ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / NIMBARK RESIDENCY

Registered No litigation declared Residential / Group Housing project

NIMBARK RESIDENCY

By KAILASH DEVELOPERS

RG-MH-89680 · RERA P52100080983 · Last updated on MahaRERA portal: 13 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

NIMBARK RESIDENCY is a Residential / Group Housing project by KAILASH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100080983 on 24 Sep 2025. Possession is promised by 7 May 2028.

At a glance

Project

  • NameNIMBARK RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Sr.. No 77/4
    • At Ravet Tal. Haveli Dist pune 412101
    • Ravet
    • Haveli
    • Pune
    • 412101
  • Pincode412101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100080983
  • ReraGenie IDRG-MH-89680

Builder

  • NameKAILASH DEVELOPERS
  • Entity typePartnership
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredSep 2025PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2025
  • Promised completion7 May 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIMBARK RESIDENCYNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

NIMBARK RESIDENCY: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,392 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2254.24
Proposed, not sanctioned2,254 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaratha Chambers GR Floor Sector-25 SDC3 Street Bhel Chowk Rd, Near Grahak Bhandar Pune 411 044

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSonam Raut
EngineerSUJAY AHER
EngineerGanesh Bhalerao
Chartered AccountantSanawadwala and associates CA Huzaifa S Sanawadwala
PartnerRole in project
KAILASH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 7 May 2028

