ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Navkar City Phase II Part 2

Registered No litigation declared Others project

Navkar City Phase II Part 2

By Navkar Estate and Homes Pvt Ltd

RG-MH-62113 · RERA P99000004423 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 98%
1 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 159 documents Report an error

Navkar City Phase II Part 2 is a Others project by Navkar Estate and Homes Pvt Ltd in Palghar, Maharashtra, registered with MahaRERA as P99000004423 on 9 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 105 of the 106 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameNavkar City Phase II Part 2
  • TypeOthers
  • Location
    • naigaon east
    • naigaon
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000004423
  • ReraGenie IDRG-MH-62113

Builder

  • NameNavkar Estate and Homes Pvt Ltd
  • Entity typeCompany
  • Managing DirectorLaxman Bhikaji Khedkar
  • Other registrations12 more →
  • Completed6 of 13
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings3 building records
  • Documents filed159 files

Current status

99%105 of 106 units booked

Figures as on 22 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type A Bldg 8th to 14th FloorNA8727027
Type B Wing B 1 and B 2 8th to 14th FloorNA8753053
Type D 8th to 14th FloorNA8726026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 98%.

Type A Bldg 8th to 14th Floor90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Type B Wing B 1 and B 2 8th to 14th Floor90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Type D 8th to 14th Floor90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes98%
Street LightingYes95%
Community BuildingsYes98%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes98%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes95%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Closed/Covered3
Open Space24
BuildingClosed/CoveredOpen SpaceTotal
Type A Bldg 8th to 14th Floor11617
Type B Wing B 1 and B 2 8th to 14th Floor156
Type D 8th to 14th Floor134

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,405 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVasai-Virar Municipal Corporation
Permissible FSI5861.66
Proposed, not sanctioned5,411 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPadmavati Grace opp Sunrise Super Market Vasai West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS.ARCHDESIGNS
EngineerMADANJEET RAI
Chartered AccountantRD LUKAD AND CO
PartnerRole in project
Navkar Estate and Homes Pvt Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000018514Dec 2023 → Dec 2024

Reason as filed by the promoterEXTENSION REQUIRED AS STATUTORY COMPLIANCE ARE PENDING FOR OBTAINING OCCUPANCY CERTIFICATE

EXT99000025901Dec 2023 → Dec 2026

Reason as filed by the promoterTo, The Maharashtra Real Estate Regulatory Authority (MahaRERA), Subject: Request for Extension of Project Completion Date for Project Navkar City - Phase-II-Part-2 (Registration No: P99000004423) Dear Sir/Madam, We kindly seek your approval for an extension of the project completion date to 31/12/2026 for our project, Navkar City - Phase-II-Part-2, registered under MahaRERA Registration No: P99000004423. Background: We had declared 100% completion of construction work as of 28/03/2023 and subsequently applied for the Occupancy Certificate (OC). • Our architect has submitted the OC application

