Home / Browse projects / Mumbai Suburban, Maharashtra / Neelyog Virat -A Wing

Completed No litigation declared Others project

Neelyog Virat -A Wing

By Neelyog Construction Pvt Ltd

RG-MH-20448 · RERA P51800004052 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Neelyog Virat -A Wing is a Others project by Neelyog Construction Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004052 on 7 Aug 2017. The registration is recorded completed; possession was promised by 29 Dec 2026. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNeelyog Virat -A Wing
  • TypeOthers
  • Location
    • Khotkuwa Road
    • Dhanjiwadi
    • Borivali
    • Mumbai Suburban
    • 400097
  • Pincode400097
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004052
  • ReraGenie IDRG-MH-20448

Builder

  • NameNeelyog Construction Pvt Ltd
  • Entity typeCompany
  • CINU45200MH1993PTC073168
  • GSTIN27AAACN1792R1ZT
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonYogesh Babulal Mehta
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017First promiseDec 2026Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2017
  • Promised completion29 Dec 2026
  • Revised completionRevised to 29 Dec 2026 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Neelyog Virat - A WingNA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Neelyog Virat - A Wing: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes25%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes72%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed98

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots98
Closed/Covered95
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area663 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10814.12
Proposed, not sanctioned6,489 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNRI Andheri East Branch Ground Floor Shop No 3 Hubtown Solaris N S Phadke Marg Near East West F

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTandel & Associates
EngineerK O Davasia
Chartered AccountantSonal V Desai
Chartered AccountantLalit Mehta & Co
PartnerRole in project
Neelyog Construction Pvt Ltd-

Litigation declared2

CaseCourtStatus
912/2014City Civil Court of Mumbai DindoshiSuit filed by Alleged Imla Malik and no interim relief granted and Notice of Motion pending for Hea
3064/2015City Civil Court of Mumbai DindoshiSuit filed by Alleged Imla Malik and no interim relief granted and pending for Report

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000012477SUMAN DHANJIWADI CHOTALIANEELYOG CONSTRUCTION PVT LTD21/12/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Jul 2022

