Home / Browse projects / Thane, Maharashtra / NEELKAMAL RESIDENCY AND BUSINESS PARK

Completed No litigation declared Others project

NEELKAMAL RESIDENCY AND BUSINESS PARK

By NEELKAMAL BUILDCO

RG-MH-14383 · RERA P51700022681 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
9 of 18Construction stages doneacross 2 buildings; furthest along: Staircases, 98%
10 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 162 documents Report an error

NEELKAMAL RESIDENCY AND BUSINESS PARK is a Others project by NEELKAMAL BUILDCO in Thane, Maharashtra, registered with MahaRERA as P51700022681 on 12 Oct 2019. The registration is recorded completed; possession was promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 82 of the 92 units on this registration are recorded sold or booked, and 9 of 18 construction stages are filed complete.

At a glance

Project

  • NameNEELKAMAL RESIDENCY AND BUSINESS PARK
  • TypeOthers
  • Location
    • TALOJA ROAD
    • USATANE VILLAGE
    • Usatane
    • Ambarnath
    • Thane
    • 421204
  • Pincode421204
  • RERA no.P51700022681
  • ReraGenie IDRG-MH-14383

Builder

  • NameNEELKAMAL BUILDCO
  • Entity typePartnership
  • PartnersASHISH SHARMA, VISHNU AMARDEV SHARMA, NILESH BARKU MORE, SHRADDHA MUKESH MORE, RAMPHER RAMDIN SHARMA

Key dates

this monthRegisteredOct 2019First promiseDec 2025Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Oct 2019
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed162 files

Current status

89%82 of 92 units booked
93.0%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WINGNA55441256
B- WINGNA5527936

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 98%.

A-WING99%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
B- WING87%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes99%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes40%
Street LightingYes35%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes78%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Open Space104

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jun 2025

Approvals and building plan

Sanctioning authorityAmbarnath
Permissible FSI4335.0
Proposed, not sanctioned4,335 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR EAST
Estimated costRs 11.94 cr
Cost incurredRs 11.10 cr
Work done92.96%
BuildingWingEstimatedIncurred
A-WINGNARs 5.63 crRs 5.60 cr
B- WINGNARs 3.80 crRs 3.75 cr
-NARs 2.51 crRs 1.75 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMUKESH BARKU MORE BARKU MORE
EngineerUMESH CHIPADE Chipade
Chartered AccountantHITESH ANAND CHANDWANI
Chartered AccountantASHWINI KRISHNA PRABHU
Chartered AccountantMUKESH JAIN
PartnerRole in project
NEELKAMAL BUILDCO-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA24122518957Dec 2025 → Dec 2026

Reason as filed by the promoterSales is not Achieved as per our expectation . Therefore there is fund issue to complete the project . Trying to finish the project as early as possible. Please Grant the extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Sep 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed162

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Final OC.pdf25 May 2026
Occupational CertificateFile: neelkamal Wing A Architect Certicate.pdf25 May 2026
Occupational CertificateFile: NEELKAMAL BUILCON B wing architect certificate.pdf25 May 2026
Form 5 (FY 2025-2026)File: Form 5.pdf4 May 2026
Withdrawal Update Form 1File: Form 1 Mar 26.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 Mar 26.pdf2 May 2026
Withdrawal Update Form 3File: Form 3 Mar 2026.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf8 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf8 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3_V1_compressed.pdf8 Apr 2026
Withdrawal Update Form 3File: Form 3_V1_compressed.pdf8 Apr 2026
Form 2A (FY 2021-2022)File: Quality Assurance 21-22.pdf8 Apr 2026
Form 2A (FY 2022-2023)File: Quality Assurance 22-23.pdf8 Apr 2026
Form 2A (FY 2023-2024)File: Quality Assurance 23-24.pdf8 Apr 2026
Form 2A (FY 2024-2025)File: Quality Assurance 24-25.pdf8 Apr 2026
Form 5 (FY 2021-2022)File: Form 5 March 2021.pdf8 Apr 2026
Form 5 (FY 2022-2023)File: Form 5 March 2022.pdf8 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 March 2024.pdf8 Apr 2026
Withdrawal Update Form 1File: Architect certificate neelkamal buildcon sep 2025.pdf29 Nov 2025
Withdrawal Update Form 2File: Neelkamal Buildcon Eng Certificate Sep 2025.pdf29 Nov 2025
Withdrawal Update Form 3File: Neelkamal Buildcon Sept 2025 Form 3_compressed.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 March 2025.pdf22 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf21 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf21 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf21 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf21 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf21 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf21 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf21 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf21 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf21 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf21 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf21 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf21 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf21 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf21 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf21 Jul 2025
Form 1File: Form 1 March 25.pdf15 Jul 2025
Form 2File: Form 2 March 25.pdf15 Jul 2025
Form 3File: Form 3 March 25.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: Form 3 March 25.pdf15 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf15 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf15 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf15 Jul 2025
Withdrawal Update Form 1File: June 25 Form 1.pdf15 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf15 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf15 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf15 Jul 2025
Withdrawal Update Form 2File: Revised Form 2 June 25.pdf15 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf15 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf15 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf15 Jul 2025
Withdrawal Update Form 3File: Neelkamal June 25 Form 3.pdf15 Jul 2025
Withdrawal Update Form 1File: Form 1 March 25.pdf27 Jun 2025
Withdrawal Update Form 1File: Form 1 March 25.pdf27 Jun 2025
Withdrawal Update Form 2File: Form 2 March 25.pdf27 Jun 2025
Withdrawal Update Form 2File: Form 2 March 25.pdf27 Jun 2025
Withdrawal Update Form 3File: Form 3 March 25.pdf27 Jun 2025
Withdrawal Update Form 3File: Form 3 March 25.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 24 _compressed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neelkamal Buildcoin Dec 24_compressed.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 24 Neelkamal Bildcoin_compressed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf30 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep 24.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24 Neelkamal.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf30 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf30 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Form 3 June 24 Neelkamal.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Neelkamal Mar 24.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neelkamal Mar 24.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neelkamal Mar 24.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Neelkamal form 3 Dec 23_compressed.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Neelkamal Form 5 22-23.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Neelkamal Form 1 Mar 23.pdf10 Oct 2023

How this compares with Thane

89%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEELKAMAL RESIDENCY AND BUSINESS PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near USATANE VILLAGE7,600+ in Thane

Builder: NEELKAMAL BUILDCO

NEELKAMAL BUILDCO has 1 registration on MahaRERA, including NEELKAMAL RESIDENCY AND BUSINESS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if NEELKAMAL RESIDENCY AND BUSINESS PARK is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEELKAMAL RESIDENCY AND BUSINESS PARK?

The registered promoter entity is NEELKAMAL BUILDCO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEELKAMAL RESIDENCY AND BUSINESS PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEELKAMAL RESIDENCY AND BUSINESS PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NEELKAMAL RESIDENCY AND BUSINESS PARK?

The professionals named in the filing: Architect: MUKESH BARKU MORE BARKU MORE; Engineer: UMESH CHIPADE Chipade; Chartered Accountant: HITESH ANAND CHANDWANI; Chartered Accountant: ASHWINI KRISHNA PRABHU; Chartered Accountant: MUKESH JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NEELKAMAL RESIDENCY AND BUSINESS PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEELKAMAL RESIDENCY AND BUSINESS PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEELKAMAL RESIDENCY AND BUSINESS PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.