ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Nakshatra Aarambh

Completed No litigation declared Residential / Group Housing project

Nakshatra Aarambh

By JSB Shelters LLP

RG-MH-29039 · RERA P99000027563 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 0%
13 of 264Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Nakshatra Aarambh is a Residential / Group Housing project by JSB Shelters LLP in Palghar, Maharashtra, registered with MahaRERA as P99000027563 on 16 Dec 2020. The registration is recorded completed; possession was promised by 15 Sep 2026. The completion date has moved by 15 months from the original filing. 251 of the 264 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameNakshatra Aarambh
  • TypeResidential / Group Housing
  • Location
    • Naigaon East
    • Vasai
    • Tivari
    • Palghar
    • 401208
  • Pincode401208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000027563
  • ReraGenie IDRG-MH-29039

Builder

  • NameJSB Shelters LLP
  • Entity typePartnership
  • GSTIN27AAPFJ1375A1ZG
  • PartnersDivyesh Sunil Seksaria, Sunil Devkinandan Seksaria, Jitendra Kumar Pukhraj Ranka, Hemant Anant Patil

Key dates

this monthRegisteredDec 2020First promiseJun 2025Revised toSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Dec 2020
  • Promised completion15 Sep 2026
  • Revised completionRevised to 15 Sep 2026 (originally 30 Jun 2025)
  • Buildings2 building records
  • Documents filed140 files

Current status

95%251 of 264 units booked
94.6%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
8ANA24231320132
8BNA24231320132

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.

8A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
8B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed264

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots264
Closed/Covered18
Open Space246
BuildingClosed/CoveredOpen SpaceTotal
8A9123132
8B9123132

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,000 sq m
Land owned byNot the promoter
Named landowners4
LandownerVillageDistrict
Sunita Sunil MhatreVasai-Virar City (M Corp)Palghar
Pranali Sunil MhatreVasai-Virar City (M Corp)Palghar
Saurabh Sunil MahtreVasai-Virar City (M Corp)Palghar
Anandibai Gajanan BhoirVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI9763.94
Proposed, not sanctioned9,764 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGoregaon West
Estimated costRs 44.40 cr
Cost incurredRs 42.00 cr
Work done94.59%
BuildingWingEstimatedIncurred
8ANARs 20.00 crRs 19.00 cr
8BNARs 20.00 crRs 19.00 cr
-NARs 4.40 crRs 4.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjay Wade & Associate
EngineerDeepak Kumar Singh
Chartered AccountantRitesh G Sharma & Co.
Chartered AccountantPARTH PATEL
PartnerRole in project
JSB Shelters LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19052621021Jun 2025 → Sep 2026

Reason as filed by the promoterThe delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 09/04/2025 and we have also initiated the process for the possession as well. In view of this as the said project obtained full OC uploading consents from allottees will not be required. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring timely execution, and addressing any issues that may arise. This proactive approach aims to ensure a

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601113Namita JarandeJSB Shelters LLP01/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2025

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC.pdf16 Jul 2026
Occupational CertificateFile: Declaration of Full OC.pdf16 Jul 2026
Occupational CertificateFile: Commencement Certificate (31-08-2019).pdf16 Jul 2026
Occupational CertificateFile: Commencement Certificate (31-12-2021).pdf16 Jul 2026
Occupational CertificateFile: Commencement Certificate (10-10-2024).pdf16 Jul 2026
Occupational CertificateFile: Nakshatra Aarambh - CC Plan-1.pdf16 Jul 2026
Occupational CertificateFile: Nakshatra Aarambh - CC Plan-2-3.pdf16 Jul 2026
Occupational CertificateFile: Nakshatra Aarambh - CC Plan-4.pdf16 Jul 2026
Occupational CertificateFile: Plans as on 10-10-24_compressed.pdf16 Jul 2026
Occupational CertificateFile: OC Verification Mail Screenshot.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025 - 2026.pdf11 Jul 2026
Layout approvalFile: Plan 1 - Wing 8A - FSI and Parking Details - Highlighted.pdf29 Jun 2026
Building plan approvalFile: Plan 2 - Wing 8A.pdf29 Jun 2026
Building plan approvalFile: Plan 1 - Wing 8B - FSI and Parking Details - Highlighted.pdf29 Jun 2026
Building plan approvalFile: Plan 2 - Wing 8B.pdf29 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A_FY_2021-22.pdf16 Jun 2026
Form 2A (FY 2021-2022)File: Form 2A_FY_2021-22.pdf16 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A_FY_2022-23.pdf16 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A_FY_2023-24.pdf16 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A_FY_2023-24.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf18 May 2026
Withdrawal Update Form 2File: Form 2.pdf18 May 2026
Withdrawal Update Form 3File: Form 3.pdf18 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 FORM 3 NAKSHATRA AARAMBH.pdf3 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aarambh.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nakshatra Aarambh Form 2 March 25.pdf22 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Aarambh OC.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1Final Form 3Nakshatra Aarambh.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nakshatra Aarambh Form 2 Dec 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf21 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Shelters LLP 23-24.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nakshatra Aarambh Sept 24.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nakshatra Aarambh Form 2 Sept 24.pdf21 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Nakshatra Aarambh Jun 2024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Jun 2024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory-Jun 24.pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Nakshatra Aarambh 2A.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Nakshatra Aarmbh.pdf21 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Apr 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Mortgage-SHFL Top.pdf29 Mar 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Mortgage-SHFL Top.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31122023.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarambh Form 2.pdf31 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Dec 2023-.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarambh Form 3 Dec 2023.pdf31 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 JSB Shelters LLP 22-23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JSB ShelterLLP Nakshatra Aarambh Form 3 Sept 23.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Nakshatra Aarambh Form 2 Sept 23.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: Nakshatra Aarambh Sales MIS June 2022.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Nakshatra Aarambh Sales MIS Dec 2022.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Nakshatra Aarambh Sales MIS March 23.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Nakshatra Aarambh Sales MIS Feb 23-.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold June 23.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold Sept 2023.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30092023.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 22.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-June 23.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Aarambh_30-09-21.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Aarambh_31-12-21.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-30-06-2022.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_30-09-2022.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_31-12-2022.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_31-03-2023.pdf14 Oct 2023

How this compares with Palghar

95%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 15 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nakshatra Aarambh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai3,200+ in Palghar

2 kmNakshatra AarambhCompleted 23Lapsed / revoked 11Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: JSB Shelters LLP

JSB Shelters LLP has 1 registration on MahaRERA, including Nakshatra Aarambh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Nakshatra Aarambh is delayed beyond 15 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nakshatra Aarambh?

The registered promoter entity is JSB Shelters LLP, a partnership as per the filing. Its GSTIN 27AAPFJ1375A1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nakshatra Aarambh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nakshatra Aarambh?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Nakshatra Aarambh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nakshatra Aarambh?

The professionals named in the filing: Architect: Ajay Wade & Associate; Engineer: Deepak Kumar Singh; Chartered Accountant: Ritesh G Sharma & Co.; Chartered Accountant: PARTH PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nakshatra Aarambh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nakshatra Aarambh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nakshatra Aarambh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.