Netra Aarambh - Building No 6

By One Palace Infrastructure

RG-MH-17559 · RERA P99000055638 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 95%
22 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Netra Aarambh - Building No 6 is a Others project by One Palace Infrastructure in Palghar, Maharashtra, registered with MahaRERA as P99000055638 on 5 Apr 2024. Possession is promised by 31 Dec 2026. 31 of the 53 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNetra Aarambh - Building No 6
  • TypeOthers
  • Location
    • Navali
    • Navali
    • Palghar
    • Palghar
    • 401404
  • Pincode401404
  • RERA no.P99000055638
  • ReraGenie IDRG-MH-17559

Builder

  • NameOne Palace Infrastructure
  • Entity typePartnership
  • PartnersPooja Shakti Singh, Vishal Satyendra Singh

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

58%31 of 53 units booked
48.0%Work done, per cost certificate

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Netra Aarambh - Building No 6NA77421153

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Netra Aarambh - Building No 6: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Open Space86

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,105 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
Netra Alture, Shankar Shetty, Rajesh NaikVasai-Virar City (M Corp)Palghar
Vishwas Kamlakar GharatVasai-Virar City (M Corp)Palghar
Sujata Kamlakar GharatVasai-Virar City (M Corp)Palghar
Nandan Sunil GharatVasai-Virar City (M Corp)Palghar
Kaushik Sunil GharatVasai-Virar City (M Corp)Palghar
Brijesh Sunil GharatVasai-Virar City (M Corp)Palghar
Sangita Sunil GharatVasai-Virar City (M Corp)Palghar
Mahendra Parshuram GharatVasai-Virar City (M Corp)Palghar
Laxman Ganpat GharatVasai-Virar City (M Corp)Palghar
Shaila Sudam GharatVasai-Virar City (M Corp)Palghar
Pankaj Sudam GharatVasai-Virar City (M Corp)Palghar
Mamta Sunil GharatVasai-Virar City (M Corp)Palghar
Pranay Sudam GharatVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityPalghar Municipal Council
Permissible FSI2414.5
Proposed, not sanctioned2,414 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, OLD UMA VILLA, MAHIM ROAD, PALGHAR DIST THANE 401404
Estimated costRs 5.10 cr
Cost incurredRs 2.45 cr
Work done48.04%
BuildingWingEstimatedIncurred
Netra Aarambh - Building No 6NARs 4.90 crRs 2.45 cr
-NARs 20.00 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddhivinayak Associates
EngineerAwhad Consulting Engineers
EngineerVinit Sawant
Chartered AccountantSwapnesh & Vinit Chartered Accountants
Chartered AccountantHetal Gada & Associates
PartnerRole in project
One Palace Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 1_Form 1_Architect Certificate Q4 FY 2025-26.pdf3 Jun 2026
Withdrawal Update Form 2File: 2_Form 2_Engineer Certificate Q4 FY 2025-26.pdf3 Jun 2026
Withdrawal Update Form 3File: 3_Form 3 Q4 FY 2025-26_Signed 1.pdf3 Jun 2026
Withdrawal Update Form 1File: Architecte Certificat Q3-25.pdf6 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Q3-25.pdf6 Mar 2026
Withdrawal Update Form 3File: Form 3 Q3 FY-2025-26_compressed.pdf6 Mar 2026
Withdrawal Update Form 1File: Architecte Certificat Q2-25.pdf25 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Q2-25.pdf25 Feb 2026
Withdrawal Update Form 3File: 03 Form 3 Q2 FY 2025-26 SG (Netra Aarambh) Compressed.pdf25 Feb 2026
Withdrawal Update Form 1File: Architecte Certificat Q2-25.pdf13 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate Q2-25.pdf13 Dec 2025
Withdrawal Update Form 3File: 03 Form 3 Q2 FY 2025-26 SG (Netra Aarambh) Compressed.pdf13 Dec 2025
Form 2A (FY 2024-2025)File: 05- Form 2A - Quality Assurance Certificate .pdf20 Nov 2025
Withdrawal Update Form 1File: 1_ Form-1 Architect Certificate Q1.pdf14 Oct 2025
Withdrawal Update Form 2File: 2_ Form-2 Engineer Certificate Q1 -25-26.pdf14 Oct 2025
Withdrawal Update Form 3File: 3_Form-3 CA Certificate Q1.pdf14 Oct 2025
Form 5 (FY 2024-2025)File: 1_Form 5 FY-24-25.pdf27 Sep 2025
Form 1File: Architecte Certificat Q4.pdf31 Jul 2025
Form 2File: Engineer Certificate Q4 Comp.pdf31 Jul 2025
