Home / Browse projects / Nagpur, Maharashtra / NANIKS ASHTAVINAYAK UPPALS SHERATON

Registered No litigation declared Residential / Group Housing project

NANIKS ASHTAVINAYAK UPPALS SHERATON

By NANIK REALTIES LLP

RG-MH-13429 · RERA P50500048137 · Last updated on MahaRERA portal: 11 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken
  • Rs 14.00 crore secured on the land, in favour of State Bank Of India

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 10 months from the original
11 of 11Construction stages doneevery applicable stage filed complete
34 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

NANIKS ASHTAVINAYAK UPPALS SHERATON is a Residential / Group Housing project by NANIK REALTIES LLP in Nagpur, Maharashtra, registered with MahaRERA as P50500048137 on 12 Dec 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 10 months from the original filing. 30 of the 64 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameNANIKS ASHTAVINAYAK UPPALS SHERATON
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 30 CTS NO 2 MOUZA HANSAPURI
    • KADBI SQUARE
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500048137
  • ReraGenie IDRG-MH-13429

Builder

  • NameNANIK REALTIES LLP
  • Entity typePartnership
  • PartnersMAHESH NANIKRAM SADHWANI, GIRISH NANIKRAM SADHWANI, PRAVEEN INDER BALANY, PRAMOD KESHAVRAO WAIRAGADE, NANIK VENTURES LLP
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2022First promiseMay 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Dec 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed146 files

Current status

47%30 of 64 units booked
98.4%Work done, per cost certificate

Figures as on 11 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NANIKS ASHTAVINAYAK UPPAL SHERATONNA222064064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

NANIKS ASHTAVINAYAK UPPAL SHERATON: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes98%
Street LightingYes97%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes98%
Fire protection and fire safety requirementsYes96%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceYes98%
Open ParkingNoNot applicable

Parking filed161

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots161
Closed/Covered33
Open Space128

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,737 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofState Bank Of India
Secured amountRs 14.00 crore
CERSAI search filedYes
Declared on11 Jul 2026
LandownerVillageDistrict
JAGTAR SINGH UPPALNagpur (M Corp.)Nagpur
Nanik Realities LLPNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI19433.76
Proposed, not sanctioned9,717 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCA ROAD
Estimated costRs 38.45 cr
Cost incurredRs 37.85 cr
Work done98.44%
BuildingWingEstimatedIncurred
NANIKS ASHTAVINAYAK UPPAL SHERATONNARs 36.95 crRs 36.45 cr
-NARs 1.50 crRs 1.40 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSangit Ragit
EngineerPRAVEEN BALANY
Chartered AccountantSidharth Gupta
PartnerRole in project
NANIK REALTIES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13042620619May 2026 → Mar 2027

Reason as filed by the promoterWe would like to inform you that the project construction has been completed within the scheduled timeline, and all major and minor works have been successfully completed as of 31/05/ 2026.The project is presently in its final stage of statutory approvals. 3. Currently, we are in the process of obtaining the Fire NOC, which has already been applied for. As per the concerned department’s timeline, the issuance of the Fire NOC is expected to take approximately 2 to 3 months