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nimbark Form 3 New.pdf13 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nimbark Form 3 New.pdf13 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nimbark Form 3 New.pdf13 Sep 2025
CERSAI detailsFile: CERSAI Declaration Nimbark Residency.pdf10 Sep 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead Nimbark Residency.pdf10 Sep 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Document 15 (1).pdf10 Sep 2025
CERSAI detailsFile: CERSAI Declaration Nimbark Residency.pdf10 Sep 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead Nimbark Residency.pdf10 Sep 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Document 15 (1).pdf10 Sep 2025
CERSAI detailsFile: CERSAI Declaration Nimbark Residency.pdf10 Sep 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Promoter Letterhead Nimbark Residency.pdf10 Sep 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Document 15 (1).pdf10 Sep 2025
Other - LegalFile: Nimbark 712.pdf3 Sep 2025
Other - LegalFile: Nimbark 712.pdf3 Sep 2025
Other - LegalFile: Nimbark 712.pdf3 Sep 2025
Other - LegalFile: Ketan 3.pdf29 Aug 2025
Other - LegalFile: Ketan 2.pdf29 Aug 2025
Other - LegalFile: Ketan 1.pdf29 Aug 2025
Other - TechnicalFile: FORM-3 Kailash Developers (1).pdf29 Aug 2025
Other - LegalFile: Ketan 3.pdf29 Aug 2025
Other - LegalFile: Ketan 2.pdf29 Aug 2025
Other - LegalFile: Ketan 1.pdf29 Aug 2025
Other - TechnicalFile: FORM-3 Kailash Developers (1).pdf29 Aug 2025
Other - LegalFile: Ketan 3.pdf29 Aug 2025
Other - LegalFile: Ketan 2.pdf29 Aug 2025
Other - LegalFile: Ketan 1.pdf29 Aug 2025
Other - TechnicalFile: FORM-3 Kailash Developers (1).pdf29 Aug 2025
Other - LegalFile: AOP Deed New (3).pdf28 Aug 2025
Other - LegalFile: AOP Deed New (3).pdf28 Aug 2025
Other - LegalFile: AOP Deed New (3).pdf28 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (71)_organized.pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Sharma Ravet 77 Appendix F (1).pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Email verification.pdf21 Aug 2025
Other - LegalFile: affidavit (1).pdf21 Aug 2025
Declaration about Commencement CertificateFile: DCC Nimbark.pdf21 Aug 2025
Other - TechnicalFile: affidavit (1).pdf21 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (71)_organized.pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Sharma Ravet 77 Appendix F (1).pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Email verification.pdf21 Aug 2025
Other - LegalFile: affidavit (1).pdf21 Aug 2025
Declaration about Commencement CertificateFile: DCC Nimbark.pdf21 Aug 2025
Other - TechnicalFile: affidavit (1).pdf21 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (71)_organized.pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Sharma Ravet 77 Appendix F (1).pdf21 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: Email verification.pdf21 Aug 2025
Other - LegalFile: affidavit (1).pdf21 Aug 2025
Declaration about Commencement CertificateFile: DCC Nimbark.pdf21 Aug 2025
Other - TechnicalFile: affidavit (1).pdf21 Aug 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Real Estate Organizations Nimbark.pdf19 Aug 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Real Estate Organizations Nimbark.pdf19 Aug 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in Other Real Estate Organizations Nimbark.pdf19 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kailas Developers - Form No1 07072025.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kailas Developers - Form No1 07072025.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kailas Developers - Form No1 07072025.pdf8 Jul 2025
Copy of the legal title reportFile: Kailas Developers - Search Report - 07072025_compressed.pdf7 Jul 2025
Copy of the legal title reportFile: Kailas Developers - Search Report - 07072025_compressed.pdf7 Jul 2025
Copy of the legal title reportFile: Kailas Developers - Search Report - 07072025_compressed.pdf7 Jul 2025
Deviation Report with respect to Allotment letterFile: Kailash Developers - Deviation ALLOT.pdf26 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Kailash Developers - Deviation Agree.pdf26 Jun 2025
Deviation Report with respect to Allotment letterFile: Kailash Developers - Deviation ALLOT.pdf26 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Kailash Developers - Deviation Agree.pdf26 Jun 2025
Deviation Report with respect to Allotment letterFile: Kailash Developers - Deviation ALLOT.pdf26 Jun 2025
Deviation Report with respect to model copy of AgreementFile: Kailash Developers - Deviation Agree.pdf26 Jun 2025
Proforma of Allotment letterFile: Kailash Developers - Alloment Letter.pdf24 Jun 2025
Declaration in FORM BFile: Kailas Developers - Form B New.pdf24 Jun 2025
Proforma of Agreement for saleFile: Kailash Developers - Agreement to Sale.pdf24 Jun 2025
Proforma of Allotment letterFile: Kailash Developers - Alloment Letter.pdf24 Jun 2025
Declaration in FORM BFile: Kailas Developers - Form B New.pdf24 Jun 2025
Proforma of Agreement for saleFile: Kailash Developers - Agreement to Sale.pdf24 Jun 2025
Proforma of Allotment letterFile: Kailash Developers - Alloment Letter.pdf24 Jun 2025
Declaration in FORM BFile: Kailas Developers - Form B New.pdf24 Jun 2025
Proforma of Agreement for saleFile: Kailash Developers - Agreement to Sale.pdf24 Jun 2025
Other - TechnicalFile: Email - CC.pdf5 Jun 2025
Other - TechnicalFile: Email - CC.pdf5 Jun 2025
Other - TechnicalFile: Email - CC.pdf5 Jun 2025
Details of encumbrances concerned to FinanceFile: Kailas Developers - Self Decleration Encumbrances date.pdf31 May 2025
Details of encumbrances concerned to LegalFile: Kailas Developers - Self Decleration Encumbrances date.pdf31 May 2025
Details of encumbrances concerned to FinanceFile: Kailas Developers - Self Decleration Encumbrances date.pdf31 May 2025
Details of encumbrances concerned to LegalFile: Kailas Developers - Self Decleration Encumbrances date.pdf31 May 2025
Details of encumbrances concerned to FinanceFile: Kailas Developers - Self Decleration Encumbrances date.pdf31 May 2025

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIMBARK RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravet13,700+ in Pune

2 kmNIMBARK RESIDENCYCompleted 106Lapsed / revoked 57Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 278 registered projects within 2 km.

Builder: KAILASH DEVELOPERS

KAILASH DEVELOPERS has 4 registrations on MahaRERA, including KAILASH HEIGHTS and KAILASH TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if NIMBARK RESIDENCY is delayed beyond 7 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIMBARK RESIDENCY?

The registered promoter entity is KAILASH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIMBARK RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIMBARK RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIMBARK RESIDENCY?

The professionals named in the filing: Architect: Sonam Raut; Engineer: SUJAY AHER; Engineer: Ganesh Bhalerao; Chartered Accountant: Sanawadwala and associates CA Huzaifa S Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIMBARK RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIMBARK RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIMBARK RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.