ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Winterberry Tower and Plaza

Registered No litigation declared Others project

Winterberry Tower and Plaza

By NAHAR BUILDERS LTD.

RG-MH-57012 · RERA P51800047208 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
6 of 10Construction stages donefurthest along: Internal walls, 95%
40 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 155 documents Report an error

Winterberry Tower and Plaza is a Others project by NAHAR BUILDERS LTD. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047208 on 12 Oct 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 2 of the 42 units on this registration are recorded sold or booked, and 6 of 10 construction stages are filed complete.

At a glance

Project

  • NameWinterberry Tower and Plaza
  • TypeOthers
  • Location
    • RAHEJA VIHAR CIRCULAR ROAD CHANDIVALI
    • NAHAR AMRIT SHAKTI
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047208
  • ReraGenie IDRG-MH-57012

Builder

  • NameNAHAR BUILDERS LTD.
  • Entity typeCompany
  • Managing DirectorSUKHRAJ BABULALJI NAHAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects13 →

Key dates

this monthRegisteredOct 2022First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Oct 2022
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed155 files

Current status

5%2 of 42 units booked
81.3%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Winterberry Tower and Plaza1139301242

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 10 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Winterberry Tower and Plaza · wing 1: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo75%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered105

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,735 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Dec 2025
LandownerVillageDistrict
Sukhraj B Nahar CA to Owner Jatin Manubhai Sheth-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5137.16
Proposed, not sanctioned5,128 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD 36 VALLABH APTS 87 BHULABHAI DESAI ROAD MUMBAI MAHARASHTRA 400026
Estimated costRs 42.00 cr
Cost incurredRs 34.13 cr
Work done81.27%
BuildingWingEstimatedIncurred
Winterberry Tower and Plaza1Rs 42.00 crRs 34.13 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAVINDRA GORDHANDAS KAPADIA
ArchitectHAFEEZ CONTRACTORS
ArchitectANIMISH SAVANT
EngineerVINAY GAJANAN MUKADAM
EngineerDevendra Pimpalgaonkar
Chartered AccountantTushar D Udani
Chartered AccountantSuresh Vasudev Kamath
Chartered AccountantSHAILESH SALVI AND COMPANY
PartnerRole in project
NAHAR BUILDERS LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21032620327Mar 2026 → Mar 2027

Reason as filed by the promoterThe delay has occurred primarily due to the following reasons: 1. Change in Building Plan and receiving revised building plan approvals: The project delay under RERA was caused by revisions to the building plans and construction layout to improve design and meet updated technical requirements. This required resubmitting plans and obtaining approvals (received on 24/04/2024), which took time beyond the developer’s control. The resulting changes in construction planning and sequencing further extended the project timeline. 2. Slow Sales (only 2 units have been sold): The project faced delays due

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed155

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Further CC R5A_Feb 26.pdf20 Jul 2026
Withdrawal Update Form 1File: RERA Form 1 Jun 26_Architect Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 1File: RERA Form 1 Jun 26_Architect Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 2File: RERA Form 2 Jun 26_Engr Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 2File: RERA Form 2 Jun 26_Engr Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 Jun 26_CA Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 3File: RERA Form 3 Jun 26_CA Cert_Winerberry_R5A.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Arc Cer Winterberry update Jan to Mar 26.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Eng Cer Winterberry update Jan to Mar 26.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 CA Cer Winterberry update Jan to Mar 26.pdf17 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A Engineer Certificate Quality Assurance Winterbery 2023 24.pdf9 Apr 2026
Form 5 (FY 2023-2024)File: Form 5 Annual Report Statement of Accounts 2023-2024_Winterberry.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Cert Upto Oct to Dec 2025.pdf3 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Cert Upto Oct to Dec 2025.pdf3 Apr 2026
Withdrawal Update Form 3File: R Form 3 CA cert Sector R5A Dec 2025.pdf3 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A Engineer Certificate Quality Assurance Winterbery 2025 26.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 Arch Cert Upto Oct to Dec 2025.pdf21 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Cert Upto Oct to Dec 2025.pdf21 Mar 2026
Withdrawal Update Form 3File: R Form 3 CA cert Sector R5A Dec 2025.pdf21 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A Quality cer 2024-25.pdf7 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 Annual 2024 25.pdf7 Feb 2026
Commencement certificateFile: 2444172_FurtherCC_signed R5A.pdf25 Dec 2025
Withdrawal Update Form 1File: Form 1 Arch Cert Upto Jul to Sept 2025.pdf25 Dec 2025
Withdrawal Update Form 2File: Eng Cer Winterberry update Apr-May-Jun 25.pdf25 Dec 2025
Withdrawal Update Form 3File: Form 3 CA Cert Upto Jul to Sept 2025.pdf25 Dec 2025
Form 1File: Winterberry Architect Certificate Upto Dec-22.pdf24 Dec 2025
Form 2File: Winterberry Engineer Certificate Upto Dec-22.pdf24 Dec 2025
Form 3File: From-3_CA Certificate_Winterberry_Upto Dec-22.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: From-3_CA Certificate_Winterberry_Upto Dec-22.pdf24 Dec 2025
Form 1File: R-5A_Form-1_ Architect Certificate_ upto Mar-2023.pdf24 Dec 2025
Form 2File: R-5A_Form-2_ Engineer Certificate_ upto Mar-2023.pdf24 Dec 2025
Form 3File: R-5A_Form-3_ CA Certificate_ upto Mar-2023.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: R-5A_Form-3_ CA Certificate_ upto Mar-2023.pdf24 Dec 2025
OthersFile: R-5A_Form-2A_ Quality Engineer Certificate_ upto Mar-2023.pdf24 Dec 2025
Form 1File: Arc Cer R5A upto Jun 23.pdf24 Dec 2025
Form 2File: Eng Cer R5A upto Jun 23.pdf24 Dec 2025
Form 3File: CA Cer R5A upto Jun 23_c.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: CA Cer R5A upto Jun 23_c.pdf24 Dec 2025
Form 1File: R-5A Arc Certificate Oct to Dec 23.pdf24 Dec 2025
Form 2File: R-5A Engineer Certificate Oct to Dec 23.pdf24 Dec 2025
Form 3File: R-5A CA Certificate Oct to Dec 23.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: R-5A CA Certificate Oct to Dec 23.pdf24 Dec 2025
Form 1File: R-5 Arc Certificate Jan to Mar 24.pdf24 Dec 2025
Form 2File: R-5 Engineer Certificate Jan to Mar 24.pdf24 Dec 2025
Form 3File: R-5 CA Certificate Jan to Mar 24 C.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: R-5 CA Certificate Jan to Mar 24 C.pdf24 Dec 2025
OthersFile: R-5 Quality Engineer Certificate 2023-2024.pdf24 Dec 2025
Form 1File: Arc certificate R-5A (Apr-Jun 2024).pdf24 Dec 2025
Form 2File: Engineer certificate R-5A (Apr-Jun 2024).pdf24 Dec 2025
Form 3File: CA certificate R-5A (Apr-Jun 2024).pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: CA certificate R-5A (Apr-Jun 2024).pdf24 Dec 2025
Form 1File: Arc Certificate R-5A (Jul-Sept 2024).pdf24 Dec 2025
Form 2File: Engineer Certificate R-5A (Jul-Sept 2024).pdf24 Dec 2025
Form 3File: CA Certificate R-5A (Jul-Sept 2024).pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: CA Certificate R-5A (Jul-Sept 2024).pdf24 Dec 2025
Form 1File: Arc certificate R-5A (Oct to Dec 2024).pdf24 Dec 2025
Form 2File: Engineer certificate R-5A (Oct to Dec 2024).pdf24 Dec 2025
Form 3File: CA certificate R-5A (Oct to Dec 2024).pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: CA certificate R-5A (Oct to Dec 2024).pdf24 Dec 2025
Form 1File: R-5A Arc Certificate Jan to Mar 25.pdf24 Dec 2025
Form 2File: R-5A Engineer Certificate Jan to Mar 25.pdf24 Dec 2025
Form 3File: R-5A CA Certificate Jan to Mar 25.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: R-5A CA Certificate Jan to Mar 25.pdf24 Dec 2025
Form 1File: R-5A Arc Certificate Jul to Sep 23.pdf24 Dec 2025
Form 2File: R-5A Engineer Certificate Jul to Sep 23.pdf24 Dec 2025
Form 3File: R-5A CA Certificate Jul to Sep 23.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: R-5A CA Certificate Jul to Sep 23.pdf24 Dec 2025
Withdrawal Update Form 1File: Arc Cer Winterberry update Apr-May-Jun 25.pdf24 Dec 2025
Withdrawal Update Form 2File: Eng Cer Winterberry update Apr-May-Jun 25.pdf24 Dec 2025
Withdrawal Update Form 3File: CA Cer Winterberry update Apr-May-Jun 25.pdf24 Dec 2025
Building plan approvalFile: Amendletter_signed (1).pdf18 Apr 2025
Building plan approvalFile: Win1 (2).pdf18 Apr 2025
Building plan approvalFile: Win22.pdf18 Apr 2025
Building plan approvalFile: Win33.pdf18 Apr 2025
Building plan approvalFile: Win44.pdf18 Apr 2025
Building plan approvalFile: Win55.pdf18 Apr 2025
Building plan approvalFile: Win66.pdf18 Apr 2025
Building plan approvalFile: Win77.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R-5A Arc Certificate Jan to Mar 25.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R-5A CA Certificate Jan to Mar 25.pdf18 Apr 2025

