NIYATI LAKE CROWN
By SHREE SWAMI SAMARTH ENTERPRISES
RG-MH-19182 · RERA P51700078241 · Last updated on MahaRERA portal: 21 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Rs 5.00 crore secured on the land, in favour of MotilalOswalHomeFinanceLimited
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIYATI LAKE CROWN is a Others project by SHREE SWAMI SAMARTH ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700078241 on 29 Nov 2024. Possession is promised by 31 Dec 2027. 70 of the 191 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameNIYATI LAKE CROWN
- TypeOthers
- Location
- MOGHARPADA
- SECTOR 6 GHODBUNDER
- Thane (M Corp.)
- Thane
- 400615
- Pincode400615
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700078241
- ReraGenie IDRG-MH-19182
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Nov 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings4 building records
- Documents filed90 files
Current status
Figures as on 21 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIYATI LAKE CROWN WING A | Wing A | 7 | 7 | 67 | 9 | 76 |
| NIYATI LAKE CROWN WING C | Wing C | 4 | 3 | 3 | 0 | 3 |
| NIYATI LAKE CROWN WING B | Wing B | 8 | 7 | 26 | 12 | 38 |
| NIYATI LAKE CROWN WING D | Wing D | 8 | 7 | 74 | 0 | 74 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.
NIYATI LAKE CROWN WING A · wing Wing A35%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 95% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 45% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NIYATI LAKE CROWN WING C · wing Wing CNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
NIYATI LAKE CROWN WING B · wing Wing BNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
NIYATI LAKE CROWN WING D · wing Wing DNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed188
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| NIYATI LAKE CROWN WING A Wing A | 39 | 26 | 65 |
| NIYATI LAKE CROWN WING C Wing C | 9 | 8 | 17 |
| NIYATI LAKE CROWN WING B Wing B | 0 | 10 | 10 |
| NIYATI LAKE CROWN WING D Wing D | 60 | 36 | 96 |
Land and ownership26
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Rupesh Bhupesh Tare | Thane (M Corp.) | Thane |
| Jayesh Anant Tare | Thane (M Corp.) | Thane |
| Mohini Charudatta Mukdam | Thane (M Corp.) | Thane |
| Mohan Vishnu Kasar | Thane (M Corp.) | Thane |
| Ranjana Mohan Kasar | Thane (M Corp.) | Thane |
| Sushma Ganesh Bhoir | Thane (M Corp.) | Thane |
| Alpana Sandesh Rane | Thane (M Corp.) | Thane |
| Pratidnya Nandukumar Bhoir | Thane (M Corp.) | Thane |
| Vaishali Mohan Kasar | Thane (M Corp.) | Thane |
| Suraj Mohan Kasar | Thane (M Corp.) | Thane |
| Nutan Praksh Bhokare | Thane (M Corp.) | Thane |
| Rekha Ravindra Patil | Thane (M Corp.) | Thane |
| Mrs Snehatala Jayesh patil | Thane (M Corp.) | Thane |
| Mrs Pratibha Kishor Patil | Thane (M Corp.) | Thane |
| Manda Rajesh Tare | Thane (M Corp.) | Thane |
| Viraj Rajesh Tare through his legal guardian Manda | Thane (M Corp.) | Thane |
| Harshl Rajesh tare through legal Manda | Thane (M Corp.) | Thane |
| Jigar Rajesh Tare through his legal guardian Tare | Thane (M Corp.) | Thane |
| Smt. Sunanda Vishwanath Thakur | Thane (M Corp.) | Thane |
| Kanchan Vishwanath Thakur | Thane (M Corp.) | Thane |
| Vaishali Vinod Umratkar | Thane (M Corp.) | Thane |
| Kumari Nita Vishwanath Thakur | Thane (M Corp.) | Thane |
| Kavita Shivdas Mhatre | Thane (M Corp.) | Thane |
| Nisha Mahendra Mhatre | Thane (M Corp.) | Thane |
| Mrs Mayuri Yadnesh Mukadam | Thane (M Corp.) | Thane |
| Mr. Suryakant Sitaram Thakur | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NIYATI LAKE CROWN WING A | Wing A | Rs 12.92 cr | Rs 6.68 cr |
| NIYATI LAKE CROWN WING B | Wing B | Rs 12.92 cr | - |
| NIYATI LAKE CROWN WING D | Wing D | Rs 5.40 cr | Rs 55.33 lakh |
| NIYATI LAKE CROWN WING C | Wing C | Rs 1.58 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RIGHT SPACE CONSULTANTS |
| Engineer | ASSOCIATED STRUCTURAL ENGINEERS LLP |