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 1 Jul 2023

Documents filed159

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 159 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2018-2019)File: 1 Engineers Certificate on Quality Assurance (Form 2A.pdf22 Jan 2026
Form 2A (FY 2017-2018)File: 1 Engineers Certificate on Quality Assurance (Form 2A.pdf22 Jan 2026
Form 2A (FY 2025-2026)File: Navkar Phase II Part 2_compressed.pdf22 Jan 2026
Form 2A (FY 2024-2025)File: Navkar Phase I Part 5_compressed.pdf1 Sep 2025
Withdrawal Update Form 1File: Ph II P 2.pdf23 Aug 2025
Withdrawal Update Form 2File: Ph 2 P 2.pdf23 Aug 2025
Withdrawal Update Form 3File: FORM 3PHASE -II PART-2.pdf23 Aug 2025
Certificates of CA (Form 3)File: Navkar Phase II Part 2_compressed.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Navkar Phase II Part 2_compressed.pdf18 Apr 2025
Declaration in FORM BFile: NAVKAR FORM B Phase2 PArt2.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Ph II P 2_page-0001.pdf27 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph II P 2.pdf24 Jan 2025
Certificates of CA (Form 3)File: Ph II P 2.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: E -Ph II P 2.pdf24 Jan 2025
Declaration in FORM BFile: Ph II P 2-FORM B_compressed.pdf26 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ph II P 2.pdf26 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph II P 2.pdf11 Dec 2024
Certificates of CA (Form 3)File: Ph II P 2.pdf11 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph II P 2.pdf11 Dec 2024
Other - TechnicalFile: Ph II P 2.pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ph II P 2.pdf13 Nov 2024
Certificates of CA (Form 3)File: Ph II P 2.pdf29 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph II P 2.pdf9 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 2 P 2.pdf9 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PHASE-II PART-2.pdf11 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PHASE-II PART-2.pdf11 May 2024
Certificates of CA (Form 3)File: FORM 3PHASE -II PART-2.pdf11 May 2024
Building plan approvalFile: 20 - Type A, Phase II 7th Floor_11zon.pdf24 Jan 2024
Building plan approvalFile: 19 - Type A, Phase II 4th To 14 th Floor_11zon.pdf24 Jan 2024
Building plan approvalFile: 18 - Type A, Phase II, Ground To 3rd Floor_11zon.pdf24 Jan 2024
Building plan approvalFile: 10 - Type D, Phase II, Gr To 14th Floor_11zon.pdf24 Jan 2024
Building Plan Approval (IOD)File: 20 - Type A, Phase II 7th Floor_11zon.pdf24 Jan 2024
Building Plan Approval (IOD)File: 19 - Type A, Phase II 4th To 14 th Floor_11zon.pdf24 Jan 2024
Building Plan Approval (IOD)File: 18 - Type A, Phase II, Ground To 3rd Floor_11zon.pdf24 Jan 2024
Building Plan Approval (IOD)File: 10 - Type D, Phase II, Gr To 14th Floor_11zon.pdf24 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PH II PART 2.pdf24 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE PH II PART 2.pdf24 Jan 2024
CERSAI detailsFile: Disclosure LK.pdf24 Jan 2024
CERSAI detailsFile: cersai.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD,UNSOLD INVENTORY.pdf24 Jan 2024
Certificates of CA (Form 3)File: Ph II P 2 - FORM 3_compressed.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure LK.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure SJ.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure LBK_compressed.pdf24 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank.pdf24 Jan 2024
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION (PH II PART 2)_compressed.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE PH II PART 2 (APR 21 TO MAR 22)_compressed.pdf19 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE PH II PART 2 (APR 22 TO MAR 23)_compressed.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Ph I P 2.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: Ph II P 2.pdf19 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph II P 2_compressed.pdf27 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ph II P 2.pdf26 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ph II P 2.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Navkar City - Phase-II-Part-2_compressed.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Navkar City - Phase-II-Part-2_compressed.pdf26 Sep 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE Phase II - Part - 2.pdf23 Sep 2023
Proforma of Allotment letterFile: ok - Allotment Letter - NEHPL - Phase II - Part 2.pdf23 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Application .pdf1 Jul 2023
Certificates of CA (Form 3)File: Navkar City Phase II Part-2.pdf22 Jun 2023
Certificates of CA (Form 3)File: Navkar City Phase II Part- 2.pdf22 Jun 2023
Certificates of CA (Form 3)File: Navkar City Phase II Part-2.pdf22 Jun 2023
Certificates of CA (Form 3)File: Navkar City Phase II Part-2.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph-2, P2.pdf10 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph-II, P2.pdf10 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph-2, P2.pdf10 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PH-II_P2.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PH-II_P2.pdf13 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-II_P2.pdf13 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-II_P2.pdf13 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P 2 _ P 2.pdf30 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: P 2 _ P 2.pdf30 Mar 2023
Certificates of CA (Form 3)File: 1.pdf29 Dec 2022
Certificates of CA (Form 3)File: 2.pdf29 Dec 2022
Certificates of CA (Form 3)File: 3.pdf29 Dec 2022
Certificates of CA (Form 3)File: 4.pdf29 Dec 2022
Certificates of CA (Form 3)File: 5.pdf29 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH-2 Part 2.pdf15 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase-2_Part-2_.pdf16 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph_2 Part-2.pdf14 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: PHII12.pdf22 Oct 2021

How this compares with Palghar

99%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 36 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Navkar City Phase II Part 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near naigaon3,200+ in Palghar

2 kmNavkar City Phase II ParCompleted 25Lapsed / revoked 7Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: Navkar Estate and Homes Pvt Ltd

Navkar Estate and Homes Pvt.Ltd. has 13 registrations on MahaRERA, including NAVKAR CITY Phase I part 3 and NAVKAR CITY PHASE I PART 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Navkar City Phase II Part 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Navkar City Phase II Part 2?

The registered promoter entity is Navkar Estate and Homes Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Navkar City Phase II Part 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Navkar City Phase II Part 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Navkar City Phase II Part 2?

The professionals named in the filing: Architect: S.ARCHDESIGNS; Engineer: MADANJEET RAI; Chartered Accountant: RD LUKAD AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Navkar City Phase II Part 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Navkar City Phase II Part 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Navkar City Phase II Part 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.