Home / Browse projects / Pune, Maharashtra / Neco Officers Ville I

Registered Litigation declared Plotted project

Neco Officers Ville I

By Vasupujya Corporation

RG-MH-52374 · RERA P52100055782 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Neco Officers Ville I is a Plotted project by Vasupujya Corporation in Pune, Maharashtra, registered with MahaRERA as P52100055782 on 16 Apr 2024. Possession is promised by 31 Dec 2026. 24 of the 32 units on this registration are recorded sold or booked.

At a glance

Project

  • NameNeco Officers Ville I
  • TypePlotted
  • Location
    • 24m DP road
    • Nyati County
    • Ahead of Delhi Public School
    • MOHAMMADWADI
    • Haveli
    • Pune
    • 411060
  • Pincode411060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055782
  • ReraGenie IDRG-MH-52374

Builder

  • NameVasupujya Corporation
  • Entity typePartnership
  • GSTIN27AADFV0331Q1ZX
  • PartnersDhanesh Suresh Ajmera, Siddharth Suresh Ajmera
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed85 files

Current status

75%24 of 32 units booked
66.7%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes25%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes75%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes100%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,115 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Oct 2024

Approvals and building plan

Sanctioning authorityPune Municipal Corporation

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Neco NX, Sr No 209 Viman Nagar, Pune - 411014
Estimated costRs 6.00 cr
Cost incurredRs 4.00 cr
Work done66.67%
BuildingWingEstimatedIncurred
-NARs 6.00 crRs 4.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEmpiric Space
EngineerMahesh Kharade
Chartered AccountantYogesh Bhagat & Company
Chartered AccountantTotala And Associates
PartnerRole in project
Vasupujya Corporation-

