Home / Browse projects / Pune, Maharashtra / Neelanchal Phase II

Registered No litigation declared Residential / Group Housing project

Neelanchal Phase II

By Pinnacle Vastunirman Pvt. Ltd

RG-MH-09966 · RERA P52100004124 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • 45 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 90%
31 of 253Units unsoldnot recorded sold or booked
45Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Neelanchal Phase II is a Residential / Group Housing project by Pinnacle Vastunirman Pvt. Ltd in Pune, Maharashtra, registered with MahaRERA as P52100004124 on 8 Aug 2017. Possession is promised by 30 Dec 2026. 222 of the 253 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete. 45 complaints are on record with the regulator.

At a glance

Project

  • NameNeelanchal Phase II
  • TypeResidential / Group Housing
  • Location
    • SUS
    • PUNE
    • Mulshi
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004124
  • ReraGenie IDRG-MH-09966

Builder

  • NamePinnacle Vastunirman Pvt. Ltd
  • Entity typeCompany
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed109 files

Current status

88%222 of 253 units booked
69.8%Work done, per cost certificate

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA222296096
D BUILDINGNA222277077
E BUILDINGNA222280080

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

C BUILDING52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)70%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
D BUILDING54%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)70%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises78%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
E BUILDING40%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)80%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
C BUILDING11
D BUILDING11
E BUILDING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,394 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI27189.08
Proposed, not sanctioned26,447 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APTS, CTS 870 BHANDARKAR ROAD, PUNE
Estimated costRs 91.40 cr
Cost incurredRs 63.79 cr
Work done69.79%
BuildingWingEstimatedIncurred
C BUILDINGNARs 27.42 crRs 18.27 cr
D BUILDINGNARs 27.42 crRs 18.27 cr
E BUILDINGNARs 27.42 crRs 18.27 cr
-NARs 9.14 crRs 8.98 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHrishikesh Kulkarni
EngineerRANJIT DHOBALE
Chartered AccountantSPCM & ASSOCIATE
Chartered AccountantCA VIDHI S SHAH
Chartered AccountantSPCM & ASSOCIATES
PartnerRole in project
Pinnacle Vastunirman Pvt. Ltd-