| Engineer | Ritesh v Rangani |
| Chartered Accountant | TODI TULSYAN & CO |
| Chartered Accountant | Manish Ranpariya |
| Partner | Role in project |
|---|---|
| SHREE SWAMI SAMARTH ENTERPRISES | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600403 | Bhakti Achrekar | SHREE SWAMI SAMARTH ENTERPRISES | 15/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Aug 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A_FY 25-26.pdf | 21 Aug 2026 |
| Form 5 (FY 2025-2026)File: Form 5 March 2026.pdf | 20 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026.pdf | 17 Aug 2026 |
| Withdrawal Update Form 2File: Form2 June 2026.pdf | 17 Aug 2026 |
| Withdrawal Update Form 3File: Form3 June 2026_compressed.pdf | 17 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 31 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026.pdf | 31 Jul 2026 |
| Withdrawal Update Form 3File: Form3 March 2026.pdf | 31 Jul 2026 |
| Layout approvalFile: highlighted sanctioned plan_approved 01st April 2026.pdf | 3 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2 A Shree swami Samartha.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: FOMR 1 dec signed.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 dec signed.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 Dec 2025_compressed.pdf | 9 Mar 2026 |
| Building plan approvalFile: TMC NEW_building plan.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 2025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Dec 2025_compressed.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: form 1 sept 2025.pdf | 8 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 sept 2025.pdf | 8 Dec 2025 |
| Withdrawal Update Form 3File: form3 sept 2025.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_June 2025.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: FORM 3_June 2025.pdf | 1 Dec 2025 |
| Form 5 (FY 2024-2025)File: form5 2024-25.pdf | 1 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY (1).pdf | 19 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_30_11_24.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Consolidated_1_7_24 to 30_11_24.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_1_7_24 to 30_11_24.pdf | 27 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_30_11_24.pdf | 27 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Consolidated_1_7_24 to 30_11_24.pdf | 27 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_1_7_24 to 30_11_24.pdf | 27 Dec 2024 |
| Building plan approvalFile: 2 Project Information (1).pdf | 25 Dec 2024 |
| Building plan approvalFile: 2 Project Information (1).pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Project Information (1).pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure abt Sold and booked inventory.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 Project Information (1).pdf | 25 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure abt Sold and booked inventory.pdf | 25 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC_till 7th floor.pdf | 18 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration about further CC.pdf | 18 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Updated CC_till 7th floor.pdf | 18 Dec 2024 |
| Declaration about Commencement CertificateFile: Declaration about further CC.pdf | 18 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: POA_2018.pdf | 12 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: POA_Manda tare_ for bupesh tare family_2023.pdf | 12 Nov 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: POA 2018 KASAR SWAMI SAMARTH.pdf | 12 Nov 2024 |
| Other - FinanceFile: POA_2018.pdf | 12 Nov 2024 |
| Other - FinanceFile: POA_Manda tare_ for bupesh tare family_2023.pdf | 12 Nov 2024 |
| Other - FinanceFile: POA 2018 KASAR SWAMI SAMARTH.pdf | 12 Nov 2024 |
| Other - LegalFile: Partnership Deed - 2024 - Kiran-1.pdf | 26 Oct 2024 |
| Other - LegalFile: Partnership Deed - 2024 - Kiran-2.pdf | 26 Oct 2024 |
| Other - LegalFile: Partnership Deed - 2024 Reshma_1.pdf | 26 Oct 2024 |
| Other - LegalFile: Partnership Deed - 2024 Reshma_2.pdf | 26 Oct 2024 |
| Other - LegalFile: Partnership Deed 2018.pdf | 26 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Self Declarationn abt opening 3 RERA account.pdf | 26 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Order no 45_Mail form TMC to MahaRERA authority for CC approval.pdf | 25 Oct 2024 |
| Other - FinanceFile: Declaration abt units allotted to land owner.pdf | 25 Oct 2024 |
| Other - TechnicalFile: Order no 50 One plot one regi.pdf | 22 Oct 2024 |
| Other - LegalFile: Declaration abt units allotted to land owner.pdf | 10 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration abt No Encumbrances finance and legal.pdf | 8 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Declaration abt No Encumbrances finance and legal.pdf | 8 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Authority signture_Kiran.pdf | 8 Oct 2024 |
| Building plan approvalFile: building layout_compressed.pdf | 12 Aug 2024 |
| Copy of the legal title reportFile: Title report_ New.pdf | 12 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: HIGHLIGHT BUILDING PLAN.pdf | 12 Aug 2024 |
| Proforma of Allotment letterFile: Allotmentletter- Final 17 10 2024.pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_Consolidated_as on registration date.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: building layout_compressed.pdf | 12 Aug 2024 |
| Deviation Report with respect to Allotment letterFile: NO DEVIATION_ALLOTMENT LETTER.pdf | 12 Aug 2024 |
| Deviation Report with respect to model copy of AgreementFile: NO DEVIATION_AFS.pdf | 12 Aug 2024 |
| Proforma of Agreement for saleFile: Agreement for sale_17 10 2024.pdf | 12 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf | 12 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: Declaration abt No Encumb and legal on project.pdf | 3 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and booked inventory.pdf | 3 Aug 2024 |
| CERSAI detailsFile: Declaration abt no cersai.pdf | 3 Aug 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| DESTINY ONEP51800034629 | BHANDUP WEST, Mumbai Suburban | 111 | Apr 2022 | Ongoing | Dec 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NIYATI LAKE CROWN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR 6 GHODBUNDER7,600+ in Thane
Filed coordinates, straight-line distance. 145 registered projects within 2 km.
Godrej Emerald Thane
Godrej Greenview Housing Private Limited
NORTH IMPERIAL GREENS -TOWER 2
Skylark Buildspace Private Limited
VIHANG MARINA
BALAJI ENTERPRISES
Puranik City Reserva Phase 1
Puranik Builders Limited
NORTH IMPERIAL GREENS - TOWER 1
Skylark Buildspace Private Limited
RAUNAK 108
UNNATHI ASSOCIATES
See every Thane project, with the district possession charts
Builder: SHREE SWAMI SAMARTH ENTERPRISES
SHREE SWAMI SAMARTH ENTERPRISES has 7 registrations on MahaRERA, including SHRI SWAMI SAMARTH MAULI and SWASTIK AANGAN. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if NIYATI LAKE CROWN is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIYATI LAKE CROWN?
The registered promoter entity is SHREE SWAMI SAMARTH ENTERPRISES, a partnership as per the filing. Its GSTIN 27ABSFS8959B3ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIYATI LAKE CROWN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NIYATI LAKE CROWN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NIYATI LAKE CROWN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIYATI LAKE CROWN?
The professionals named in the filing: Architect: RIGHT SPACE CONSULTANTS; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Engineer: Ritesh v Rangani; Chartered Accountant: TODI TULSYAN & CO; Chartered Accountant: Manish Ranpariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIYATI LAKE CROWN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.