Home / Browse projects / Palghar, Maharashtra / NAVKAR CITY PHASE I PART 1
NAVKAR CITY PHASE I PART 1
By Navkar Estate and Homes Pvt Ltd
RG-MH-77383 · RERA P99000011999 · Last updated on MahaRERA portal: 29 Sep 2023
Source: official MahaRERA filing
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NAVKAR CITY PHASE I PART 1 is a Others project by Navkar Estate and Homes Pvt Ltd in Palghar, Maharashtra, registered with MahaRERA as P99000011999 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. 5 complaints are on record with the regulator.
At a glance
Project
- NameNAVKAR CITY PHASE I PART 1
- TypeOthers
- Location
- naigaon road
- don bosco
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401208
- Pincode401208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000011999
- ReraGenie IDRG-MH-77383
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Sep 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings3 building records
- Documents filed97 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE B WING B 1 AND B2 | NA | 9 | 0 | 0 | 0 | 0 |
| TYPE C Bldg C 1 | NA | 9 | 0 | 0 | 0 | 0 |
| TYPE C Bldg C 2 | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 98%.
TYPE B WING B 1 AND B290%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
TYPE C Bldg C 190%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
TYPE C Bldg C 290%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96% |
Progress on shared amenities21
As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 85% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 88% |
| Aggregate area of recreational Open Space | Yes | 88% |
| Open Parking | Yes | 80% |
| SWIMMING Pool | Yes | 80% |
| Out Door Playing Area with playing Equipment | Yes | 70% |
| Open Gymnasium | Yes | 60% |
| Multipurpose Cour | Yes | 0% |
| Land Development Filling and Levelling | Yes | 100% |
| Compound wall of layout | Yes | 80% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TYPE B WING B 1 AND B2 | 1 | 1 |
| TYPE C Bldg C 1 | 1 | 1 |
| TYPE C Bldg C 2 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJESH R C |
| Engineer | CSE Consultant |
| Partner | Role in project |
|---|---|
| Navkar Estate and Homes Pvt Ltd | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000192716 | INOX Leisure Limited | M/s. Navkar Estate & Homes Private Limited | 23/02/2020 |
| CC006000000197650 | Rakesh C Prabhu & Jyotsna C Prabhu | M/s. Navkar Estate & Homes Pvt. Ltd. & Ors.& | 18/07/2021 |
| CC006000000197660 | Govind Shridhar Parab & Anita Govind Parab | M/s. Navkar Estate & Homes Pvt. Ltd. & Ors. | 19/07/2021 |
| CC006000000197663 | Mahesh Laxman Patkar & Mansi Mahesh Patkar | M/s. Navkar Estate & Homes Pvt. Ltd. & Ors. | 19/07/2021 |
| CC006000000220992 | Ramchandra Tripathi | Suresh Jain | 29/04/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Sep 2023
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: partov.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ph I P 1.pdf | 25 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ph I P 1.pdf | 25 Sep 2023 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE - Phase I Part- 1.pdf | 22 Sep 2023 |
| Proforma of Allotment letterFile: PHASE- 1 PART-1.pdf | 22 Sep 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Ph I P 1.pdf | 22 Sep 2023 |
| Certificates of CA (Form 3)File: 1.pdf | 29 Dec 2022 |
| Certificates of CA (Form 3)File: 2.pdf | 29 Dec 2022 |
| Certificates of CA (Form 3)File: 3.pdf | 29 Dec 2022 |
| Certificates of CA (Form 3)File: 4.pdf | 29 Dec 2022 |
| Declaration about Commencement CertificateFile: Ph I - P 1.pdf | 20 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph I - P 1.pdf | 20 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Ph I - P 1_.pdf | 20 Aug 2021 |
| Certificates of CA (Form 5)File: Navkar City Phase-1, Part-1.pdf | 20 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Navkar City Phase-1, Part-1.pdf | 20 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Navkar City Phase-1, Part-1.pdf | 20 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Navkar City Phase-1, Part-1.pdf | 20 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 1_P1.pdf | 17 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Phase I _ II.pdf | 30 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Phase I _ II OC.pdf | 30 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH_I_P 1.pdf | 21 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph I_P 1.pdf | 15 Jun 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph I_P 1.pdf | 31 May 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH_I_P 1.pdf | 31 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph I_P 1.pdf | 12 May 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph_I_P1.pdf | 10 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 1 _ P1.pdf | 17 Apr 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PH-I-part-1.pdf | 13 Apr 2021 |
| Certificates of CA (Form 3)File: Ph I _ P 1.pdf | 13 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 1 _ P 1.pdf | 11 Feb 2021 |
| Certificates of CA (Form 5)File: Ph 1 P 1.pdf | 8 Dec 2020 |
| OtherFile: Declaration.pdf | 1 Nov 2020 |