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM AR 1 7 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 1File: FORM AR 1 7 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 1File: FORM AR 1 7 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 07 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 07 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 07 JULY 2026.pdf11 Jul 2026
Withdrawal Update Form 3File: FROM-3 Date 08-07-2026.pdf11 Jul 2026
Withdrawal Update Form 3File: FROM-3 Date 08-07-2026.pdf11 Jul 2026
Withdrawal Update Form 3File: FROM-3 Date 08-07-2026.pdf11 Jul 2026
Form 5 (FY 2022-2023)File: form 5 31 march 2023.pdf25 Apr 2026
Form 5 (FY 2024-2025)File: form 5 31 March 025.pdf22 Apr 2026
Form 5 (FY 2025-2026)File: form 5 31 March 026.pdf22 Apr 2026
Form 1File: FROM 1 aR 03 APRIL 024.pdf17 Apr 2026
Form 2File: FROM 2 30 MARCH 024.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD BOOKONG 02 APRIL 024.pdf17 Apr 2026
Form 3File: FROM 3 022.pdf17 Apr 2026
Form 1File: FROM 1 aR 03 APRIL 024.pdf17 Apr 2026
Form 2File: FORM 2 13 MAY 024.pdf17 Apr 2026
Form 3File: FROM 3 022.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD BOOKONG 02 APRIL 024.pdf17 Apr 2026
Form 3File: Form 3 Sherataton Oct 025.pdf17 Apr 2026
Form 1File: FORM 1 12 APRIL 025.pdf17 Apr 2026
Form 2File: FROM 2 ENGINN 10 APRIL 025.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING SOLD 15 APRIL 025.pdf17 Apr 2026
Form 1File: FROM 1 aR 03 APRIL 024.pdf17 Apr 2026
Form 2File: FORM 2 30 MARCH 024.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING SOLD 15 APRIL 025.pdf17 Apr 2026
Form 3File: Form 3 Sherataton Oct 025.pdf17 Apr 2026
Form 1File: FORM 1 12 APRIL 025.pdf17 Apr 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE SHERATON DATED 10 APRIL 2025.pdf17 Apr 2026
Form 3File: Form 3 Nanik Realities LLP 13 Dec 024_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING DETAILS 15 APRIL 025.pdf17 Apr 2026
Form 1File: Form 1 Annexure A AR Certificate SHERATON.pdf17 Apr 2026
Form 2File: FROM 2 13 DEC 024.pdf17 Apr 2026
Form 3File: FORM 3 kadbi 23 Oct 025.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING DETAILS 15 APRIL 025.pdf17 Apr 2026
Form 1File: FORM 1 12 APRIL 025.pdf17 Apr 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE SHERATON DATED 10 APRIL 2025.pdf17 Apr 2026
Form 3File: CA FORM 3 NEW (1).pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING DETAILS 15 APRIL 025.pdf17 Apr 2026
Form 1File: form 1A Ar Sheraton.pdf17 Apr 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE SHERATON DATED 10 APRIL 2025.pdf17 Apr 2026
Form 3File: CA FORM 3 NEW (1).pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING DETAILS 15 APRIL 025.pdf17 Apr 2026
Form 1File: FORM 1 12 APRIL 025.pdf17 Apr 2026
Form 2File: FORM 2 ENGINEER CERTIFICATE SHERATON DATED 10 APRIL 2025.pdf17 Apr 2026
Form 3File: Form 3 Nanik Realities LLP 13 Dec 024_compressed.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING DETAILS 15 APRIL 025.pdf17 Apr 2026
Form 1File: FROM 1 aR 03 APRIL 024.pdf17 Apr 2026
Form 3File: FROM 3 022.pdf17 Apr 2026
Form 2File: FROM 2 30 MARCH 024.pdf17 Apr 2026
Disclosure of Sold and Booked InventoryFile: BOOKING SOLD 15 APRIL 025.pdf17 Apr 2026
Form 5 (FY 2023-2024)File: Annexure F_Form 5.pdf17 Apr 2026
Withdrawal Update Form 1File: FORM 1 AR 07 APRIL 026.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 8 APRIL 026 ENGIN.pdf15 Apr 2026
Withdrawal Update Form 3File: Form3_RERA_Sheraton_090426_compressed.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM 1 AR 07 APRIL 026.pdf13 Apr 2026
Withdrawal Update Form 2File: FORM 2 8 APRIL 026 ENGIN.pdf13 Apr 2026
Withdrawal Update Form 3File: Form3_RERA_Sheraton_090426_compressed.pdf13 Apr 2026
Withdrawal Update Form 1File: FORM 1 AR 07 APRIL 026.pdf9 Apr 2026
Withdrawal Update Form 1File: FORM 1 AR 07 APRIL 026.pdf9 Apr 2026
Withdrawal Update Form 1File: FORM 1 AR 07 APRIL 026.pdf9 Apr 2026
Withdrawal Update Form 2File: FORM 2 8 APRIL 026 ENGIN.pdf9 Apr 2026
Withdrawal Update Form 2File: FORM 2 8 APRIL 026 ENGIN.pdf9 Apr 2026
Withdrawal Update Form 2File: FORM 2 8 APRIL 026 ENGIN.pdf9 Apr 2026
Withdrawal Update Form 3File: Form3_RERA_Sheraton_090426_compressed.pdf9 Apr 2026
Withdrawal Update Form 3File: Form3_RERA_Sheraton_090426_compressed.pdf9 Apr 2026
Withdrawal Update Form 3File: Form3_RERA_Sheraton_090426_compressed.pdf9 Apr 2026
Form 2A (FY 2024-2025)File: FROM 2 A 31 MARCH 025.pdf7 Apr 2026
Form 2A (FY 2022-2023)File: FORM 2 A 31 MARCH 023.pdf6 Apr 2026
Form 2A (FY 2025-2026)File: from 2 a 31 march 2026.pdf6 Apr 2026
Form 2A (FY 2023-2024)File: FORM 2 A 31 03 2024.pdf6 Apr 2026
Withdrawal Update Form 1File: Sheration Form 1 Ar C 05 jan 2026.pdf3 Apr 2026
Withdrawal Update Form 2File: SHERATON FORM 2 ENGINEERS CERTIFICATE 05 JAN 2026.pdf3 Apr 2026
Withdrawal Update Form 3File: form 3 Uppals Sheraton 02 feb 2026.pdf3 Apr 2026
Withdrawal Update Form 1File: Sheration Form 1 Ar C 05 jan 2026.pdf2 Feb 2026
Withdrawal Update Form 1File: Sheration Form 1 Ar C 05 jan 2026.pdf2 Feb 2026
Withdrawal Update Form 2File: SHERATON FORM 2 ENGINEERS CERTIFICATE 05 JAN 2026.pdf2 Feb 2026
Withdrawal Update Form 2File: SHERATON FORM 2 ENGINEERS CERTIFICATE 05 JAN 2026.pdf2 Feb 2026
Withdrawal Update Form 3File: form 3 Uppals Sheraton 02 feb 2026.pdf2 Feb 2026

