Registered No litigation declared Residential / Group Housing project

NASREEN AND HALLS VIEW APARTMENT

By GRACE RAJ REALTORS

RG-MH-62244 · RERA P51800034358 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 27 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
4 of 14Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

NASREEN AND HALLS VIEW APARTMENT is a Residential / Group Housing project by GRACE RAJ REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034358 on 4 Apr 2022. Possession is promised by 2 May 2027. The completion date has moved by 27 months from the original filing. 10 of the 14 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameNASREEN AND HALLS VIEW APARTMENT
  • TypeResidential / Group Housing
  • Location
    • NEW HALL ROAD
    • KURLA WEST
    • Kurla
    • Mumbai Suburban
    • 400070
  • Pincode400070
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034358
  • ReraGenie IDRG-MH-62244

Builder

  • NameGRACE RAJ REALTORS
  • Entity typePartnership
  • PartnersSHOAIB AHMAD ZIYAUDDIN SHAIKH, ZOHAIB AHMED ZIYAUDDIN SHAIKH, SUGHRA BI ZIYAUDDIN SHAIKH, SAJID AMIN MISTRY

Key dates

this monthRegisteredApr 2022First promiseFeb 2025Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2022
  • Promised completion2 May 2027
  • Revised completionRevised to 2 May 2027 (originally 25 Feb 2025)
  • Buildings1 building record
  • Documents filed69 files

Current status

71%10 of 14 units booked
98.0%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NASREEN AND HALLS APARTMENTNA7713114

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

NASREEN AND HALLS APARTMENT: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered1
Open Space16

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area872 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Mar 2026
LandownerVillageDistrict
NASREEN CO OPERATIVE HOUSING SOCIETY LTDKurlaMumbai Suburban
HALLS VIEW CO OPERATIVE HOUSING SOCIETY LIMITEDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI2510.0
Proposed, not sanctioned1,412 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI BANDRA BAITUL SHARAF 105 HILL ROAD
Estimated costRs 2.75 cr
Cost incurredRs 2.70 cr
Work done98.02%
BuildingWingEstimatedIncurred
NASREEN AND HALLS APARTMENTNARs 2.50 crRs 2.46 cr
-NARs 25.00 lakhRs 24.06 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHOAIB Z SHAIKH
ArchitectZiyauddin M Shaikh
EngineerZAHIRUDDIN M I SHAIKH
Chartered AccountantMOHAMMED AKRAM KHAN
PartnerRole in project
GRACE RAJ REALTORS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16122518707Feb 2025 → May 2026

Reason as filed by the promoterThe Promoter humbly submits to the authorities that the delay has been caused due to stagnation of finances as a result of aftermath of COVID-19. The entire construction industry was brought to a standstill due to the Lockdown of COVID-19. The Promoter suffered heavy losses financially and personally due to whic the said project got delayed. However, we have arranged for the finances and will be finishing the project at the earliest by 02.05.2026. Kindly grant us the Extension and oblige.

EA13052620951Feb 2025 → May 2027

Reason as filed by the promoterThe Promoter has revalidated the CC till 02/05/2027. The delay is due to Lockdown of COVID-19. The Promoter suffered heavy losses financially and personally due to whic the said project got delayed. Thus, the project being delayed resulted in financial and technical issues which has now been resolved and the Promoter will finish the project by the intended date of 02/05/2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 2 May 2027

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf13 May 2026
Withdrawal Update Form 2File: Form 2.pdf13 May 2026
Withdrawal Update Form 3File: Form 3.pdf13 May 2026
Withdrawal Update Form 1File: Form 1 Q1.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf25 Mar 2026
Withdrawal Update Form 1File: Form 1.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf25 Mar 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3 - Q1.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf25 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf25 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25.pdf28 Jan 2026
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2 Q1.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Form 1File: Form 1.pdf16 Dec 2025
Form 2File: Form 2.pdf16 Dec 2025
Form 3File: Form 3.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf16 Dec 2025
Declaration about Commencement CertificateFile: Format-D.pdf28 Mar 2022
Copy of the legal title reportFile: LEGAL TITTLE_compressed.pdf16 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: ilovepdf_merged.pdf16 Mar 2022
Building plan approvalFile: D1.pdf10 Mar 2022
Building plan approvalFile: D2.pdf10 Mar 2022
Building plan approvalFile: D3.pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: D1.pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: D2.pdf10 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: D3.pdf10 Mar 2022
Declaration in FORM BFile: sajidmistry.pdf10 Mar 2022
Declaration in FORM BFile: ShoaibShaikh.pdf10 Mar 2022
Declaration in FORM BFile: SughraBi.pdf10 Mar 2022
Declaration in FORM BFile: zohaibshaikh.pdf10 Mar 2022
Layout approvalFile: LayoutDeclaration.pdf25 Feb 2022
PAN CardFile: PAN.pdf25 Feb 2022
Details of encumbrancesFile: EncumberanceDeclaration.pdf25 Feb 2022
Copy of Layout Approval (in case of layout)File: LayoutDeclaration.pdf25 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate - Form 1 _ 24-02-2022.pdf25 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerCertificate.pdf25 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report_200231037158_For_Asset_Based_Search_24_02_2022_15_19_11_304.pdf25 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE GRACE.pdf25 Feb 2022
Proforma of Allotment letterFile: Agreement Format.pdf25 Feb 2022
Proforma of Allotment letterFile: Allotment Nasreen Draft.pdf25 Feb 2022

How this compares with Mumbai Suburban

71%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 27 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NASREEN AND HALLS VIEW APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA WEST6,700+ in Mumbai Suburban

2 kmNASREEN AND HALLS VIEW ACompleted 55Lapsed / revoked 58Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: GRACE RAJ REALTORS

GRACE RAJ REALTORS has 1 registration on MahaRERA, including NASREEN AND HALLS VIEW APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NASREEN AND HALLS VIEW APARTMENT is delayed beyond 2 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NASREEN AND HALLS VIEW APARTMENT?

The registered promoter entity is GRACE RAJ REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NASREEN AND HALLS VIEW APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NASREEN AND HALLS VIEW APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NASREEN AND HALLS VIEW APARTMENT?

The professionals named in the filing: Architect: SHOAIB Z SHAIKH; Architect: Ziyauddin M Shaikh; Engineer: ZAHIRUDDIN M I SHAIKH; Chartered Accountant: MOHAMMED AKRAM KHAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NASREEN AND HALLS VIEW APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NASREEN AND HALLS VIEW APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NASREEN AND HALLS VIEW APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.