Home / Browse projects / Mumbai Suburban, Maharashtra / OLIVIA

Completed No litigation declared Others project

OLIVIA

By NAHAR BUILDERS LTD

RG-MH-21110 · RERA P51800003168 · Last updated on MahaRERA portal: 2 Feb 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 205 documents Report an error

OLIVIA is a Others project by NAHAR BUILDERS LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800003168 on 4 Aug 2017. The registration is recorded completed; possession was promised by 25 Dec 2022.

At a glance

Project

  • NameOLIVIA
  • TypeOthers
  • Location
    • Chandivali Farm Road
    • Chandivali
    • Kurla
    • Mumbai Suburban
    • 400072
  • Pincode400072
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800003168
  • ReraGenie IDRG-MH-21110

Builder

  • NameNAHAR BUILDERS LTD
  • Entity typeCompany
  • Managing DirectorSUKHRAJ BABULAL NAHAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects13 →

Key dates

this monthRegisteredAug 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion25 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed205 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OLIVIANA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

OLIVIA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10005.39
Proposed, not sanctioned10,005 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchWORLI SANDOZ HOUSE, DR ANNIE BESENT ROAD, MUMBAI 400 018

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShri R G Kapadia
EngineerJ+W Consultant
Chartered AccountantUDANI MEHTA & CO.
PartnerRole in project
NAHAR BUILDERS LTD-

Litigation declared1

CaseCourtStatus
104 OF 2016/2016National Green Tribunal Western Zone Bench PuneEnvironment Clearance is granted by SEIAA on Twenty Fifth September Two Thousand Nineteen EC Encl

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Oct 2022

Documents filed205

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 205 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: OLIVIA CHS LTD_SOCIETY CERTIFICATE.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Olivia Occupation Certificate.pdf28 Oct 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Architect Certificate_Olivia.pdf28 Oct 2022
OtherFile: Olivia Part OC_Part-1_for Residential_01-04-2022.pdf30 Sep 2022
OtherFile: Olivia Full OC letter for Residentail 27-7-2022.pdf28 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Architect Certificate_Olivia_upto June-22.pdf3 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Engineer Certificate_Olivia_upto June-22.pdf3 Aug 2022
Form 2AFile: Form 2-A _Engineer's Certificate_Quality Assurrance_Olivia RERA_Upto June - 2022.pdf3 Aug 2022
Certificates of CA (Form 3)File: Form-3_CA Certificate_Olivia _Upto June-22.pdf3 Aug 2022
OtherFile: EC granted_25092019.pdf7 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Architect Certificate_Olivia_upto Mar-22.pdf8 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Engineer Certificate_Olivia_upto Mar-22.pdf8 Jun 2022
Form 2AFile: Form 2-A _Engineer's Certificate_Quality Assurrance_Olivia RERA_Upto Mar - 2022.pdf8 Jun 2022
Certificates of CA (Form 3)File: Form-3_CA Certificate_Olivia _Upto Mar-22.pdf8 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Olivia Architect Certificate upto Dec-21.pdf23 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Olivia Engineer Certificate upto Dec-21.pdf23 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Olivia Quality Engineer Certificate upto Dec-21.pdf23 Feb 2022
Certificates of CA (Form 3)File: Olivia CA Certificate upto Dec-21.pdf23 Feb 2022
Building plan approvalFile: 04.pdf10 Dec 2021
Building plan approvalFile: 05.pdf10 Dec 2021
Building plan approvalFile: 06.pdf10 Dec 2021
Building plan approvalFile: 07.pdf10 Dec 2021
Building plan approvalFile: 08.pdf10 Dec 2021
Building plan approvalFile: 09.pdf10 Dec 2021
Building plan approvalFile: 10.pdf10 Dec 2021
Building plan approvalFile: 11.pdf10 Dec 2021
Building plan approvalFile: Approved Amedned Plans letter 07-12-2021.pdf10 Dec 2021
Building plan approvalFile: 01.pdf10 Dec 2021
Building plan approvalFile: 02.pdf10 Dec 2021
Building plan approvalFile: 03.pdf10 Dec 2021
Building Plan Approval (IOD)File: Approved Amedned Plans letter 07-12-2021.pdf10 Dec 2021
Building Plan Approval (IOD)File: 01.pdf10 Dec 2021
Building Plan Approval (IOD)File: 02.pdf10 Dec 2021
Building Plan Approval (IOD)File: 03.pdf10 Dec 2021
Building Plan Approval (IOD)File: 04.pdf10 Dec 2021
Building Plan Approval (IOD)File: 05.pdf10 Dec 2021
Building Plan Approval (IOD)File: 06.pdf10 Dec 2021
Building Plan Approval (IOD)File: 07.pdf10 Dec 2021
Building Plan Approval (IOD)File: 08.pdf10 Dec 2021
Building Plan Approval (IOD)File: 09.pdf10 Dec 2021
Building Plan Approval (IOD)File: 10.pdf10 Dec 2021
Building Plan Approval (IOD)File: 11.pdf10 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Olivia Architect Certificate upto Sept-21.pdf4 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Olivia Engineer Certificate upto Sept-21.pdf4 Nov 2021
Form 2AFile: Olivia Quality Engineer Certificate upto Sept-21.pdf4 Nov 2021
Certificates of CA (Form 3)File: Olivia CA Certificate upto Sept-21.pdf4 Nov 2021
OtherFile: extract1.pdf5 Oct 2021
OtherFile: extract2.pdf5 Oct 2021
OtherFile: extract3.pdf5 Oct 2021
Certificates of CA (Form 5)File: Form - 5 Annual Report Statement of Accounts 2017-2018.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form - 5 Annual Report Statement of Accounts 2018-2019.pdf15 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory Olivia 31-08-21.pdf14 Sep 2021
OtherFile: 1_Reg Agreement Flat No P01-P02-101-102-201.pdf14 Sep 2021
OtherFile: 2_Reg Agreement Flat No 202, 203, 205, 301, 302.pdf14 Sep 2021
OtherFile: 3_Reg Agreement Flat No 304, 401, 402, 403, 404.pdf14 Sep 2021
OtherFile: 4_Reg Agreement Flat No 405, 501, 502, 505, 506.pdf14 Sep 2021
OtherFile: 5_Reg Agreement Flat No 601, 602, 603, 604, 605.pdf14 Sep 2021
OtherFile: 6_Reg Agreement Flat No 701, 803, 804, 901, 902.pdf14 Sep 2021
OtherFile: 7_Reg Agreement Flat No 903, 904, 905.pdf14 Sep 2021
Building plan approvalFile: Amended plans letter_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 2-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 3-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 4-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 5-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 6-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 7-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 8-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 9-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 10-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: Dwg 11-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: 1-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building plan approvalFile: 1-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: 1-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: 1-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Amended plans letter_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Dwg 2-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Dwg 3-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Dwg 4-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Dwg 5-11 Approved Drawing_09-09-2021.pdf13 Sep 2021
Building Plan Approval (IOD)File: Dwg 6-11 Approved Drawing_09-09-2021.pdf13 Sep 2021

