Home / Browse projects / Nashik, Maharashtra / New Pawanputra Business Point

Registered No litigation declared Others project

New Pawanputra Business Point

By New Shree Riddhi Siddhi Developers

RG-MH-70569 · RERA P51600051583 · Last updated on MahaRERA portal: 8 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 85%
78 of 115Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

New Pawanputra Business Point is a Others project by New Shree Riddhi Siddhi Developers in Nashik, Maharashtra, registered with MahaRERA as P51600051583 on 27 Jun 2023. Possession is promised by 26 Dec 2026. 37 of the 115 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameNew Pawanputra Business Point
  • TypeOthers
  • Location
    • Pathardi Phata
    • Pathardi Phata Nashik
    • Nashik (M Corp.)
    • Nashik
    • 422010
  • Pincode422010
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051583
  • ReraGenie IDRG-MH-70569

Builder

  • NameNew Shree Riddhi Siddhi Developers
  • Entity typePartnership
  • PartnersRakesh Chandrakant Amrutkar, Vishal Subhash Pawar, Kiran Ramdas Yeole, Sonal Rakesh Amrutkar, Rakesh Gajanan Chinchole, Rajendra Shridhar Amrutkar, Bhushan Subhash Pawar, Subhash Bandu Pawar

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion26 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Current status

32%37 of 115 units booked
61.5%Work done, per cost certificate

Figures as on 8 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
New Pawanputra Business Point A WingNA7645357
New Pawanputra Business Point Wing BNA7645458

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 85%.

New Pawanputra Business Point A Wing49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
New Pawanputra Business Point Wing B58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed176

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots176
Open Space176

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,236 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2026

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI4995.37
Proposed, not sanctioned4,995 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 12 To 22, Prosper Park, Shingada Talav, Nasik-Pune Road, Near Fire Brigade Office, Nasik - 422001
Estimated costRs 15.70 cr
Cost incurredRs 9.66 cr
Work done61.54%
BuildingWingEstimatedIncurred
New Pawanputra Business Point A WingNARs 7.85 crRs 4.83 cr
New Pawanputra Business Point Wing BNARs 7.85 crRs 4.83 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR CM Sati sh Gaikwad
ArchitectYogesh Gaikwad
EngineerJaysh Makwana
Chartered AccountantCA Vikas K. Hase
PartnerRole in project
New Shree Riddhi Siddhi Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 26 Dec 2026

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_compressed.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1_compressed.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1_compressed.pdf8 Jun 2026
Withdrawal Update Form 1File: Form 1_compressed.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf8 Jun 2026
Withdrawal Update Form 2File: Form 2_compressed.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3_smallpdf.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3_smallpdf.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3_smallpdf.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3_smallpdf.pdf8 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR sept 23.pdf14 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA sept 23.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CA sept 23.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER sept 23.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR - June 24.pdf6 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR - Sep 24.pdf6 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - June 24.pdf6 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Sep 24.pdf6 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER - June 24.pdf6 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER - Sep 24.pdf6 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Sep 23.pdf6 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Dis 23.pdf6 Jun 2025
Building plan approvalFile: plan 1 rotated.pdf3 May 2025
Building plan approvalFile: plan 2 rotated.pdf3 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: plan 1 rotated.pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: plan 2 rotated.pdf3 May 2025
Declaration about Commencement CertificateFile: format D.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR cert.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA NEW SHREE RIDDHI SIDDHI DEVLOPERS.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure (1).pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 05.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec24-min.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTICATE1-min.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (2)-min.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: A-B SOLD INVENTORY-min.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTICATE_compressed.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTICATE (1)_compressed (1).pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE (2) (1)_compressed (1).pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: A-WING NEW SHREE RIDDHI SIDDHI DEVLOPERS (3).pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: B-WING NEW SHREE RIDDHI SIDDHI DEVLOPERS (2)_compressed.pdf17 Feb 2025
Disclosure of sold/ booked inventoryFile: A-WING NEW SHREE RIDDHI SIDDHI DEVLOPERS_compressed (1).pdf20 Nov 2024
Disclosure of sold/ booked inventoryFile: A-WING NEW SHREE RIDDHI SIDDHI DEVLOPERS_compressed (1).pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - Riddhi Siddhi Dev.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE - Riddhi Siddhi Dev.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Riddhi Siddhi Dev.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - Riddhi Siddhi Dev.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Jun 23.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFCATE FORM 02_Jun 23.pdf27 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA ACCOUNTS CERTIFCATE_Jun 23.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC NEW SHREE RIDDHI SIDHI DEVLOPERS_compressed.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC NEW SHREE RIDDHI SIDDHI DEVLOPERS_compressed.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA NEW SHREE RIDDHI SIDDHI DEVLOPERS_compressed.pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (1).pdf22 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-1.pdf22 Dec 2023
Proforma of Agreement for saleFile: Draft, Rera Document, Shop,Office (1).pdf17 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf13 Jun 2023
Declaration about Commencement CertificateFile: Form-D.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf9 Jun 2023
Layout approvalFile: LAYOUT scan 319.pdf30 May 2023
Building plan approvalFile: SANCTION PLAN SHEET NO 1 2 319_rotated.pdf30 May 2023
Building plan approvalFile: SANCTION PLAN SHEET NO 2 2 319_rotated.pdf30 May 2023
PAN CardFile: pan card.pdf30 May 2023
Copy of the legal title reportFile: Title Report_1 (3 files merged).pdf30 May 2023
Details of encumbrances concerned to FinanceFile: No encmbrances concerned to Finance New Shree Riddhi Siddhi Developrs[1].pdf30 May 2023
Details of encumbrances concerned to FinanceFile: No encmbrances concerned to Legal new shree Riddhi Siddhi Developrs[1].pdf30 May 2023
Details of encumbrances concerned to LegalFile: No encmbrances concerned to Finance New Shree Riddhi Siddhi Developrs[1].pdf30 May 2023
Details of encumbrances concerned to LegalFile: No encmbrances concerned to Legal new shree Riddhi Siddhi Developrs[1].pdf30 May 2023
Copy of Layout Approval (in case of layout)File: LAYOUT scan 319.pdf30 May 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN SHEET NO 1 2 319_rotated.pdf30 May 2023
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN SHEET NO 2 2 319_rotated.pdf30 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 May 2023

How this compares with Nashik

32%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep New Pawanputra Business Point on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pathardi Phata Nashik4,100+ in Nashik

2 kmNew Pawanputra Business Completed 97Lapsed / revoked 17Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: New Shree Riddhi Siddhi Developers

New Shree Riddhi Siddhi Developers has 1 registration on MahaRERA, including New Pawanputra Business Point. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if New Pawanputra Business Point is delayed beyond 26 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of New Pawanputra Business Point?

The registered promoter entity is New Shree Riddhi Siddhi Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in New Pawanputra Business Point?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for New Pawanputra Business Point?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at New Pawanputra Business Point?

The professionals named in the filing: Architect: AR CM Sati sh Gaikwad; Architect: Yogesh Gaikwad; Engineer: Jaysh Makwana; Chartered Accountant: CA Vikas K. Hase. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in New Pawanputra Business Point?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About New Pawanputra Business Point. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save New Pawanputra Business Point to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.