| Proforma of Allotment letterFile: Re revised agreement for sale - Navkar City Phase -I Part-1.pdf | 24 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Ph I AND II CC 14 FLR.pdf | 1 Oct 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Ph I AND II CC 14 FLR.pdf | 1 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ph 1_Part 1.pdf | 3 Sep 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ph 1 _Part 1.pdf | 29 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 19 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 1 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 24 Feb 2020 |
| Certificates of CA (Form 3)File: Ph 1 part 1.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 22 Feb 2020 |
| Certificates of CA (Form 3)File: ph 1 part 1.pdf | 22 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph I part 1.pdf | 28 Dec 2019 |
| Certificates of CA (Form 3)File: ph 1 part 1.pdf | 8 Jun 2019 |
| Certificates of CA (Form 5)File: ph 1 part 1.pdf | 6 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 30 Mar 2019 |
| Certificates of CA (Form 5)File: PH 1 PART 1.pdf | 30 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ph 1 part 1.pdf | 29 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PH 1 P 1.pdf | 25 Jul 2018 |
| Certificates of CA (Form 5)File: Phase 1 Part 1.pdf | 25 Jul 2018 |
| Proforma of Allotment letterFile: phase 1 part 1.pdf | 1 Apr 2018 |
| Proforma of Allotment letterFile: provisinol booking phase 1 part 1.pdf | 1 Apr 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Scaned_PDF part 1.pdf | 31 Mar 2018 |
| Certificates of CA (Form 5)File: part 1 compres.pdf | 31 Mar 2018 |
| OtherFile: Declaration Phase I- II.pdf | 31 Mar 2018 |
| Building plan approvalFile: phase 1 part 1 bwing reviesd plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: I C1 Gr to 7th flr plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: I C2 Gr to 7th flr plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: I B1 B2 Terrace Plan.pdf | 29 Jul 2017 |
| Building plan approvalFile: I-B1 B2 Gr to 7th flr plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Navkar City Phase I II Entire Layout NOC Plan for Environment 2.pdf | 29 Jul 2017 |
| Layout approvalFile: Navkar City Phase I II Entire Layout NOC Plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Navkar City PhaseI II Sanctioned Layout Plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Navkar city Phase IB Type bldg Revised Plan.pdf | 29 Jul 2017 |
| Layout approvalFile: Navkar City Phase I Sanctioned Layout Plan.pdf | 29 Jul 2017 |
| PAN CardFile: Navkar City PAN CARD.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate S No 332 H No 1.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Certificate S No 332 H No 3.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title certificate S no 332 H No 4.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Certificatete S No 332 H No 7.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Navkar phase I part 1 upload.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Navkar City Phase I Sanctioned Layout Plan.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Navkar City PhaseI II Sanctioned Layout Plan.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Navkar city Phase IB Type bldg Revised Plan.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Navkar City Phase I II Entire Layout NOC Plan for Environment 2.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Navkar City Phase I II Entire Layout NOC Plan.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: I-B1 B2 Gr to 7th flr plan.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: I C1 Gr to 7th flr plan.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: I C2 Gr to 7th flr plan.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
Keep NAVKAR CITY PHASE I PART 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near don bosco3,200+ in Palghar
Filed coordinates, straight-line distance. 63 registered projects within 2 km.
Suraksha Smart City - Phase I
Conceptual Advisory Services LLP
The Great Western Mumbai
HOABL Impactum Land Private Limited
Suraksha Smart City - Phase II
Conceptual Advisory Services LLP
Suraksha Smart City - Phase III
Conceptual Advisory Services LLP
Rashmi Star City Phase 2
Rashmi Realty Builders Pvt Ltd
Agarwal Sky Heights
Shreenath Realtors
See every Palghar project, with the district possession charts
Builder: Navkar Estate and Homes Pvt Ltd
Navkar Estate and Homes Pvt.Ltd. has 13 registrations on MahaRERA, including NAVKAR CITY Phase I part 3 and NAVKAR CITY PHASE I PART 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if NAVKAR CITY PHASE I PART 1 is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NAVKAR CITY PHASE I PART 1?
The registered promoter entity is Navkar Estate and Homes Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NAVKAR CITY PHASE I PART 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NAVKAR CITY PHASE I PART 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NAVKAR CITY PHASE I PART 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NAVKAR CITY PHASE I PART 1?
The professionals named in the filing: Architect: RAJESH R C; Engineer: CSE Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NAVKAR CITY PHASE I PART 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback