NIMBUS BUSINESS CENTRE
RG-MH-13655 · RERA P51600034581 · Last updated on MahaRERA portal: 27 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 20 months past the filed date
- Completion date moved by 13 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIMBUS BUSINESS CENTRE is a Commercial project by S P M DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600034581 on 11 Apr 2022. Possession was promised by 6 Feb 2025 and is now 20 months past that date. The completion date has moved by 13 months from the original filing. 0 of the 28 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameNIMBUS BUSINESS CENTRE
- TypeCommercial
- Location
- NASHIK SHIWAR
- NASHIK
- Nashik (M Corp.)
- 422010
- Pincode422010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600034581
- ReraGenie IDRG-MH-13655
Builder
- NameS P M DEVELOPERS
- Entity typePartnership
- PartnersTUSHAR SUDHAKAR MALPURE, NIRANJAN SANJAY PATKAR, PRASHANT ASHOK SONJE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Apr 2022
- Promised completion6 Feb 2025
- Revised completionRevised to 6 Feb 2025 (originally 31 Jan 2024)
- Buildings1 building record
- Documents filed69 files
Current status
Figures as on 27 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIMBUS BUSINESS CENTRE | NA | 10 | 7 | 0 | 28 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.
NIMBUS BUSINESS CENTRE: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 27 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NIMBUS INFRASTRUCTURES | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NITIN KUTE |
| Engineer | B B MAHAJAN |
| Engineer | Prasad Sonaje |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | R S P H & Associates |
| Chartered Accountant | PN Sabadra & Associates |
| Partner | Role in project |
|---|---|
| S P M DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. We have completed the said project and obtained full occupancy certificate from Nashik Municipal Corporation, Nashik dated 06.02.2025. The copy of the same is attached herewith. 2. Since the project completion date on RERA portal is 31.01.2024, we are applying for post facto extension of project completion date i.e., the date of full occupancy certificate.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: 2-Architect Certificate-Dec-24.pdf | 27 Sep 2025 |
| Form 2File: 2-Engineer Certificate-Dec-24.pdf | 27 Sep 2025 |
| Form 3File: 2-CA Cert_SPM_Dec-24 final.pdf | 27 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure as on 31 Dec-24.pdf | 27 Sep 2025 |
| Form 1File: Architect Certificate-06 Feb 2025.pdf | 25 Sep 2025 |
| Form 2File: Engineer Certificate-06 Feb 2025.pdf | 25 Sep 2025 |
| Form 3File: CA Certificate.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 25.pdf | 25 Sep 2025 |
| Form 1File: 1-Architect Certificate-Sept-24.pdf | 25 Sep 2025 |
| Form 2File: 1-Engineer Certificate-Sept-24.pdf | 25 Sep 2025 |
| Form 3File: CA certificate Sept 24 final.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory-Nimbus Business Centre.pdf | 25 Sep 2025 |
| Form 1File: Architect Jun 24.pdf | 25 Sep 2025 |
| Form 2File: Engineers June 24.pdf | 25 Sep 2025 |
| Form 3File: CA Certificate June 24 final.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure June 24.pdf | 25 Sep 2025 |
| Form 1File: Architect March 24.pdf | 25 Sep 2025 |
| Form 2File: Engineer March 24.pdf | 25 Sep 2025 |
| Form 3File: CA Certificate March 24 final.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold books.pdf | 25 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure-Dec 2023.pdf | 14 Sep 2025 |
| Form 1File: Architect Certificate Dec 23.pdf | 14 Sep 2025 |
| Form 2File: Engineer Certificate Dec- 23.pdf | 14 Sep 2025 |
| Form 3File: CA Certificate-Form 3-Dec-23.pdf | 14 Sep 2025 |
| Form 3File: CA Certificate June-23.pdf | 14 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of units-June 2023.pdf | 14 Sep 2025 |
| Form 1File: Form-1-June 2023.pdf | 14 Sep 2025 |
| Form 2File: Form 2-June 2023.pdf | 14 Sep 2025 |
| Form 5 (FY 2023-2024)File: Form 5-F Y 23-24.pdf | 14 Sep 2025 |
| Form 5 (FY 2022-2023)File: Form 5-F Y 22-23.pdf | 14 Sep 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report Final.pdf | 21 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure June.pdf | 22 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report FY 22-23 Final.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect March 24 Signed copy (2).pdf | 9 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Jun 24.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24 final.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 24 final.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer March 24.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers June 24.pdf | 9 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Certificate.pdf | 17 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold books.pdf | 17 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Declaration of sold books.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 23.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec- 23.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Form 3-Dec-23.pdf | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 07-09-2023.pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 07-09-2023.pdf | 8 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPM Developers.pdf | 8 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Nimbus Business Centre.pdf | 14 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 24 May 2023.pdf | 31 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Nimbus.pdf | 31 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SPM CA Certificate Mar 23.pdf | 31 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory-Nimbus Business Centre.pdf | 30 May 2023 |
| Other - TechnicalFile: Quality Assurance Certificate Form 2A- Nimbus Business Centre.pdf | 30 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosre of Sold-booked.pdf | 13 Jan 2023 |
| Layout approvalFile: Building Plan.pdf | 5 Apr 2022 |
| Building plan approvalFile: Building Plan.pdf | 5 Apr 2022 |
| Copy of Layout Approval (in case of layout)File: Building Plan.pdf | 5 Apr 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 5 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 30 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate (1).pdf | 28 Mar 2022 |
| Declaration about Commencement CertificateFile: Form D.pdf | 28 Mar 2022 |
| Declaration in FORM BFile: Form_B_Developer New.pdf | 28 Mar 2022 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 28 Mar 2022 |
| Copy of the legal title reportFile: Titile Report New Compress.pdf | 24 Mar 2022 |
| Details of encumbrancesFile: EC.pdf | 4 Dec 2021 |
| CERSAI detailsFile: CERSAI Report.pdf | 4 Dec 2021 |
| Proforma of Allotment letterFile: Agreement Draft.pdf | 4 Dec 2021 |
| PAN CardFile: Firm PAN.pdf | 2 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep NIMBUS BUSINESS CENTRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
Filed coordinates, straight-line distance. 140 registered projects within 2 km.
SHREE SATYANARAYAN ROONGTA FORUM
ROONGTA HOMES LLP
LIFE 360
VELOCITY INFRA PROJECTS
ARYAN'S LIFEONE
SHREE ARYAN BUILDERS AND DEVELOPERS
SUNFLOWER CITY
DEEPAK KALYANJI CHANDE
Laxminarayan Heaven
Sahajanand Builders And Developers
SWASTIK MANGAL APARTMENT
SHREEMANGAL CONSTRUCTION
See every Nashik project, with the district possession charts
Builder: S P M DEVELOPERS
S P M DEVELOPERS has 1 registration on MahaRERA, including NIMBUS BUSINESS CENTRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What does it mean that NIMBUS BUSINESS CENTRE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NIMBUS BUSINESS CENTRE is delayed beyond 6 Feb 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIMBUS BUSINESS CENTRE?
The registered promoter entity is S P M DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIMBUS BUSINESS CENTRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for NIMBUS BUSINESS CENTRE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIMBUS BUSINESS CENTRE?
The professionals named in the filing: Architect: NITIN KUTE; Engineer: B B MAHAJAN; Engineer: Prasad Sonaje; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: R S P H & Associates; Chartered Accountant: PN Sabadra & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIMBUS BUSINESS CENTRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback