2File: From 2.pdf31 Jul 2026
Withdrawal Update Form 2File: From 2.pdf31 Jul 2026
Withdrawal Update Form 3File: Navkar Venture Form 3 upto 31122025.pdf31 Jul 2026
Withdrawal Update Form 3File: Navkar Venture Form 3 upto 31122025.pdf31 Jul 2026
Withdrawal Update Form 3File: Navkar venture Form 3 Signed.pdf31 Jul 2026
Withdrawal Update Form 3File: Navkar venture Form 3 Signed.pdf31 Jul 2026
Form 2A (FY 2023-2024)File: FOrm 2A.pdf31 Jul 2026
Form 2A (FY 2024-2025)File: FOrm 2A.pdf31 Jul 2026
Form 2A (FY 2025-2026)File: FOrm 2A.pdf31 Jul 2026
Form 5 (FY 2023-2024)File: Form 5.pdf31 Jul 2026
Withdrawal Update Form 1File: Architect certificate (navkar venture) 28-Feb-2026 10-37-14.pdf24 Jul 2026
Withdrawal Update Form 2File: Engineering certificate navkar venture.pdf24 Jul 2026
Withdrawal Update Form 3File: Navkar Venture Form 3 upto 31122025.pdf24 Jul 2026
Withdrawal Update Form 1File: Architect certificate (navkar venture) 28-Feb-2026 10-37-14.pdf20 Mar 2026
Withdrawal Update Form 2File: Engineering certificate navkar venture.pdf20 Mar 2026
Withdrawal Update Form 3File: Navkar Venture Form 3 upto 31122025.pdf20 Mar 2026
Withdrawal Update Form 1File: form 1.pdf14 Mar 2026
Withdrawal Update Form 2File: form 2.pdf14 Mar 2026
Withdrawal Update Form 3File: Form 3 Signed.pdf14 Mar 2026
Form 5 (FY 2024-2025)File: navkar venture form5.pdf8 Jan 2026
Form 1File: Architect certificate Navkar venture form1 30th june 2025.pdf17 Nov 2025
Form 2File: Engineer certificate Navkar venture form2 30th june 2025.pdf17 Nov 2025
Form 3File: Navkar Venture Form 3 -30-06-2025.pdf17 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf17 Nov 2025
Form 1File: Architect certificate Navkar venture 31 march 2025 (1).pdf20 Aug 2025
Form 2File: Engineer certificate Navkar venture 31 march 2025.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf20 Aug 2025
Form 3File: Navkar Venture RERA Form 3.pdf20 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 architect_11zon.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_11zon.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 engineer_11zon (1).pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 upload_11zon (1).pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 1.pdf22 Feb 2024
Other - TechnicalFile: annexure A.pdf22 Feb 2024
Copy of the legal title reportFile: NAVKAR VENTURE NEW RERA TITLE.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf26 Dec 2023
Proforma of Agreement for saleFile: Agreement final 1.pdf26 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for agreement.pdf26 Dec 2023
Layout approvalFile: Layout.pdf25 Dec 2023
Building plan approvalFile: Building_1.pdf25 Dec 2023
Building plan approvalFile: Building_2.pdf25 Dec 2023
Building plan approvalFile: Building_5.pdf25 Dec 2023
Building plan approvalFile: Building_6.pdf25 Dec 2023
Building plan approvalFile: Building_7.pdf25 Dec 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance merged.pdf25 Dec 2023
Details of encumbrances concerned to LegalFile: No Encumbrance merged.pdf25 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf25 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building_1.pdf25 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building_2.pdf25 Dec 2023

How this compares with Palghar

6%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NOVA EXOTICA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALGHAR3,200+ in Palghar

Builder: Navkar Venture

Navkar Venture has 1 registration on MahaRERA, including NOVA EXOTICA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NOVA EXOTICA is delayed beyond 6 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NOVA EXOTICA?

The registered promoter entity is Navkar Venture, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NOVA EXOTICA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NOVA EXOTICA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NOVA EXOTICA?

The professionals named in the filing: Architect: SHRIKANT Yevale; Architect: Anjalis Associates; Engineer: Anjali's Associates; Chartered Accountant: Virendra K Tare; Chartered Accountant: Pratik Thakur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NOVA EXOTICA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NOVA EXOTICA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NOVA EXOTICA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.