Home / Browse projects / Pune, Maharashtra / Neelanchal Phase I

Registered No litigation declared Mixed project

Neelanchal Phase I

By Pinnacle Vastunirman Pvt. Ltd

RG-MH-09955 · RERA P52100004125 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • 23 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
14 of 33Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 97%
19 of 193Units unsoldnot recorded sold or booked
23Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Neelanchal Phase I is a Mixed project by Pinnacle Vastunirman Pvt. Ltd in Pune, Maharashtra, registered with MahaRERA as P52100004125 on 8 Aug 2017. Possession is promised by 30 Dec 2026. 174 of the 193 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete. 23 complaints are on record with the regulator.

At a glance

Project

  • NameNeelanchal Phase I
  • TypeMixed
  • Location
    • SUS
    • PUNE
    • Mulshi
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004125
  • ReraGenie IDRG-MH-09955

Builder

  • NamePinnacle Vastunirman Pvt. Ltd
  • Entity typeCompany
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed99 files

Current status

90%174 of 193 units booked
90.1%Work done, per cost certificate

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA131396096
CommercialNA33000
WING ANA131396096

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 97%.

Wing B72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Commercial0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A72%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes25%
Treatment And Disposal Of Sewage And Sullage WaterYes20%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes25%
Open ParkingYes5%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered26
Open Space56
BuildingClosed/CoveredOpen SpaceTotal
Wing B241640
Commercial12425
WING A11617

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,190 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
G P CORPORATION LLPPune (M Corp.)Pune
G P REALTYPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI18507.79
Proposed, not sanctioned17,726 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APTS, CTS 870 Bhandarkar road, Pune
Estimated costRs 47.31 cr
Cost incurredRs 42.62 cr
Work done90.08%
BuildingWingEstimatedIncurred
Wing BNARs 21.39 crRs 19.11 cr
WING ANARs 21.39 crRs 19.11 cr
-NARs 4.53 crRs 4.40 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHrishikesh Kulkarni
EngineerRanjit Dhobale
Chartered AccountantCA VIDHI S SHAH
Chartered AccountantSPCM & ASSOCIATE
PartnerRole in project
Pinnacle Vastunirman Pvt. Ltd-

