Home / Browse projects / Nagpur, Maharashtra / NANIKS ASHTAVINAYAK LUXURIA

Registration lapsed No litigation declared Residential / Group Housing project

NANIKS ASHTAVINAYAK LUXURIA

By S N INFRASTRUCTURES

RG-MH-03803 · RERA P50500031986 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 19 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2025Possession promised19 months past this date
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
20 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

NANIKS ASHTAVINAYAK LUXURIA is a Residential / Group Housing project by S N INFRASTRUCTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500031986 on 3 Dec 2021. Possession was promised by 31 Mar 2025 and is now 19 months past that date. 13 of the 33 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameNANIKS ASHTAVINAYAK LUXURIA
  • TypeResidential / Group Housing
  • Location
    • CHITNAVIS NAGAR BYRAMJI TOWN
    • MOUZA JARIPATJA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440013
  • Pincode440013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500031986
  • ReraGenie IDRG-MH-03803

Builder

  • NameS N INFRASTRUCTURES
  • Entity typePartnership
  • PartnersMAHESH SADHWANI, GIRISH SADHWANI, BHAWANA SADHWANI, NANIK VENTURES LLP

Key dates

19 months past promisethis monthRegisteredDec 2021PromisedMar 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 Dec 2021
  • Promised completion31 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

39%13 of 33 units booked
96.4%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NANIKS ASHTAVINAYAK LUXURIANA222033033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

NANIKS ASHTAVINAYAK LUXURIA: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.92%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.88%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes55%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes78%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes90%
Open ParkingNoNot applicable

Parking filed164

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots164
Closed/Covered53
Open Space111

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,146 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Municipal Corporation
Permissible FSI7724.41
Proposed, not sanctioned7,724 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALPANA NAGAR POWER GRID COLONY NAGPUR
Estimated costRs 25.89 cr
Cost incurredRs 24.97 cr
Work done96.43%
BuildingWingEstimatedIncurred
NANIKS ASHTAVINAYAK LUXURIANARs 24.89 crRs 24.00 cr
-NARs 1.00 crRs 97.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN EDGE ARCHITECTS
ArchitectSpaceBar Atelier
EngineerP S PATANKAR
EngineerPraveen Balany
Chartered AccountantSidharth Gupta
PartnerRole in project
S N INFRASTRUCTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2021-2022)File: Form 2A Luxuria.pdf25 Apr 2026
Form 2A (FY 2022-2023)File: form 2 A Luxuria 023.pdf25 Apr 2026
Form 2A (FY 2023-2024)File: form 2 A Luxuria 024.pdf25 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 22 AUG.pdf25 Aug 2025
Form 1File: FORM 1 04 APRIL 025.pdf25 Aug 2025
Form 2File: FORM 2 SN 25 MARCH 025.pdf25 Aug 2025
Form 3File: FORM 3 SN 25 MARCH 025.pdf25 Aug 2025
Form 2A (FY 2024-2025)File: from 2 a 22 aug 025.pdf25 Aug 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY ASSAURANCE CERTIFICATE LUXURIA DATED 16 APRIL 2025.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LUXURIA FORM 1 30 SEP 2023.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM 1 sn 2 april 024.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 04 APRIL 025.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SN 25 MARCH 025.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CERTIFICATE JUNE 024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 SN DEC 024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SN 31 MARCH 024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 3 SN 25 MARCH 025.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SN 25 MARCH 025.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 S N INFRASTRUCTURE LUXURIA JULY 024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: LUXURIA BOOKING DETAILS FOR RERA DATED 26 FEB 025.pdf26 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LUXURIA QUALITY ASSAURANCE CERTIFICATE DATED 26 FEB 025.pdf26 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured unsecured finance.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf16 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: formation of home buyer.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER.pdf26 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4L.pdf24 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Luxuria_2023-05-30_164358 (2)_compressed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Luxuria_2023-05-30_164358 (2)_compressed.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICATE LUXURIA.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE LUXURIA DATED 30-05-2023.pdf30 May 2023
Disclosure of sold/ booked inventoryFile: booked inventory luxuria.pdf29 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT (LUXURIA).pdf22 Apr 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT LETTER.pdf22 Apr 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION COPY OF AGREEMENT_compressed.pdf22 Apr 2023
Other - LegalFile: GetUserDocumentFileContent (1).pdf22 Apr 2023
Other - FinanceFile: GetUserDocumentFileContent (1).pdf22 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANEXURE.pdf21 Apr 2023
Proforma of Agreement for saleFile: GetUserDocumentFileContent.pdf21 Apr 2023
PAN CardFile: PAN CARD SN.pdf12 Apr 2023
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf4 Apr 2023
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf4 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate_310822.pdf19 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enggs Certificate_cost.pdf19 Sep 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY LUXURIA RERA.pdf19 Sep 2022
CERSAI detailsFile: Undertaking for CERSAI.pdf29 Nov 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Nov 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER PROFORMA.pdf29 Nov 2021
Copy of the legal title reportFile: Annexure_compressed.pdf22 Nov 2021
Copy of the legal title reportFile: Title Search_compressed.pdf22 Nov 2021
Declaration about Commencement CertificateFile: DECLARATION of COMMENCEMENT.pdf20 Nov 2021
Layout approvalFile: LAYOUT DECLARATION.pdf9 Nov 2021
Details of encumbrancesFile: ENCUMBRANCES.pdf9 Nov 2021
Copy of Layout Approval (in case of layout)File: LAYOUT DECLARATION.pdf9 Nov 2021
Declaration in FORM BFile: FORM B.pdf9 Nov 2021
Proforma of Allotment letterFile: Luxuria Agreement to Sale.pdf9 Nov 2021
Building plan approvalFile: scan381 (600-850)_compressed-compressed.pdf3 Nov 2021
Building plan approvalFile: scan382 (600-900)-compressed (1) (1).pdf3 Nov 2021
Building plan approvalFile: scan383 (600-850).pdf3 Nov 2021
Building plan approvalFile: scan385 (600-1100).pdf3 Nov 2021
Copy of the legal title reportFile: Title Search Cicular No 28.pdf3 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: scan381 (600-850)_compressed-compressed.pdf3 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: scan382 (600-900)-compressed (1) (1).pdf3 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: scan383 (600-850).pdf3 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: scan385 (600-1100).pdf3 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate 002.pdf3 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Comncement download.pdf1 Nov 2021

How this compares with Nagpur

39%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NANIKS ASHTAVINAYAK LUXURIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOUZA JARIPATJA2,800+ in Nagpur

2 kmNANIKS ASHTAVINAYAK LUXUCompleted 13Lapsed / revoked 6Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: S N INFRASTRUCTURES

S N INFRASTRUCTURES has 1 registration on MahaRERA, including NANIKS ASHTAVINAYAK LUXURIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that NANIKS ASHTAVINAYAK LUXURIA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if NANIKS ASHTAVINAYAK LUXURIA is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NANIKS ASHTAVINAYAK LUXURIA?

The registered promoter entity is S N INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NANIKS ASHTAVINAYAK LUXURIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NANIKS ASHTAVINAYAK LUXURIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NANIKS ASHTAVINAYAK LUXURIA?

The professionals named in the filing: Architect: DESIGN EDGE ARCHITECTS; Architect: SpaceBar Atelier; Engineer: P S PATANKAR; Engineer: Praveen Balany; Chartered Accountant: Sidharth Gupta. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANIKS ASHTAVINAYAK LUXURIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANIKS ASHTAVINAYAK LUXURIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANIKS ASHTAVINAYAK LUXURIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.