Form 3File: Form 3 Q4 Comp.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1- Q3 - 31-12-2024.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 - Q3 - 31-12-2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 -Q3 - 31-12-2024.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: 4_Disclosure of Sold - 31-12-2024.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Architect Certificate.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1- Q2 - 30 Oct 2024.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3 - Q2 - 21 Dec 2024 - Signed.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form 3-Q2-21-Dec-2024-signed.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Engineers Certificate - Q2 - 30-Jun-2024.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2- Q2 - 20-Dec-2024.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: 4_Disclosure of sold-Q1-30-June-2024.pdf21 Dec 2024
Disclosure of sold/ booked inventoryFile: 4_Disclosure of sold-Q2-30-Sep-2024.pdf21 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: 4_Disclosure of sold-Q1-30-June-2024.pdf21 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Cum Undertaking - Revised.pdf28 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Déclaration about separate bank account .pdf6 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Cum Undertaking .pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final - Signed.pdf4 Apr 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf20 Mar 2024
Other - LegalFile: Declaration about cc.pdf20 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report of AFS.pdf18 Mar 2024
Layout approvalFile: Sac plan - Netra Aarambh- Highlighted.pdf29 Feb 2024
Copy of Layout Approval (in case of layout)File: Sac plan - Netra Aarambh- Highlighted.pdf29 Feb 2024
Other - TechnicalFile: One Plot Declaration.pdf29 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal and Finance - Signed.pdf28 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Legal and Finance - Signed.pdf28 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account - signed.pdf28 Feb 2024
Other - TechnicalFile: Declaration of Plot Area.pdf28 Feb 2024
Other - TechnicalFile: Declaration .pdf23 Feb 2024
Proforma of Allotment letterFile: Allotment Letter .pdf16 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report .pdf16 Feb 2024
Other - LegalFile: Partnership Deed - One Palace Infrastructure.pdf15 Feb 2024
Other - LegalFile: Declaration Cum Undertaking.pdf14 Feb 2024
Other - TechnicalFile: 11zon_JPEG-to-PDF.pdf14 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrances - Finance and Legal.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrances - Finance and Legal.pdf3 Feb 2024
Declaration about Commencement CertificateFile: Declaration about cc.pdf3 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report-rectified.pdf3 Feb 2024
Copy of the legal title reportFile: Legal Title report.pdf23 Jan 2024
Building plan approvalFile: Sac plan - Netra Aarambh.pdf22 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Sac plan - Netra Aarambh.pdf22 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf22 Jan 2024
PAN CardFile: PAN card one palace.pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - NETRA ALTURE.pdf20 Jan 2024
Declaration in FORM BFile: Form B Promoter.pdf20 Jan 2024

How this compares with Palghar

58%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Netra Aarambh - Building No 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Navali, Palghar3,200+ in Palghar

Builder: One Palace Infrastructure

One Palace Infrastructure has 1 registration on MahaRERA, including Netra Aarambh - Building No 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Netra Aarambh - Building No 6 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Netra Aarambh - Building No 6?

The registered promoter entity is One Palace Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Netra Aarambh - Building No 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Netra Aarambh - Building No 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Netra Aarambh - Building No 6?

The professionals named in the filing: Architect: Siddhivinayak Associates; Engineer: Awhad Consulting Engineers; Engineer: Vinit Sawant; Chartered Accountant: Swapnesh & Vinit Chartered Accountants; Chartered Accountant: Hetal Gada & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Netra Aarambh - Building No 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Netra Aarambh - Building No 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Netra Aarambh - Building No 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.