Litigation declared1

CaseCourtStatus
1601/2013CJJDDisposed off

Complaints filed with MahaRERA23

Case no.ComplainantRespondentFiled
CC005000000010695Neeraj Ramavtar YadavPinnacle Vastunirman Pvt Ltd27/12/2017
CC005000000010901SUNIL SHRINIWAS DHARMADHIKARIPinnacle Vastunirman Pvt Ltd14/01/2018
CC005000000010942Adgonda Bhupal PatilPinnacle Vastunirman pvt ltd21/01/2018
CC005000000010971Mayur Vinodrao BhandarkarPinnacle Vastunirman Pvt Ltd23/01/2018
CC005000000064874Shailesh KotianPinnacle Vastunirman Pvt. Ltd06/12/2020
CC005000000075035Sandip Vishnu SawantPinnacle Vastunirman Pvt. Ltd02/01/2021
CC005000000085525Vishal Dilip UjalambePinnacle Vastunirman Pvt Ltd06/05/2021
CC005000000106604Sandeep Jayaram ShettyPinnacle Vastunirman Pvt.Ltd10/02/2022
CC005000000106692Tejaswini Jayprakash JadhavPinnacle Vastunirman Pvt.Ltd26/02/2022
CC005000000116994Shiv Dhanraj MeshramPinnacle Vastunirman Pvt Ltd21/04/2022
CC005000000117026Adgonda Bhupal PatilPINNACLE VASTUNIRMAN PVT. LTD.09/05/2022
CC005000000157239Ameya Anil DiwanPINNACLE VASTUNIRMAN PVT.LTD.25/06/2022
CC005000000157318SHASHIDHAR GOPALKRISHNA RAMESHPINNACLE VASTUNIRAMAN PVT LTD05/07/2022
CC005000000157265RAJEEV UPADHYAYPINNACLE VASTUNIRMAN PVT LTD24/06/2022
CC005000000157336SANJEEV UPADHYAYPINNACLE VASTUNIRMAN PVT. LTD.14/07/2022
CC005000000167459Anita JangirPinnacle Vastunirman Pvt. Ltd.23/08/2022
CC005000000177732PREETI GANDHEG P CORPORATION LLP01/12/2022
CC005000000198016Ravindra Pandurang SonavalePinnacle Vastunirman Pvt. Ltd29/12/2022
CC005000000198020Shraddha Sitaram AmbrePinnacle Vastunirman Pvt. Ltd29/12/2022
CC005000000198136Nikhil Jagannath PatilPinnacle Vastunirman Pvt. Ltd18/01/2023
CC005000000198141Pratibha Vinayak MeshramPinnacle Vastunirman Pvt. Ltd18/01/2023
CC005000000269544Namrata SortePINNACLE VASTUNIRMAN PVT LTD02/11/2023
CC12601924Rakshit Rajeev DeshmukhPinnacle Vastunirman Pvt. Ltd01/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: fORM 1_compressed.pdf11 Feb 2026
Withdrawal Update Form 2File: Q3_FORM 2_2025-26_PHASE I_0001.pdf11 Feb 2026
Withdrawal Update Form 3File: Signed form 3 FY 25-26 Q3.pdf11 Feb 2026
Form 1File: 1_0001 FORM1.pdf6 Feb 2026
Form 2File: FORM 2 Q4 FY 2022-23.pdf6 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2022-23 Q4_compressed.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 FY 2022-23_compressed.pdf6 Feb 2026
Form 1File: 3_0001 FORM 1.pdf6 Feb 2026
Form 2File: FORM 2 Q1 FY 2023-24.pdf6 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2023-24 Q1_compressed.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q1 FY 2023-24_compressed.pdf6 Feb 2026
Form 1File: 2_0001FORM1.pdf6 Feb 2026
Form 2File: FORM 2 Q2 FY 2023-24.pdf6 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2023-24 Q2_compressed.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q2 FY 2023-24_compressed.pdf6 Feb 2026
Form 2File: FORM 2 Q1 FY 2024-25.pdf6 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2024-25 Q1_compressed.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q1 FY 2024-25_compressed.pdf6 Feb 2026
Form 1File: FORM 1_compressed.pdf6 Feb 2026
Withdrawal Update Form 1File: Q1_2025-26_FORM 1.pdf6 Feb 2026
Withdrawal Update Form 1File: Q2_2025-26_FORM 1.pdf6 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q1 FY 2025-26.pdf6 Feb 2026
Withdrawal Update Form 2File: FORM 2 Q2 FY 2025-26.pdf6 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 Phase 1 FY 2025-26 Q1_compressed (2).pdf6 Feb 2026
Withdrawal Update Form 3File: Signed Form 3 Phase 1 FY 2025-26 Q2_compressed (2).pdf6 Feb 2026
Form 1File: Q3_2023-24_FORM1.pdf5 Feb 2026
Form 2File: FORM 2 Q3 FY 2023-24.pdf5 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2023-24 Q3_compressed (1).pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q3 FY 2023-24_compressed (2).pdf5 Feb 2026
Form 1File: Q4_2023-24_FORM 1.pdf5 Feb 2026
Form 2File: FORM 2 Q4 FY 2023-24.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 FY 2023-24_compressed.pdf5 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2023-24 Q4_compressed.pdf5 Feb 2026
Form 1File: Q2_2024-25_FORM 1.pdf5 Feb 2026
Form 2File: FORM 2 Q2 FY 2024-25.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q2 FY 2024-25_compressed.pdf5 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2024-25 Q2_compressed.pdf5 Feb 2026
Form 1File: Q3_2024-25_FORM 1.pdf5 Feb 2026
Form 2File: FORM 2 Q3 FY 2024-25.pdf5 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2024-25 Q3_compressed.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q3 FY 2024-25_compressed.pdf5 Feb 2026