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 -Architect Certificate Virat A -New Format with Full OC.pdf12 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 CA Certificate-Annual.pdf23 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 -Engineers Certificate.pdf7 Jul 2022
Form 2AFile: Form 2A -Engineers Certi for Quality.pdf7 Jul 2022
Certificates of CA (Form 3)File: Form 3 - C A Certificate.pdf7 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER.pdf4 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Neelyog Virat Wing A 30 09 2021.pdf18 Oct 2021
Form 2AFile: Form 2A Engineers Certificate Neelyog Virat Wing A 30 09 2021.pdf18 Oct 2021
Certificates of CA (Form 3)File: Form 3 CA Certificate Neelyog Virat Wing A 30 09 2021.pdf18 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 CA Certificate Neelyog Virat A Wing.pdf29 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Neelyog VIrat- Wing A CC 07 09 21.pdf22 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE- Format-D- A Wing.PDF22 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Neelyog Virat- Wing - A.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A- Engineers Certificate- Neelyog Virat Wing-A- March-21.pdf29 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 CA Certificate Neelyog Virat A Wing 31 03 2020.pdf4 Jan 2021
Form 2AFile: Form 2A- Engineers Certificate-Neelyog Virat-A Wing -Quality Assurance Certificate -Sep-2029 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Neelyog Virat A Wing Form 5 Auditors Certificate.pdf29 Nov 2019
Certificates of CA (Form 5)File: Neelyog Virat A Wing Form 5 Auditors Certificate.pdf30 Sep 2019
Form 2AFile: FORM 2A -Engineers Certificate- Neelyog Virat- A Wing- Quality Assurance-Mar-2019.PDF1 Jun 2019
Building plan approvalFile: Amended Plan Bldg No 7.pdf2 Apr 2019
Building Plan Approval (IOD)File: Amended Plan Bldg No 7.pdf2 Apr 2019
Form 2AFile: Neelyog Virat- Wing A Engineers Certificate for Quality Assurance-Dec-2018.pdf22 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- Neelyog Virat- A WIng 31 03 2018.pdf23 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Neelyog Virat -AWing 31 03 2018.pdf23 Oct 2018
Certificates of CA (Form 3)File: NEELYOG VIRAT A WING 31 03 2018compressed.pdf15 Oct 2018
Certificates of CA (Form 5)File: NBeelyog Virat A Wing Form 5 CA Certificate.pdf15 Oct 2018
Building plan approvalFile: Ameded Plan of Building No 7 Dated 01082018.pdf9 Sep 2018
Building Plan Approval (IOD)File: Ameded Plan of Building No 7 Dated 01082018.pdf9 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Neelyog Virat A Winf 31 12 2017.pdf8 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Neelyog Virat A Wing 31 12 2017.pdf8 Mar 2018
Certificates of CA (Form 3)File: CA Certificate Neelyog Virat A Wing.pdf8 Mar 2018
Building plan approvalFile: Approved Plans 30 11 2017.pdf15 Jan 2018
Building Plan Approval (IOD)File: Approved Plans 30 11 2017.pdf15 Jan 2018
Certificates of CA (Form 5)File: CA Certificate NeelyogVirat wing A 30 09 2017.pdf15 Jan 2018
Building plan approvalFile: Approved Plans.pdf4 Dec 2017
Building Plan Approval (IOD)File: Approved Plans.pdf4 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf4 Dec 2017
Proforma of Allotment letterFile: Neelyog Virat Sale Agreement As per Rera Final 30112017.pdf4 Dec 2017
Proforma of Allotment letterFile: Neelyog Virat Sale Agreement As per Rera Final 22112017.pdf28 Nov 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Neelyog Virat A wing.pdf28 Jul 2017
Layout approvalFile: Layout Plan Final.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan Final.pdf27 Jul 2017
Declaration in FORM BFile: Declaration Form B - A Wing.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate -A Wing.pdf27 Jul 2017
Certificates of CA (Form 3)File: CA Certificate- A Wing.pdf27 Jul 2017
Proforma of Allotment letterFile: Allotment Letter A Wing.pdf27 Jul 2017
Building plan approvalFile: IOD and Approved Plan.pdf26 Jul 2017
PAN CardFile: PAN CARD - NCPL.pdf26 Jul 2017
Copy of the legal title reportFile: Dhanji wadi Title Report.pdf26 Jul 2017
Details of encumbrancesFile: Encumbrances - A Wing.pdf26 Jul 2017
Building Plan Approval (IOD)File: IOD and Approved Plan.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Virat CC.pdf26 Jul 2017
OtherFile: Self Declaration A Wing.pdf26 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Neelyog Virat B WingDhanjiwadi Malad East Mumbai-400097110CompletedDec 2024Dec 2020
Neelyog AashiyanaTank lane Sunder Pada Kandivali W Mumbai 400067147CompletedMar 2022Sep 2020
Neelyog Samruddhi Building No 11 ADhanjiwadi Khit Kuwa Road Malad East Mumbai 400097122CompletedDec 2016Late, Apr 2017
Neelyog AnandLaxmi Nagar ANdheri Kurla Link Road Ghatkopar East Mumbai-400075134CompletedDec 2015Mar 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neelyog Virat -A Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhanjiwadi6,700+ in Mumbai Suburban

2 kmNeelyog Virat -A WingCompleted 132Lapsed / revoked 86Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 356 registered projects within 2 km.

Builder: Neelyog Construction Pvt Ltd

Neelyog Construction Pvt Ltd has 4 registrations on MahaRERA, including Neelyog Aashiyana and Neelyog Virat -B Wing. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Neelyog Virat -A Wing is delayed beyond 29 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neelyog Virat -A Wing?

The registered promoter entity is Neelyog Construction Pvt Ltd, a company as per the filing. Its CIN U45200MH1993PTC073168 and GSTIN 27AAACN1792R1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neelyog Virat -A Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Neelyog Virat -A Wing?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Neelyog Virat -A Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neelyog Virat -A Wing?

The professionals named in the filing: Architect: Tandel & Associates; Engineer: K O Davasia; Chartered Accountant: Sonal V Desai; Chartered Accountant: Lalit Mehta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neelyog Virat -A Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neelyog Virat -A Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neelyog Virat -A Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.