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise7 delivered late
ProjectLocationFlatsStatusPromisedDelivered
R-12,10 LAUREL-LILACNahar Amrit Shakti Village Chandivali Mumbai 400072178CompletedNov 2020Late, Feb 2021
R-3 Rosa AlbaNahar Amrit Shakti Village Chandivali Mumbai 40007268CompletedJan 2015Jan 2015
R-20 Nahar Business CenterNahar Amrit Shakti Village Chandivali Mumbai 40007236CompletedJan 2015Jan 2015
R-18 White Lily and Water LilyNahar Amrit Shakti Village Chandivali Mumbai 400072144CompletedDec 2014Late, Apr 2016
R-12/7 and 8 Barberny-BryonyNahar Amrit Shakti Village Chandivali Mumbai 400072159CompletedDec 2014Late, Aug 2015
R 12 /11, YVONNENahar Amrit Shakti Village Chandivali Mumbai 400072108CompletedDec 2014Late, Aug 2015
R-12,10 LAUREL-LILACNahar Amrit Shakti Village Chandivali Mumbai 400072178CompletedJun 2013Late, Feb 2014
R 12/9 Jonquille-JamaicaNahar Amrit Shakti Village Chandivali Mumbai 400072178CompletedJun 2013Late, Feb 2014
R-20 Nahar Business CenterNahar Amrit Shakti Village Chandivali Mumbai 40007236CompletedJan 2005Late, Jan 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OLIVIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chandivali6,700+ in Mumbai Suburban

2 kmOLIVIACompleted 56Lapsed / revoked 40Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: NAHAR BUILDERS LTD

NAHAR BUILDERS LTD has 4 registrations on MahaRERA, including Nahar Cayenne and OLIVIA. Its filings disclose 13 earlier MahaRERA projects: declares 5 of 13 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if OLIVIA is delayed beyond 25 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OLIVIA?

The registered promoter entity is NAHAR BUILDERS LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OLIVIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OLIVIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OLIVIA?

The professionals named in the filing: Architect: Shri R G Kapadia; Engineer: J+W Consultant; Chartered Accountant: UDANI MEHTA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OLIVIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OLIVIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OLIVIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.