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
AMARYLLIS TOWERS AND PLAZANahar Amrit Shakti Village Chandivali Mumbai 400072422OngoingDec 2025Dec 2025
R-20 Nahar Business CenterNahar Amrit Shakti Village Chandivali Mumbai 40007236CompletedJan 2015Jan 2015
R-18 White Lily and Water LilyNahar Amrit Shakti Village Chandivali Mumbai 400072144CompletedDec 2014Late, Jul 2016
R-12/7 and 8 Barberny-BryonyNahar Amrit Shakti Village Chandivali Mumbai 400072159CompletedDec 2014Late, Aug 2015
R-12,10 LAUREL-LILACNahar Amrit Shakti Village Chandivali Mumbai 400072178CompletedJun 2013Late, Feb 2014

How this compares with Mumbai Suburban

5%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Winterberry Tower and Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAHAR AMRIT SHAKTI6,700+ in Mumbai Suburban

2 kmWinterberry Tower and PlCompleted 61Lapsed / revoked 28Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 127 registered projects within 2 km.

Builder: NAHAR BUILDERS LTD.

NAHAR BUILDERS LTD has 4 registrations on MahaRERA, including Nahar Cayenne and OLIVIA. Its filings disclose 13 earlier MahaRERA projects: declares 5 of 13 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Winterberry Tower and Plaza is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Winterberry Tower and Plaza?

The registered promoter entity is NAHAR BUILDERS LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Winterberry Tower and Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Winterberry Tower and Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Winterberry Tower and Plaza?

The professionals named in the filing: Architect: RAVINDRA GORDHANDAS KAPADIA; Architect: HAFEEZ CONTRACTORS; Architect: ANIMISH SAVANT; Engineer: VINAY GAJANAN MUKADAM; Engineer: Devendra Pimpalgaonkar; Chartered Accountant: Tushar D Udani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Winterberry Tower and Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Winterberry Tower and Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Winterberry Tower and Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.