Home / Browse projects / Pune, Maharashtra / Nirman Milestone

Completed No litigation declared Others project

Nirman Milestone

By NIRMAN VENTURE

RG-MH-12991 · RERA P52100022161 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
44 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Nirman Milestone is a Others project by NIRMAN VENTURE in Pune, Maharashtra, registered with MahaRERA as P52100022161 on 4 Sep 2019. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNirman Milestone
  • TypeOthers
  • Location
    • Katraj Dehu Road NH 4
    • Mukai Chowk
    • Kivale
    • Mawal
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022161
  • ReraGenie IDRG-MH-12991

Builder

  • NameNIRMAN VENTURE
  • Entity typePartnership
  • PartnersPRATIK SUNIL AGARWAL, SUNIL RAMESHWAR AGARWAL, AJINKYA KANTILAL KALOKHE, BALASAHEB TUKARAM TARAS

Key dates

this monthRegisteredSep 2019PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Sep 2019
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings5 building records
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA70000
BNA60000
CNA90000
DNA80000
COMMERCIALNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
COMMERCIAL73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed107

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots107
Closed/Covered97
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
A18624
B24024
C27027
D23427
COMMERCIAL505

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,717 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VANDANA RAVINDRA BALWADKARPune (M Corp.)Pune
SHIVAJI MARUTI SANDBHORKivalePune

Approvals and building plan

Permissible FSI5984.75
Proposed, not sanctioned3,306 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEMPIRE ESTATE, CHINCHWAD, PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr.Yogesh Manakshe
EngineerSUNIL KALORE
Chartered AccountantNAVDEEP JINDAL
PartnerRole in project
NIRMAN VENTURE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018758Dec 2023 → Jul 2024

Reason as filed by the promoterWORK IS COMPLETED WAITING FOR COMPLETION CERTIFICATE.

Litigation declared1

CaseCourtStatus
439/2021/2021PUNEPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600616Nirman Nirman MiletoneNIRMAN VENTURE02/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 May 2024

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Commercial Society Registration Certificate.pdf15 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Audit Report.pdf21 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A NIRMAN MILESTONE.pdf19 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A NIRMAN MILESTONE.pdf19 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Nirman Venture - Form 4.pdf8 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nirman Milestone Complition C D and Commercial.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 NIRMAN MILESTONE.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 NIRMAN MILESTONE.pdf26 Apr 2024
Certificates of CA (Form 3)File: FORM 3 NIRMAN MILESTONE.pdf26 Apr 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (2).pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold building wise final.pdf20 Jan 2024
CERSAI detailsFile: CERSAI declaration.pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Partners.pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seprate bank account.pdf20 Jan 2024
Declaration in FORM BFile: Revised Form B.pdf10 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf10 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2 A.pdf10 Jan 2024
Certificates of CA (Form 3)File: form 3 (4).pdf10 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Nirman Venture - Audit Report.pdf28 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 23-3-23 (1).pdf12 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Nirman Milestone Complition A B.pdf12 Jun 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE A B.pdf12 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: nirman venture Architect certificate 23-3-23 (1).pdf7 Jun 2023
Certificates of CA (Form 3)File: CA CERTIFICATE nirman venture.pdf4 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM-5 -nirman venture.pdf3 Feb 2023
Certificates of CA (Form 3)File: Nirman Venture Form 3 Signed (1).pdf4 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Report NIrman Venture_compressed.pdf26 Mar 2022
Layout approvalFile: Layout compressed.pdf22 Jan 2022
Building plan approvalFile: A compressed.pdf22 Jan 2022
Building plan approvalFile: A Build Odd compressed.pdf22 Jan 2022
Building plan approvalFile: B compressed.pdf22 Jan 2022
Building plan approvalFile: B Buld Odd compressed.pdf22 Jan 2022
Building plan approvalFile: C Building_compressed.pdf22 Jan 2022
Building plan approvalFile: D Building_compressed.pdf22 Jan 2022
Building plan approvalFile: basement compressed.pdf22 Jan 2022
Building plan approvalFile: Comm N Club House.pdf22 Jan 2022
Building plan approvalFile: section elevation.pdf22 Jan 2022
Copy of Layout Approval (in case of layout)File: Layout compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: A compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: A Build Odd compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: B compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: B Buld Odd compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: C Building_compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: D Building_compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: basement compressed.pdf22 Jan 2022
Building Plan Approval (IOD)File: Comm N Club House.pdf22 Jan 2022
Building Plan Approval (IOD)File: section elevation.pdf22 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MS NIRMAN VENTURE.pdf16 Mar 2021
Proforma of Allotment letterFile: DRAFT OF MILESTONE.pdf27 Jan 2020
Proforma of Allotment letterFile: DRAFT OF MILESTONE.pdf27 Jan 2020
Proforma of Allotment letterFile: DRAFT OF MILESTONE Revised.pdf13 Jan 2020
Proforma of Allotment letterFile: DRAFT OF MILESTONE.pdf12 Dec 2019
Certificates of CA (Form 3)File: C A Form 3 venture_compressed (1).pdf27 Jul 2019
Proforma of Allotment letterFile: allotment Letter.pdf27 Jul 2019
Copy of the legal title reportFile: Nirman Venture Title and Search Report.pdf26 Jul 2019
Declaration in FORM BFile: FORM B SCAN.pdf26 Jul 2019
Layout approvalFile: 1-converted-compressed.pdf24 Jul 2019
Layout approvalFile: 2-converted-compressed.pdf24 Jul 2019
Layout approvalFile: 3-converted-compressed.pdf24 Jul 2019
Layout approvalFile: 4-converted-compressed.pdf24 Jul 2019
Layout approvalFile: 5-converted-compressed.pdf24 Jul 2019
Layout approvalFile: 6-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 1-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 2-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 3-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 4-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 5-converted-compressed.pdf24 Jul 2019
Building plan approvalFile: 6-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 1-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 2-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 3-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 4-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 5-converted-compressed.pdf24 Jul 2019
Copy of Layout Approval (in case of layout)File: 6-converted-compressed.pdf24 Jul 2019
Building Plan Approval (IOD)File: 1-converted-compressed.pdf24 Jul 2019
Building Plan Approval (IOD)File: 2-converted-compressed.pdf24 Jul 2019
Building Plan Approval (IOD)File: 3-converted-compressed.pdf24 Jul 2019
Building Plan Approval (IOD)File: 4-converted-compressed.pdf24 Jul 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nirman Milestone on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mukai Chowk13,700+ in Pune

2 kmNirman MilestoneCompleted 96Lapsed / revoked 53Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 271 registered projects within 2 km.

Builder: NIRMAN VENTURE

NIRMAN VENTURE has 1 registration on MahaRERA, including Nirman Milestone. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nirman Milestone is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nirman Milestone?

The registered promoter entity is NIRMAN VENTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nirman Milestone?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nirman Milestone?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nirman Milestone?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nirman Milestone?

The professionals named in the filing: Architect: Ar.Yogesh Manakshe; Engineer: SUNIL KALORE; Chartered Accountant: NAVDEEP JINDAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nirman Milestone?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nirman Milestone. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nirman Milestone to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.