Litigation declared3

CaseCourtStatus
826/2017Civil Court PuneUnready Board
470/2017JMFC Cantonment Court PuneReport
826/2017Civil Court PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NOV I - Form 1.pdf17 Jul 2026
Withdrawal Update Form 2File: NOV I - Form 2.pdf17 Jul 2026
Withdrawal Update Form 3File: NOV I - Form 3.pdf17 Jul 2026
Withdrawal Update Form 1File: NOV I - Form 1.pdf15 Apr 2026
Withdrawal Update Form 2File: NOV I - Form 2.pdf15 Apr 2026
Withdrawal Update Form 3File: NOV I - Form 3.pdf15 Apr 2026
Withdrawal Update Form 1File: NOV I - Form 1.pdf14 Jan 2026
Withdrawal Update Form 2File: NOV I - Form 2.pdf14 Jan 2026
Withdrawal Update Form 3File: NOV I - Form 3.pdf14 Jan 2026
Withdrawal Update Form 1File: NOV I - Form 1.pdf13 Oct 2025
Withdrawal Update Form 2File: NOV I - Form 2.pdf13 Oct 2025
Withdrawal Update Form 3File: NOV I - Form 3.pdf13 Oct 2025
Form 5 (FY 2024-2025)File: NOV I - Form 5.pdf13 Oct 2025
Withdrawal Update Form 1File: NOV I - Form 1.pdf17 Jul 2025
Withdrawal Update Form 2File: NOV I - Form 2.pdf17 Jul 2025
Withdrawal Update Form 3File: NOV I - Form 3.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NOV I - Form 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NOV I - Form 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NOV I - Form 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: NOV I - Disclosure of sold inventory.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NOV I - Form 1.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NOV I - Form 3.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NOV I - Form 2.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NOV I - Form 1.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: NOV I - Form 2.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: NOV I - Disclosure of sold inventory.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: NOV I - Form 3.pdf2 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf5 Apr 2024
Other - TechnicalFile: NOV I - Commencement Email sent by PMC.pdf29 Mar 2024
CERSAI detailsFile: CERSAI Details.pdf27 Mar 2024
Other - LegalFile: page-00001_p1-p54.pdf26 Mar 2024
Other - LegalFile: page-00002_p55-p103.pdf26 Mar 2024
Other - LegalFile: page-00003_p104-p153.pdf26 Mar 2024
Other - LegalFile: page-00004_p154-p200.pdf26 Mar 2024
Other - LegalFile: page-00005_p201-p244.pdf26 Mar 2024
Other - LegalFile: page-00006_p245-p287.pdf26 Mar 2024
Other - LegalFile: page-00007_p288-p329.pdf26 Mar 2024
Other - LegalFile: page-00008_p330-p380.pdf26 Mar 2024
Other - LegalFile: page-00009_p381-p445.pdf26 Mar 2024
Other - LegalFile: page-00010_p446-p492.pdf26 Mar 2024
Other - LegalFile: page-00011_p493-p535.pdf26 Mar 2024
Other - LegalFile: page-00012_p536-p576.pdf26 Mar 2024
Other - LegalFile: page-00013_p577-p618.pdf26 Mar 2024
Other - LegalFile: page-00014_p619-p665.pdf26 Mar 2024
Other - LegalFile: page-00015_p666-p704.pdf26 Mar 2024
Other - LegalFile: page-00016_p705-p757.pdf26 Mar 2024
Other - LegalFile: page-00017_p758-p802.pdf26 Mar 2024
Other - LegalFile: page-00018_p803-p856.pdf26 Mar 2024
Other - LegalFile: page-00019_p857-p900.pdf26 Mar 2024
Other - LegalFile: page-00020_p901-p945.pdf26 Mar 2024
Other - LegalFile: page-00021_p946-p988.pdf26 Mar 2024
Other - LegalFile: page-00022_p989-p1030.pdf26 Mar 2024
Other - LegalFile: page-00023_p1031-p1076.pdf26 Mar 2024
Other - LegalFile: page-00024_p1077-p1121.pdf26 Mar 2024
Other - LegalFile: page-00025_p1122-p1162.pdf26 Mar 2024
Other - LegalFile: page-00026_p1163-p1209.pdf26 Mar 2024
Other - LegalFile: page-00027_p1210-p1250.pdf26 Mar 2024
Other - LegalFile: page-00028_p1251-p1302.pdf26 Mar 2024
Other - LegalFile: page-00029_p1303-p1347.pdf26 Mar 2024
Other - LegalFile: page-00030_p1348-p1392.pdf26 Mar 2024
Other - LegalFile: page-00031_p1393-p1432.pdf26 Mar 2024
Other - LegalFile: page-00032_p1433-p1442.pdf26 Mar 2024
Layout approvalFile: Copy of Layout Approval.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf21 Mar 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf20 Mar 2024
Copy of the legal title reportFile: Copy of the legal title report 1.pdf18 Mar 2024
Copy of the legal title reportFile: Copy of the legal title report 2.pdf18 Mar 2024
Copy of the legal title reportFile: Copy of the legal title report 3.pdf18 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumberance Certificate - Finance.pdf18 Mar 2024
Details of encumbrances concerned to LegalFile: Encumberance Certificate - Finance.pdf18 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf18 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf18 Mar 2024
Proforma of Agreement for saleFile: Agreement to Sell.pdf18 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects.pdf18 Mar 2024
Deviation Report with respect to Allotment letterFile: Allotment Letter Deviation.pdf18 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Agreement to Sell Deviation.pdf18 Mar 2024
Building plan approval or NA orderFile: NA Order for plotted development.pdf15 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumberance Certificate - Legal.pdf15 Mar 2024
Details of encumbrances concerned to LegalFile: Encumberance Certificate - Legal.pdf15 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order for plotted development.pdf15 Mar 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Neco BeaumontMohammadwadi192CompletedDec 2023May 2023
Neco SkyParkPimple Nilakh270CompletedDec 2021Oct 2019
Neco AlphaPimple Nilakh5CompletedDec 2020Dec 2020
Neco GharkulDhankawadi20CompletedDec 2015Dec 2015

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Neco Officers Ville I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nyati County, Ahead of Delhi Public School13,700+ in Pune

2 kmNeco Officers Ville ICompleted 83Lapsed / revoked 26Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 188 registered projects within 2 km.

Builder: Vasupujya Corporation

Vasupujya Corporation has 3 registrations on MahaRERA, including Neco Beaumont and Neco Officers Ville I. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Neco Officers Ville I is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Neco Officers Ville I?

The registered promoter entity is Vasupujya Corporation, a partnership as per the filing. Its GSTIN 27AADFV0331Q1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Neco Officers Ville I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Neco Officers Ville I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Neco Officers Ville I?

The professionals named in the filing: Architect: Empiric Space; Engineer: Mahesh Kharade; Chartered Accountant: Yogesh Bhagat & Company; Chartered Accountant: Totala And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Neco Officers Ville I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Neco Officers Ville I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Neco Officers Ville I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.