N G Platinum City Phase V
RG-MH-32380 · RERA PR1241012500997 · Last updated on MahaRERA portal: 30 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
N G Platinum City Phase V is a Residential / Group Housing project by J M G REALTORS PVT LTD in Palghar, Maharashtra, registered with MahaRERA as PR1241012500997 on 29 Sep 2025. Possession is promised by 1 Mar 2030. 33 of the 152 units on this registration are recorded sold or booked, and 15 of 45 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameN G Platinum City Phase V
- TypeResidential / Group Housing
- Location
- D P Road
- Achole
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1241012500997
- ReraGenie IDRG-MH-32380
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Sep 2025
- Promised completion1 Mar 2030
- Revised completionNone
- Buildings5 building records
- Documents filed14 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Type HF 2 (52) | NA | 8 | 8 | 31 | 0 | 31 |
| Type HF 2 (53) | NA | 8 | 8 | 31 | 0 | 31 |
| Type HH (54) | NA | 8 | 8 | 30 | 0 | 30 |
| Type HH (55) | NA | 8 | 8 | 30 | 0 | 30 |
| Type HH (56) | NA | 8 | 8 | 30 | 0 | 30 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 45 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 96%.
Type HF 2 (52)76%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 87% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 55% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
Type HF 2 (53)57%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 65% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 65% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 35% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Type HH (54)46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 45% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Type HH (55)44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 45% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Type HH (56)44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 45% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 20% |
| Water Supply | No | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 20% |
| Storm Water Drains | No | 30% |
| Landscaping & Tree Planting | No | 60% |
| Street Lighting | No | 60% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | 5% |
| Electrical meter room, sub-station, receiving station | No | 5% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Total |
|---|---|---|
| Type HF 2 (52) | 20 | 20 |
| Type HF 2 (53) | 20 | 20 |
| Type HH (54) | 20 | 20 |
| Type HH (55) | 20 | 20 |
| Type HH (56) | 20 | 20 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Rakeshkumar Wadhawan | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Type HF 2 (52) | NA | Rs 4.33 cr | Rs 2.38 cr |
| Type HF 2 (53) | NA | Rs 4.33 cr | Rs 2.38 cr |
| Type HH (54) | NA | Rs 4.33 cr | Rs 2.38 cr |
| Type HH (55) | NA | Rs 4.33 cr | Rs 2.38 cr |
| Type HH (56) | NA | Rs 4.33 cr | Rs 2.38 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shah Gattani Consultants |
| Engineer | Divin Sivarajan |
| Chartered Accountant | Vaibhav Nagda |
| Partner | Role in project |
|---|---|
| J M G REALTORS PVT LTD | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600273 | Bhakti Achrekar | J M G REALTORS PVT LTD | 22/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jun 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 May 2025 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Mar 2030
Documents filed14
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 phase 5 March 2026.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 phase 5 March 2026.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Withdrawal Application NG Phase V Form3 Q4.pdf | 30 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 December 2025.pdf | 14 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 December 2025.pdf | 14 Apr 2026 |
| Withdrawal Update Form 3File: form 3 pahse 5 dec.pdf | 14 Apr 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 AS ON SEPTEMBER 2025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 AS ON SEPTEMBER 2025.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 AS ON SEPTEMBER 2025.pdf | 27 Oct 2025 |
| Declaration and undertaking (Annexure A)File: Order 50 Final.pdf | 12 Jun 2025 |
| Layout approvalFile: Final Layout to be uploaded_11zon.pdf | 12 Jun 2025 |
| Building plan approvalFile: CLUSTER D - 1_11zon.pdf | 21 May 2025 |
| Building plan approvalFile: CLUSTER D - 2_11zon.pdf | 21 May 2025 |
| Building plan approvalFile: CLUSTER D - 3_11zon.pdf | 21 May 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| N G Platinum CityP99000024280 | Achole, Palghar | 167 | Feb 2020 | Ongoing | Dec 2024 | Not delivered |
| N G SHREE RAM VAN PHASE IP99000000747 | ., Palghar | - | Jul 2017 | Ongoing | Dec 2020Registered original: Dec 2019 | Not delivered |
| N G SHREE RAM VAN PHASE IIP99000016813 | VASAI EAST, Palghar | - | Jun 2018 | Ongoing | Sep 2020 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 14 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep N G Platinum City Phase V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Achole3,200+ in Palghar
Filed coordinates, straight-line distance. 216 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
AV CRYSTAL PRESTIGE
RELIABLE HOUSING INDIA PRIVATE LIMITED
ARMAAN LOTUS
MANGAL ARJUN VARATHA
Redevelopement of Sagar Prakash Hsg Co-op Soc
TRIMURTI CONSTRUCTION
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
See every Palghar project, with the district possession charts
Builder: J M G REALTORS PVT LTD
J M G REALTORS PVT LTD has 5 registrations on MahaRERA, including N G SHREE RAM VAN PHASE I and N G SHREE RAM VAN PHASE II. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if N G Platinum City Phase V is delayed beyond 1 Mar 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of N G Platinum City Phase V?
The registered promoter entity is J M G REALTORS PVT LTD, a company as per the filing. Its CIN U70100MH1996PTC100890 and GSTIN 27AABCJ0589K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in N G Platinum City Phase V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against N G Platinum City Phase V?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for N G Platinum City Phase V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at N G Platinum City Phase V?
The professionals named in the filing: Architect: Shah Gattani Consultants; Engineer: Divin Sivarajan; Chartered Accountant: Vaibhav Nagda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in N G Platinum City Phase V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback