Home / Browse projects / Pune, Maharashtra / Nakshatra

Completed No litigation declared Residential / Group Housing project

Nakshatra

By ANGAL & CO

RG-MH-67178 · RERA P52100019074 · Last updated on MahaRERA portal: 2 Mar 2023

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Nakshatra is a Residential / Group Housing project by ANGAL & CO in Pune, Maharashtra, registered with MahaRERA as P52100019074 on 28 Dec 2018. The registration is recorded completed; possession was promised by 10 Sep 2024. 5 complaints are on record with the regulator.

At a glance

Project

  • NameNakshatra
  • TypeResidential / Group Housing
  • Location
    • Off Pashan Road
    • Nimhan Mala
    • Pashan
    • Haveli
    • Pune
    • 411021
  • Pincode411021
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019074
  • ReraGenie IDRG-MH-67178

Builder

  • NameANGAL & CO
  • Entity typePartnership
  • PartnersSOHAN DILIP ANGAL, DILIP SUBHASH ANGAL, SONIA VIKRAM OGALE
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects8 →

Key dates

this monthRegisteredDec 2018PromisedSep 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Dec 2018
  • Promised completion10 Sep 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NakshatraNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Nakshatra: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 2 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Security Access ControlYes100%

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered65
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,112 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5957.18
Proposed, not sanctioned5,886 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFP No 241/1 Bhandarkar Road Deccan Gymkhana Pune-4

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSudhir Godbole
EngineerSatish Marathe
Chartered AccountantKaushik C Gandhi
PartnerRole in project
ANGAL & CO-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000096145Dilip Subhash AngalSarita Nilesh Nimhan20/10/2021
CC005000000096146Dilip Subhash AngalRenu Bharati20/10/2021
CC005000000096147Dilip Subhash AngalSeema Sanjay Bharati20/10/2021
CC005000000290253Shivaji Namdeo GameDilip Subhash Angal05/02/2024
CC12400090Abhishek Arun PandeANGAL & CO13/09/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Dec 2022

