Completed No litigation declared Others project

Navkar City Phase III Part 1

By Navkar Estate and Homes Pvt Ltd

RG-MH-95439 · RERA P99000011641 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 17 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Nov 2022Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 99%
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

Navkar City Phase III Part 1 is a Others project by Navkar Estate and Homes Pvt Ltd in Palghar, Maharashtra, registered with MahaRERA as P99000011641 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Nov 2022. The completion date has moved by 17 months from the original filing.

At a glance

Project

  • NameNavkar City Phase III Part 1
  • TypeOthers
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000011641
  • ReraGenie IDRG-MH-95439

Builder

  • NameNavkar Estate and Homes Pvt Ltd
  • Entity typeCompany
  • Managing DirectorLaxman Bhikaji Khedkar
  • ChairpersonChandmal Bhavarlal Jain
  • Other registrations12 more →
  • Completed6 of 13
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toNov 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Nov 2022
  • Revised completionRevised to 30 Nov 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 01 Type A Wing A4 to A10NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Building No 01 Type A Wing A4 to A10: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities18

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes40%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Compound Wall and Main Gate LayoutYes80%
Land Development Filling and LevellingYes100%
Outdoor Playing Area with Playing EquipmentYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered1
Open Space19

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,467 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI8654.5
Proposed, not sanctioned6,626 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPadmavati Grace Opp Sunrise Super Market Vasai West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajesh R C
ArchitectHimesh Gupta and Asscociates
EngineerCSE Consultant
PartnerRole in project
Navkar Estate and Homes Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000010685Jun 2021 → May 2022

Reason as filed by the promoterThe partly construction work is delayed due to non-availability of labour & material due to COVID-19 Lockdown from April 2020, As well as due to COVID-19 Lockdown, booking members couldn't pay their due payment in time. Now we are nearing to completion the said Project and in the process of obtaining the occupation certificate form VVCMC.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Sep 2023

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Navkar_Phase_III_-_Part_-1.pdf30 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ph III P 1.pdf26 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ph III P 1.pdf26 Sep 2023
Certificates of CA (Form 3)File: Navkar City Phase III Part-1.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P 3 _ P 1.pdf30 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 3 _ P 1.pdf30 Mar 2023
Certificates of CA (Form 3)File: 1.pdf29 Dec 2022
Certificates of CA (Form 3)File: 2.pdf29 Dec 2022
Certificates of CA (Form 3)File: 3.pdf29 Dec 2022
Certificates of CA (Form 3)File: 4.pdf29 Dec 2022
Certificates of CA (Form 3)File: 5.pdf29 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-3 Part 1.pdf15 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: OC Ph III.pdf6 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: development_completion_certificate.pdf1 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase-3_Part-1_.pdf16 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph_3 Part-1.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: 1 (3).pdf20 Aug 2021
Declaration about Commencement CertificateFile: Ph III - P 1.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph III - P 1.pdf17 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ph III - P 1_.pdf17 Aug 2021
Certificates of CA (Form 5)File: Navkar City Phase-3 Part-1.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Navkar City Phase-3 Part-1.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Navkar City Phase-3 Part-1.pdf17 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Navkar City Phase 3 Part-1.pdf17 Aug 2021
OtherFile: Phase III - OC application.pdf4 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph III_P1.pdf17 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: RDP _ Phase III.pdf25 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph III_P 1.pdf21 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH_III_P 1.pdf21 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph III_P 1.pdf31 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH_III_P 1.pdf31 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph_III_P1.pdf10 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph_III_P1.pdf10 May 2021
Certificates of CA (Form 3)File: Ph III _ P 1.pdf13 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph III _ P 1.pdf11 Feb 2021
Certificates of CA (Form 5)File: Ph 3 P 1.pdf8 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: Ph I AND II CC 14 FLR.pdf1 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 3_Part 1.pdf3 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 3 _Part 1.pdf29 Aug 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 3 part 1.pdf19 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 3 part 1.pdf1 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 3 part 1.pdf25 Feb 2020
Certificates of CA (Form 3)File: Ph 3 part 1.pdf25 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 3 part 1.pdf24 Feb 2020
Certificates of CA (Form 3)File: Ph 3 part 1.pdf24 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: phase 3 part 1.pdf5 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph III part 1.pdf28 Dec 2019
Certificates of CA (Form 5)File: ph 3 part 1.pdf6 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 3 Part 1.pdf30 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 3 part 1.pdf30 Mar 2019
Certificates of CA (Form 5)File: PH 3 PART 1.pdf30 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 3 Part 1.pdf25 Jul 2018
Certificates of CA (Form 5)File: Phase 3 Part 1.pdf25 Jul 2018
Proforma of Allotment letterFile: Phase 3 part 1.pdf1 Apr 2018
Proforma of Allotment letterFile: PHASE 3 PART 1.pdf1 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scaned_PDF(6) PHASE 3 PART 1.pdf31 Mar 2018
Certificates of CA (Form 5)File: Phase III part1 compres.pdf31 Mar 2018
OtherFile: Declaration Phase III.pdf31 Mar 2018
Building plan approvalFile: phase 3 part 1 7th flr plan.pdf31 Jul 2017
Layout approvalFile: phase 3 old layout.pdf31 Jul 2017
Building plan approvalFile: phase 3 part 1 1st flr plan.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: phase 3 old layout.pdf31 Jul 2017
Building Plan Approval (IOD)File: phase 3 part 1 1st flr plan.pdf31 Jul 2017
Building Plan Approval (IOD)File: phase 3 part 1 7th flr plan.pdf31 Jul 2017
Layout approvalFile: SHEET NO 1.pdf30 Jul 2017
Building plan approvalFile: III A4 2nd flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 1st flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 Gr flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 4th flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 3rd flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 5th flr plan.pdf30 Jul 2017
Building plan approvalFile: III A4 to A10 6th Terrace plan.pdf30 Jul 2017
PAN CardFile: Navkar city pan card.pdf30 Jul 2017
Copy of the legal title reportFile: Title phase III S No 224 H No 1.pdf30 Jul 2017
Details of encumbrancesFile: ENCUMBRACE PHASE 3 PART 1.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: SHEET NO 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: III A4 to A10 Gr flr plan.pdf30 Jul 2017
Building Plan Approval (IOD)File: III A4 to A10 1st flr plan.pdf30 Jul 2017
Building Plan Approval (IOD)File: III A4 2nd flr plan.pdf30 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 17 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Navkar City Phase III Part 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmNavkar City Phase III PaCompleted 34Lapsed / revoked 17Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Navkar Estate and Homes Pvt Ltd

Navkar Estate and Homes Pvt.Ltd. has 13 registrations on MahaRERA, including NAVKAR CITY Phase I part 3 and NAVKAR CITY PHASE I PART 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Navkar City Phase III Part 1 is delayed beyond 30 Nov 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Navkar City Phase III Part 1?

The registered promoter entity is Navkar Estate and Homes Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Navkar City Phase III Part 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Navkar City Phase III Part 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Navkar City Phase III Part 1?

The professionals named in the filing: Architect: Rajesh R C; Architect: Himesh Gupta and Asscociates; Engineer: CSE Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Navkar City Phase III Part 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Navkar City Phase III Part 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Navkar City Phase III Part 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.