Home / Browse projects / Palghar, Maharashtra / N G SHREE RAM VAN PHASE I

Completed No litigation declared Residential / Group Housing project

N G SHREE RAM VAN PHASE I

By J M G REALTORS PVT LTD

RG-MH-08531 · RERA P99000000747 · Last updated on MahaRERA portal: 7 Feb 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
7 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

N G SHREE RAM VAN PHASE I is a Residential / Group Housing project by J M G REALTORS PVT LTD in Palghar, Maharashtra, registered with MahaRERA as P99000000747 on 23 Jul 2017. The registration is recorded completed; possession was promised by 14 Dec 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameN G SHREE RAM VAN PHASE I
  • TypeResidential / Group Housing
  • Location
    • .
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 413001
  • Pincode413001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000000747
  • ReraGenie IDRG-MH-08531

Builder

  • NameJ M G REALTORS PVT LTD
  • Entity typeCompany
  • CINU70100MH1996PTC100890
  • GSTIN27AABCJ0589K1ZP
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • ChairpersonNARINDERPAL ROSHANLAL GUPTA
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion14 Dec 2020
  • Revised completionRevised to 14 Dec 2020 (originally 15 Dec 2019)
  • Buildings2 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
N G SHREE RAM VAN HA42NA90000
N G SHREE RAM VAN HC43NA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 90%.

N G SHREE RAM VAN HA4283%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
N G SHREE RAM VAN HC4381%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 7 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
N G SHREE RAM VAN HA4211
N G SHREE RAM VAN HC4311

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,032 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI43708.24
Proposed, not sanctioned4,228 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBOTAWALA CHAMBERS MUMBAI 400 001

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAH GATTANI CONSULTANTS DIVYESH SHAH
PartnerRole in project
J M G REALTORS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000006383Dec 2019 → Dec 2020

Reason as filed by the promoterWe JMG Realtors Pvt Ltd, had completed our project NG Shree Ram Van Phase I within the proposed time as dated while registering. We have provided possession of flats to the allottees for interior decoration work from April 2017 and only 3 flats are unsold now. We have uploaded acknowledgement of O.C. application to VVCMC dated 03.08.2017 please allow us extented date for completion of rest work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Sep 2021

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: FORM 3 N G SHREERAM VAN PHASE I - 2017 - 2018_compressed (1).pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 N G SHREERAM VAN PHASE I - 2018 - 2019_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 N G SHREERAM VAN PHASE I - 2019 - 2020_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3N G SHREERAM VAN PHASE I - 2020 -2021_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - April 21 to June 21_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - july 21-Sep 21_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - Oct 2021 to Dec 2021_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - Jan 21 to March 22_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - April 22 to June 22_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - July 22 to Sept 2022_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - April 22 to June 22_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - July 22 to Sept 2022_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - Oct 2022 to Dec 2022_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - Jan 22 to March 23_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - April 23 to June 23_compressed.pdf7 Feb 2024
Certificates of CA (Form 3)File: FORM 3 - N G Shreeram Van Phase I - July 23 to Sept 23_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 ANNUAL REPORT - 2017 - 2018_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 ANNUAL REPORT - 2018 - 2019_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 ANNUAL REPORT - 2019 - 2020_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 ANNUAL REPORT - 2020 - 2021_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ANNEXURE F - FORM 5 - 2021 - 2022_compressed.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ANNEXURE F - FORM 5 - 2022 - 2023_compressed.pdf7 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: N G Shreeram Van 42 43 Society Reg Certificate.pdf29 Nov 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC N G SHREE RAM VAN PHASE I .pdf22 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: jmg phase 1 completion.pdf14 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf20 Jul 2017
Layout approvalFile: 4 APPROVED LAYOUT PLAN.pdf23 Jun 2017
Building plan approvalFile: 12 IOD WITH COMMENCEMENT.pdf23 Jun 2017
Building plan approvalFile: 12 IOD WITH COMMENCEMENT.pdf23 Jun 2017
PAN CardFile: 1 PAN CARD.pdf23 Jun 2017
Copy of the legal title reportFile: 2 TITLE CERTIFICATE .pdf23 Jun 2017
Details of encumbrancesFile: 3 ENCUMBRANCE CERTIFICATE.pdf23 Jun 2017
Copy of Layout Approval (in case of layout)File: 4 APPROVED LAYOUT PLAN.pdf23 Jun 2017
Building Plan Approval (IOD)File: 12 IOD WITH COMMENCEMENT.pdf23 Jun 2017
Building Plan Approval (IOD)File: 12 IOD WITH COMMENCEMENT.pdf23 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: 12 COMMENCEMENT CERTIFICATE.pdf23 Jun 2017
Declaration in FORM BFile: 6 FORM B DECLARATION.pdf23 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 ENGINEER CERTIFICATE.pdf23 Jun 2017
Certificates of CA (Form 3)File: 9 CA CERTIFICATE.pdf23 Jun 2017
Proforma of Allotment letterFile: 5 PROFORMA ALLOTTMENT LETTER AND AGREEMENT FOR SALE.pdf23 Jun 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
N G Platinum CityP99000024280Achole, Palghar167Feb 2020OngoingDec 2024Not delivered
N G SHREE RAM VAN PHASE IIP99000016813VASAI EAST, Palghar-Jun 2018OngoingSep 2020Not delivered

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep N G SHREE RAM VAN PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .3,200+ in Palghar

2 kmN G SHREE RAM VAN PHASE Completed 34Lapsed / revoked 17Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: J M G REALTORS PVT LTD

J M G REALTORS PVT LTD has 5 registrations on MahaRERA, including N G SHREE RAM VAN PHASE I and N G SHREE RAM VAN PHASE II. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if N G SHREE RAM VAN PHASE I is delayed beyond 14 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of N G SHREE RAM VAN PHASE I?

The registered promoter entity is J M G REALTORS PVT LTD, a company as per the filing. Its CIN U70100MH1996PTC100890 and GSTIN 27AABCJ0589K1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in N G SHREE RAM VAN PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for N G SHREE RAM VAN PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at N G SHREE RAM VAN PHASE I?

The professionals named in the filing: Architect: SHAH GATTANI CONSULTANTS DIVYESH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in N G SHREE RAM VAN PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About N G SHREE RAM VAN PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save N G SHREE RAM VAN PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.