Complaints filed with MahaRERA45

Case no.ComplainantRespondentFiled
CC005000000010410Manoj SharmaGajendra Dattatray Pawar15/10/2017
CC005000000117000Shekhar GuptaMr. Gajendra Dattatray Pawar22/04/2022
CC12501303Prashant Krishnat JadhavPinnacle Vastunirman Pvt. Ltd20/04/2025
CC12400808Swapnil Vishwas BoratePinnacle Vastunirman Pvt. Ltd17/11/2024
CC12501150Sanket Devidas GadhePinnacle Vastunirman Pvt. Ltd06/04/2025
CC12401255Sou Shanal Aditya BhosarekarPinnacle Vastunirman Pvt. Ltd27/12/2024
CC12501151pareshwar bhattPinnacle Vastunirman Pvt Ltd.06/04/2025
CC12501804Hemanshu Prakash DongrePinnacle Vastunirman Pvt. Ltd02/06/2025
CC12501180Pratik Kishor KelkarPinnacle Vastunirman Pvt. Ltd09/04/2025
CC12503012Reena RajPinnacle Vastunirman Pvt. Ltd26/08/2025
CC12503331Prakash KumarPinnacle Vastunirman Pvt. Ltd17/09/2025
CC12502480Shrikant Mohan DaradePinnacle Vastunirman Pvt. Ltd19/07/2025
CC12502699Satish Ramhari BhorPinnacle Vastunirman Pvt. Ltd02/08/2025
CC12502745Sadanand VerulePinnacle Vastunirman Pvt. Ltd05/08/2025
CC12502722Karan MashalPinnacle Vastunirman Pvt. Ltd04/08/2025
CC12502764Nilesh DevlekarPinnacle Vastunirman Pvt. Ltd06/08/2025
CC12502746Yogesh ShitolePinnacle Vastunirman Pvt. Ltd05/08/2025
CC12502756Anup Raj SinghPinnacle Vastunirman Pvt. Ltd06/08/2025
CC12502782Jitendra Dinkar JawalePinnacle Vastunirman Pvt. Ltd07/08/2025
CC12502876Ashish RaoPinnacle Vastunirman Pvt. Ltd16/08/2025
CC12502906Prashant BabarPinnacle Vastunirman Pvt. Ltd19/08/2025
CC12502962Rahul ThoratPinnacle Vastunirman Pvt. Ltd22/08/2025
CC12503289Bharat JoshiPinnacle Vastunirman Pvt. Ltd15/09/2025
CC12503279Mohit Shantaram ChaudhariPinnacle Vastunirman Pvt. Ltd14/09/2025
CC12503222Amit DhumalPinnacle Vastunirman Pvt. Ltd12/09/2025
CC12503226Deepak HandorePinnacle Vastunirman Pvt. Ltd12/09/2025
CC12503305Jyoti DombePinnacle Vastunirman Pvt. Ltd16/09/2025
CC12503686Deepak Dinesh JainPinnacle Vastunirman Pvt. Ltd16/10/2025
CC12503320Padmaja NaikPinnacle Vastunirman Pvt. Ltd17/09/2025
CC12503357Yashpal IngawalePinnacle Vastunirman Pvt. Ltd20/09/2025
CC12503415Adv Shreya Anup HadgaonkarPinnacle Vastunirman Pvt. Ltd24/09/2025
CC12503449Vishal ChavanPinnacle Vastunirman Pvt. Ltd27/09/2025
CC12503450Swapnil ChavanPinnacle Vastunirman Pvt. Ltd27/09/2025
CC12503504Avdhoot Jayant PathakPinnacle Vastunirman Pvt. Ltd01/10/2025
CC12503534Sandesh DevkarPinnacle Vastunirman Pvt. Ltd03/10/2025
CC12503579Ashutosh SathePinnacle Vastunirman Pvt. Ltd08/10/2025
CC12503878Niranjan AdmanePinnacle Vastunirman Pvt. Ltd05/11/2025
CC12503959Omprakash GanvirPinnacle Vastunirman Pvt. Ltd11/11/2025
CC12504026Mayuri PatilPinnacle Vastunirman Pvt. Ltd15/11/2025
CC12504102Puneet MahajanPinnacle Vastunirman Pvt. Ltd21/11/2025
CC12600943Sumant Vijendra ChavhanPinnacle Vastunirman Pvt. Ltd20/02/2026
CC12600017Ashish BharadePinnacle Vastunirman Pvt. Ltd02/01/2026
CC12601423SANMIT SANJIT SARKARPinnacle Vastunirman Pvt. Ltd14/03/2026
CC12600999Rajesh Pitambar BhurePinnacle Vastunirman Pvt. Ltd24/02/2026
CC12601406Aakash AgrawalPinnacle Vastunirman Pvt. Ltd14/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Q4 FY 2022-23.pdf11 Feb 2026
Form 2A (FY 2023-2024)File: Q4 FY 2023-24.pdf11 Feb 2026
Form 2A (FY 2024-2025)File: Q4 FY 2024-25.pdf11 Feb 2026
Withdrawal Update Form 1File: Q2 FY 2025 2026 FORM 1.pdf6 Feb 2026
Withdrawal Update Form 1File: FORM 1 PH II_compressed.pdf6 Feb 2026
Withdrawal Update Form 2File: Q2 FY 2025-26FORM 2.pdf6 Feb 2026
Withdrawal Update Form 2File: FORM2.pdf6 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 phase II FY 25-26 (1)_compressed.pdf6 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 phase II FY 25-26 (1)_compressed.pdf6 Feb 2026
Form 5 (FY 2022-2023)File: PHASE II FY 2022-23.pdf6 Feb 2026
Form 5 (FY 2023-2024)File: PHASE II FY 2023-24.pdf6 Feb 2026
Form 5 (FY 2024-2025)File: PHASE II FY 2024-25.pdf6 Feb 2026
Withdrawal Update Form 1File: FORM 1 Q1 FY 2025 2026.pdf5 Feb 2026
Withdrawal Update Form 1File: Q2 FY 2025 2026 FORM 1.pdf5 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q1 FY 2025-26.pdf5 Feb 2026
Withdrawal Update Form 2File: Q2 FY 2025-26FORM 2.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 25 26.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 Q2 FY 2526.pdf5 Feb 2026
Form 1File: FORM 1 PH II Q1 23 24.pdf2 Feb 2026
Form 2File: FORM 2 Q1 FY 2023-24.pdf2 Feb 2026
Form 3File: Form 3 Q1 FY 23 24_compressed.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q1 FY 2023 24.pdf2 Feb 2026
Form 1File: FORM 1 Q2 23 24.pdf2 Feb 2026
Form 2File: FORM 2 Q2 FY 2023-24.pdf2 Feb 2026
Form 3File: Form 3 Q2 FY 23 24_compressed.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q2 FY 2023 24.pdf2 Feb 2026