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Nakshatra Form5 20-21.pdf2 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy Certificate.pdf5 Dec 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Nakshatra.pdf5 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2022.pdf18 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Occupancy Certificate.pdf18 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - 08092022.pdf10 Sep 2022
Building plan approvalFile: Nakshatra PMC.pdf8 Aug 2022
Building plan approvalFile: Nakshatra PMC 1.pdf8 Aug 2022
Building plan approvalFile: Nakshatra PMC 2-3.pdf8 Aug 2022
Building plan approvalFile: Nakshatra PMC 4-5.pdf8 Aug 2022
Building plan approvalFile: Nakshatra PMC 6-7.pdf8 Aug 2022
Building plan approvalFile: Nakshatra PMC 8.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC 1.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC 2-3.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC 4-5.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC 6-7.pdf8 Aug 2022
Building Plan Approval (IOD)File: Nakshatra PMC 8.pdf8 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 16-02-2022.pdf8 Aug 2022
Certificates of CA (Form 3)File: Nakshatra Form 3 (31Jan22).pdf13 Apr 2022
Certificates of CA (Form 3)File: CA Report 14Mar2022.pdf11 Apr 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold inventory-17 Feb 22.pdf22 Feb 2022
Form 2AFile: Nakshatra - Form 2A - Jan 22.pdf13 Jan 2022
Form 2AFile: Nakshatra - Form 2A - Oct 21.pdf22 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Nakshatra - Deed Of Declaration.pdf22 Dec 2021
Form 2AFile: Naksahtra - Form 2A - Jan 21.pdf13 Jul 2021
Form 2AFile: Nakshatra - Form 2A - Apr 21.pdf13 Jul 2021
Form 2AFile: Nakshatra - Form 2A - Jul 21.pdf13 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Nakshastra (Reduced).pdf24 May 2021
Building plan approvalFile: Nakshatra Revised PMC 1 Reduced.pdf11 Nov 2020
Building plan approvalFile: Nakshatra Revised PMC 2 Reduced.pdf11 Nov 2020
Building Plan Approval (IOD)File: Nakshatra Revised PMC 1 Reduced.pdf11 Nov 2020
Building Plan Approval (IOD)File: Nakshatra Revised PMC 2 Reduced.pdf11 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Nakshatra Revised CC Reduced.pdf11 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Nakshatra - Form 5 (2020).pdf6 Nov 2020
Form 2AFile: Nakshatra - Form 2A - Oct 20.pdf23 Oct 2020
Details of Restarting of Construction work post lockdownFile: Details of Restarting.pdf3 Jul 2020
Form 2AFile: Nakshatra - Form 2A - Apr 20.pdf2 Jul 2020
Form 2AFile: Nakshatra - Form 2A - Jul 20.pdf2 Jul 2020
Form 2AFile: Nakshatra - Form 2A - Jan 20.pdf22 Jan 2020
Form 2AFile: Nakshatra - Form 2A - Oct '19.pdf19 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Nakshatra Form 5 (2019).pdf30 Sep 2019
Form 2AFile: Nakshatra - Form 2A (Jul '19).pdf3 Jul 2019
Form 2AFile: Nakshatra - Form 2A.pdf10 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nakshatra - Form 1 (Architect's Certificate).pdf9 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nakshatra - Form 2.pdf9 Apr 2019
Proforma of Allotment letterFile: Nakshatra Agreement (RERA) - Final.pdf2 Jan 2019
Certificates of CA (Form 3)File: Form 3 Nakshatra.pdf19 Dec 2018
Layout approvalFile: Nakshatra PMC 0102.pdf17 Dec 2018
Building plan approvalFile: Nakshatra PMC 030405.pdf17 Dec 2018
Copy of the legal title reportFile: Title Opinion Nakshatra - 2.pdf17 Dec 2018
Details of encumbrancesFile: Declaration of No Encumbrance.pdf17 Dec 2018
Copy of Layout Approval (in case of layout)File: Nakshatra PMC 0102.pdf17 Dec 2018
Building Plan Approval (IOD)File: Nakshatra PMC 030405.pdf17 Dec 2018
Declaration in FORM BFile: Form B (Nakshatra).pdf17 Dec 2018
Proforma of Allotment letterFile: Flat Allotment Letter.pdf17 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: Nakshatra CC 01.pdf10 Dec 2018

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NakshatraS No 5 by 81 plus 82 Pashan90CompletedSep 2024Nov 2022
IreneFP No 116 117 121by6 Lane No 13 Prabhat Road9CompletedDec 2020Oct 2019
RatnaPadmaCTS No 301 FP No 63 Shilavihar Colony Erandvane11CompletedJun 2018Feb 2018
TATHASTUOFF LANE NO 14 PRABHAT ROAD ERANDWANE PUNE 41100411CompletedDec 2016Oct 2016
ADORABEHIND MITCON COLLEGE BALEWADI PUNE 41104517CompletedDec 2015Late, Jun 2016
SHAKUNTALModel Colony Shivajinagar Pune 4110166CompletedJun 2014Late, Sep 2014
FLORENZAHARE KRISHNA MANDIR ROAD MODEL COLONY SHIVAJINAGAR PUNE 41101610CompletedDec 2013Nov 2013
BOUGAN VILASBEHIND MITCON COLLEGE BALEWADI PUNE 4110452CompletedJun 2013Mar 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nakshatra on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nimhan Mala13,700+ in Pune

2 kmNakshatraCompleted 44Lapsed / revoked 14Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 151 registered projects within 2 km.

Builder: ANGAL & CO

ANGAL & CO has 5 registrations on MahaRERA, including RATNAPADMA and Irene. Its filings disclose 8 earlier MahaRERA projects: declares 6 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Nakshatra is delayed beyond 10 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nakshatra?

The registered promoter entity is ANGAL & CO, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nakshatra?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nakshatra?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nakshatra?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nakshatra?

The professionals named in the filing: Architect: Sudhir Godbole; Engineer: Satish Marathe; Chartered Accountant: Kaushik C Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nakshatra?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nakshatra. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nakshatra to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.