Form 1File: Q4_2024-25_FORM 1.pdf5 Feb 2026
Form 2File: FORM 2 Q4 FY 2024-25.pdf5 Feb 2026
Form 3File: Signed Form 3 Phase 1 FY 2024-25 Q4_compressed.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q4 FY 2024-25_compressed.pdf5 Feb 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Neelanchal Phase I_March 2021_compressed.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Neelanchal Phase I_March 2022_compressed.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Neelanchal Phase I_June 2022_compressed.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Neelanchal Phase I_Oct 2022_compressed.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- Neelanchal Phase I_Dec 2022_compressed.pdf29 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neelanchal Phase I_20-21.pdf29 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neelanchal Phase I_21-22.pdf29 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neelanchal Phase I_Q1-22-23_compressed.pdf29 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Neelanchal Phase I_Q2-22-23_compressed.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Neelanchal Phase I_20-21.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Neelanchal Phase I_21-22.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Neelanchal Phase I_Q1-22-23.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Neelanchal Phase I_Q2-22-23.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A- Neelanchal Phase I_Q3-22-23.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: MRL- Neelanchal Phase I_20-21_removed (1)_compressed.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: MRL- Neelanchal Phase I_Q3_22-23_removed (1)_compressed.pdf29 Apr 2023
Certificates of CA (Form 3)File: FORM-3 FY2020-21-SIGNED_compressed (1).pdf29 Apr 2023
Certificates of CA (Form 3)File: FORM-3 FY2021-22-SIGNED_compressed.pdf29 Apr 2023
Certificates of CA (Form 3)File: FORM-3 FY2022-23 Q1-SIGNED_compressed (1).pdf29 Apr 2023
Certificates of CA (Form 3)File: FORM-3 FY2022-23 Q2-SIGNED_compressed.pdf29 Apr 2023
Certificates of CA (Form 3)File: FORM-3 FY2022-23 Q3-SIGNED_compressed.pdf29 Apr 2023
Details of encumbrancesFile: Mortgage Deed.pdf20 May 2021
OtherFile: Mortgage Deed.pdf17 May 2021
Certificates of CA (Form 3)File: 17-18 Form 3 Neelanchal I WEF.pdf24 Feb 2021
Certificates of CA (Form 3)File: 17-18 Form 3 Neelanchal I WEF.pdf24 Feb 2021
Certificates of CA (Form 3)File: 18-19 form 3 WEF Neelanchal I.pdf24 Feb 2021
Certificates of CA (Form 3)File: 19-20 form 3 WEF Neelanchal I.pdf24 Feb 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Phase I 1819 Form 5.pdf29 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Phase I 1920 Form 5.pdf29 Jan 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Neelanchal Phase I - Form 5_compressed.pdf13 Dec 2019
Details of encumbrancesFile: Neelanchal - encumberances -Phase-I.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase I -A.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Phase I -B.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE A B Reduction.pdf29 Jul 2017

How this compares with Pune

90%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neelanchal Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmNeelanchal Phase ICompleted 93Lapsed / revoked 32Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 173 registered projects within 2 km.

Builder: Pinnacle Vastunirman Pvt. Ltd

Pinnacle Vastunirman Pvt. Ltd has 2 registrations on MahaRERA, including Neelanchal Phase I and Neelanchal Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Neelanchal Phase I is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neelanchal Phase I?

The registered promoter entity is Pinnacle Vastunirman Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neelanchal Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Neelanchal Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Neelanchal Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neelanchal Phase I?

The professionals named in the filing: Architect: Hrishikesh Kulkarni; Engineer: Ranjit Dhobale; Chartered Accountant: CA VIDHI S SHAH; Chartered Accountant: SPCM & ASSOCIATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neelanchal Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neelanchal Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neelanchal Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.