Form 1File: FORM 1 Q3 FY 2022 2023.pdf22 Jan 2026
Form 2File: FORM 2 Q3 FY 2022 23.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q3 FY 2022 23.pdf22 Jan 2026
Form 3File: Form 3 Q3 FY 22 23_compressed.pdf22 Jan 2026
Form 1File: FORM 1 Q4 FY 2022 2023.pdf22 Jan 2026
Form 2File: FORM 2 Q4 FY 2022 23.pdf22 Jan 2026
Form 3File: Form 3 Q4 FY 22 23_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q4 FY 2022 23.pdf22 Jan 2026
Form 1File: FORM 1 Q3 FY 2023 2024.pdf22 Jan 2026
Form 2File: FORM 2 Q3 FY 2023 24.pdf22 Jan 2026
Form 3File: Form 3 Q3 FY 23 24_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORRY Q3 FY 2023 24.pdf22 Jan 2026
Form 1File: FORM 1 Q4 FY 2023 2024.pdf22 Jan 2026
Form 2File: FORM 2 Q4 FY 2023-24.pdf22 Jan 2026
Form 3File: Form 3 Q4 FY 23 24_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q4 FY 2023 24.pdf22 Jan 2026
Form 1File: FORM 1 Q1 FY 2024 2025.pdf22 Jan 2026
Form 2File: FORM 2 Q1 FY 2024 25.pdf22 Jan 2026
Form 3File: Form 3 Q1 FY 24 25_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q1 FY 2024 25_compressed.pdf22 Jan 2026
Form 1File: FORM 1 Q2 FY 2024 2025.pdf22 Jan 2026
Form 2File: FORM 2 Q2 FY 2024 25.pdf22 Jan 2026
Form 3File: Form 3 Q2 FY 24 25_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q2 FY 2024 25_compressed.pdf22 Jan 2026
Form 1File: FORM 1 Q3 FY 2024 2025.pdf22 Jan 2026
Form 2File: FORM 2 Q3 FY 2024 25.pdf22 Jan 2026
Form 3File: Form 3 Q3 FY 24 25_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q3 FY 2024 25_compressed.pdf22 Jan 2026
Form 1File: FORM 1 Q4 FY 2024 2025.pdf22 Jan 2026
Form 2File: FORM 2 Q4 FY 2024 25.pdf22 Jan 2026
Form 3File: Form 3 Q4 FY 24 25_compressed.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY Q4 FY 2024 25_compressed.pdf22 Jan 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf21 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 Neelanchal Ph2.pdf21 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_Neelanchal Ph2.pdf21 Oct 2022
Certificates of CA (Form 3)File: PII - FORM 3 - SIGNED - Q2_compressed.pdf21 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: PINNACLE VASTU PHASE II FORM 5.pdf12 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: March 2021 RERA Certificate (Form-1).pdf28 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 2022.pdf28 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2022.pdf28 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_March 21.pdf28 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 22.pdf28 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 22.pdf28 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A_March2021.pdf28 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A March2022.pdf28 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form2A June2022.pdf28 Jul 2022
Certificates of CA (Form 3)File: Form3 March2021.pdf28 Jul 2022
Certificates of CA (Form 3)File: Form3 March2022.pdf28 Jul 2022
Certificates of CA (Form 3)File: Form3 June2022.pdf28 Jul 2022
Details of encumbrancesFile: PVPV- Mortgage.pdf27 Aug 2021
Certificates of CA (Form 3)File: Form 3 our format phase II updated.pdf17 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 8B FORM 5 - Neelanchal Phase II.pdf17 Jul 2021
Details of encumbrancesFile: Mortgage Deed.pdf20 May 2021
OtherFile: Mortgage Deed.pdf17 May 2021

How this compares with Pune

88%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neelanchal Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmNeelanchal Phase IICompleted 93Lapsed / revoked 29Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 170 registered projects within 2 km.

Builder: Pinnacle Vastunirman Pvt. Ltd

Pinnacle Vastunirman Pvt. Ltd has 2 registrations on MahaRERA, including Neelanchal Phase I and Neelanchal Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Neelanchal Phase II is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neelanchal Phase II?

The registered promoter entity is Pinnacle Vastunirman Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neelanchal Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Neelanchal Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Neelanchal Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neelanchal Phase II?

The professionals named in the filing: Architect: Hrishikesh Kulkarni; Engineer: RANJIT DHOBALE; Chartered Accountant: SPCM & ASSOCIATE; Chartered Accountant: CA VIDHI S SHAH; Chartered Accountant: SPCM & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neelanchal Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neelanchal Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neelanchal Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.