Home / Browse projects / Palghar, Maharashtra / NAKSHATRA NIRVAANA II

Registered No litigation declared Residential / Group Housing project

NAKSHATRA NIRVAANA II

By JSB HOMEMAKERS PRIVATE LIMITED

RG-MH-23219 · RERA P99000078297 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 44.80 crore secured on the land, in favour of Aditya Birla Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 6 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 80%
32 of 343Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

NAKSHATRA NIRVAANA II is a Residential / Group Housing project by JSB HOMEMAKERS PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000078297 on 4 Dec 2024. Possession is promised by 30 Jun 2027. 311 of the 343 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameNAKSHATRA NIRVAANA II
  • TypeResidential / Group Housing
  • Location
    • JUCHANDRA VILLAGE
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000078297
  • ReraGenie IDRG-MH-23219

Builder

  • NameJSB HOMEMAKERS PRIVATE LIMITED
  • Entity typeCompany
  • Other registrations6 more →
  • Completed1 of 7
  • Declared earlier projects11 →

Key dates

this monthRegisteredDec 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed72 files

Current status

91%311 of 343 units booked
55.9%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA23212280228
BUILDING NO 2 WING BNA21201150115
BUILDING NO 2 WING A HOSPITAL BUILDINGNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 80%.

BUILDING NO 165%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
BUILDING NO 2 WING B54%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
BUILDING NO 2 WING A HOSPITAL BUILDING66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Closed/Covered3
Open Space213
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 11135136
BUILDING NO 2 WING B17879
BUILDING NO 2 WING A HOSPITAL BUILDING101

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,850 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Limited
Secured amountRs 44.80 crore
CERSAI search filedYes
Declared on30 Aug 2025

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI18553.64
Proposed, not sanctioned18,554 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.5-5A,KRISHNA REGENCY,SUNDER NAGAR,NEAR.DALMIA COLLEGE, MALAD WEST
Estimated costRs 68.00 cr
Cost incurredRs 38.00 cr
Work done55.88%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 41.00 crRs 23.00 cr
BUILDING NO 2 WING BNARs 19.00 crRs 11.00 cr
BUILDING NO 2 WING A HOSPITAL BUILDINGNARs 5.00 crRs 4.00 cr
-NARs 3.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGHA URBANSCAPES
EngineerDeepak Kumar Singh
Chartered AccountantParthkumar Dhirajlal Patel
Chartered AccountantPranav Patel & Associates
Chartered AccountantK.B. MISTRY & ASSOCIATES
PartnerRole in project
JSB HOMEMAKERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Nirvaana II Form 1.pdf29 Apr 2026
Withdrawal Update Form 2File: Form 2 Nirvaana II.pdf29 Apr 2026
Withdrawal Update Form 3File: FORM-3_Nakshatra_Nirvaana_II.pdf29 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf4 Mar 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf4 Mar 2026
Withdrawal Update Form 3File: Nirvaana II Form 3 Dec 25.pdf4 Mar 2026
Withdrawal Update Form 1File: Nakshatra Nirvaana II Sept 25.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2_Nakshatra Nirvaana II_Deepak Kumar Singh.pdf18 Nov 2025
Withdrawal Update Form 3File: Form3 Sept 25 NIRVANA-II.pdf18 Nov 2025
Withdrawal Update Form 1File: Form 1 Nakshatra Nirvaana II.pdf10 Nov 2025
Withdrawal Update Form 2File: Form 2_Nakshatra Nirvaana II-Jun 25.pdf10 Nov 2025
Withdrawal Update Form 3File: form 3 nakshatra nirvaana II June25.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 Nakshatra Nirvaana II.pdf11 Oct 2025
Form 1File: Form 1 Nakshatra Nirvaana II.pdf11 Aug 2025
Form 2File: Form 2_Nakshatra Nirvaana II-Jun 25.pdf11 Aug 2025
Form 3File: form 3 nakshatra nirvaana II June25.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Nakshatra Nirvaana II Sales MIS_Jun 25.pdf11 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 nakshatra nirvaana II.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nirvaana II_c.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Nakshatra Nirvaana II.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Nakshatra Nirvaana II Sales MIS_mar 25.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Nirvaana II-March-25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Artitechture Certificate Nakshatra Nirvana II.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Nakshatra Nirvaana II Dec 24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Nakshatra Nirvaana II.pdf12 Feb 2025
Disclosure of sold/ booked inventoryFile: Nakshatra Nirvaana II Sales MIS_Dec 24.pdf12 Feb 2025
Details of encumbrances concerned to FinanceFile: Nirvaana II Encumbrances concerned to Mortgage-Aditya Birla Finance Limited.pdf27 Jan 2025
Details of encumbrances concerned to LegalFile: Nirvaana II Encumbrances concerned to Mortgage-Aditya Birla Finance Limited.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 2024 FORM 1 Nirvaana -2.pdf23 Jan 2025
Copy of the legal title reportFile: Nirvaana II Title Search New.pdf26 Nov 2024
Other - LegalFile: 10418-2024 Jsb Homemakers Pvt Ltd Mhatre Power.pdf21 Nov 2024
Other - LegalFile: 10417-2024 Jsb Homemakers Pvt Ltd Mhatre Conveyance.pdf21 Nov 2024
Other - LegalFile: VSI4-17976-2024 Bhoir Conveyance.pdf21 Nov 2024
Other - LegalFile: VSI4-17977-2024 Bhoir Power.pdf21 Nov 2024
Other - LegalFile: NIRVAANA 7-12.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Mortgage New.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nakshatra Nirvaana II Oct 24 New.pdf19 Nov 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Mortgage New.pdf19 Nov 2024
Other - TechnicalFile: OrderNo50of2024.pdf19 Nov 2024
Proforma of Allotment letterFile: NIRVAANA II RERA ALLOTMENT NEW.pdf18 Nov 2024
Other - LegalFile: NIRVAANA II CC VERIFICATION MAIL.pdf18 Nov 2024
Proforma of Agreement for saleFile: NIRVAANA II AFS NEW.pdf18 Nov 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Mortgage.pdf15 Nov 2024
CERSAI detailsFile: Declaration regarding Cersai Report151124.pdf15 Nov 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Mortgage.pdf15 Nov 2024
Other - FinanceFile: OrderNo50of2024.pdf15 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Nirvaana II Bank Confirmation Letter 151124.pdf14 Nov 2024
Building plan approvalFile: Sheet 5 Niravaana II_11zon.pdf30 Oct 2024
Building plan approvalFile: Sheet 4 Niravaana II_11zon.pdf30 Oct 2024
Building plan approvalFile: Sheet 3 Niravaana II_11zon.pdf30 Oct 2024
Building plan approvalFile: Sheet 2 Niravaana II_11zon.pdf30 Oct 2024
Layout approvalFile: Sheet 1 Niravaana II_11zon.pdf30 Oct 2024
PAN CardFile: JSB Home Makers PAN Card.pdf30 Oct 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to legal.pdf30 Oct 2024
Copy of Layout Approval (in case of layout)File: Sheet 1 Niravaana II_11zon.pdf30 Oct 2024
Declaration in FORM BFile: Form B-JSB Homemakers Pvt Ltd-Nakshatra Nirvaana II.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Nakshatra Nirvaana 2_11zon.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Nakshatra Nirvaana II_Deepak Kumar Singh.pdf30 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Nirvaana II CC_11zon.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2 Niravaana II_11zon.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 3 Niravaana II_11zon.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 4 Niravaana II_11zon.pdf30 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sheet 5 Niravaana II_11zon.pdf30 Oct 2024
Declaration about Commencement CertificateFile: Nakshatra Nirvaana II-Declaration about Commencement Certificate11-10-2024.pdf30 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Annexure A new.pdf30 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter - No Deviation.pdf30 Oct 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to legal.pdf30 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement - No Deviation.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Divyesh Seksaria.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Sunil Seksaria.pdf30 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A-Jitendra Kumar Ranka.pdf30 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured-unsecured finance.pdf30 Oct 2024

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Nakshatra VedaSurvey No. 73340OngoingDec 2027Dec 2027
NAKSHATRA PRITHVISurvey Nos 49 & 56242OngoingDec 2027Dec 2027
GOKUL NAKSHATRASURVEY NO 334 VILLAGE BOLINJ TALUKA VASAI DIST PALGHAR379OngoingDec 2027Dec 2027
Nakshatra Veda IISurvey No. 73514OngoingDec 2026Dec 2026
Nakshatra AazsthaSurvey No 81 Hissa No 1 2 5 8 & 181,105OngoingDec 2026Dec 2026
Sai Nakshatra TrridentSurvey No. 212 Hissa No 1247CompletedDec 2024May 2024

How this compares with Palghar

91%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NAKSHATRA NIRVAANA II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

2 kmNAKSHATRA NIRVAANA IICompleted 25Lapsed / revoked 7Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: JSB HOMEMAKERS PRIVATE LIMITED

JSB Homemakers Private Limited has 7 registrations on MahaRERA, including Sai Nakshatra Trrident and Nakshatra Aazstha. Its filings disclose 11 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if NAKSHATRA NIRVAANA II is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NAKSHATRA NIRVAANA II?

The registered promoter entity is JSB HOMEMAKERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NAKSHATRA NIRVAANA II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NAKSHATRA NIRVAANA II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NAKSHATRA NIRVAANA II?

The professionals named in the filing: Architect: MEGHA URBANSCAPES; Engineer: Deepak Kumar Singh; Chartered Accountant: Parthkumar Dhirajlal Patel; Chartered Accountant: Pranav Patel & Associates; Chartered Accountant: K.B. MISTRY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NAKSHATRA NIRVAANA II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NAKSHATRA NIRVAANA II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NAKSHATRA NIRVAANA II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.