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
NANIKS ASHTAVINAYAK LUXURIAP50500031986MOUZA JARIPATJA, Nagpur33Dec 2021OngoingMar 2025Not delivered

How this compares with Nagpur

47%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 10 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANIKS ASHTAVINAYAK UPPALS SHERATON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KADBI SQUARE2,800+ in Nagpur

2 kmNANIKS ASHTAVINAYAK UPPACompleted 16Lapsed / revoked 5Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 47 registered projects within 2 km.

Builder: NANIK REALTIES LLP

NANIK REALTIES LLP has 2 registrations on MahaRERA, including NANIKS ASHTAVINAYAK UPPALS SHERATON and Naniks Ashtavinayak The Capitol -IT BUILDING. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if NANIKS ASHTAVINAYAK UPPALS SHERATON is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANIKS ASHTAVINAYAK UPPALS SHERATON?

The registered promoter entity is NANIK REALTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANIKS ASHTAVINAYAK UPPALS SHERATON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANIKS ASHTAVINAYAK UPPALS SHERATON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANIKS ASHTAVINAYAK UPPALS SHERATON?

The professionals named in the filing: Architect: Sangit Ragit; Engineer: PRAVEEN BALANY; Chartered Accountant: Sidharth Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANIKS ASHTAVINAYAK UPPALS SHERATON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANIKS ASHTAVINAYAK UPPALS SHERATON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANIKS ASHTAVINAYAK UPPALS SHERATON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.