AV CRYSTAL PRESTIGE
By RELIABLE HOUSING INDIA PRIVATE LIMITED
RG-MH-52218 · RERA P99000012675 · Last updated on MahaRERA portal: 17 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
- Completion date moved by 52 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AV CRYSTAL PRESTIGE is a Others project by RELIABLE HOUSING INDIA PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000012675 on 7 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 52 months from the original filing. 304 of the 591 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameAV CRYSTAL PRESTIGE
- TypeOthers
- Location
- ACHOLE RD CHANDAN NAKA
- NALLASOPARA EAST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000012675
- ReraGenie IDRG-MH-52218
Builder
- NameRELIABLE HOUSING INDIA PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorSALIM AHMED ALI SAYYED
- DirectorsIBRAHIM SAIFUDDIN KAPADIA, AMIT VINODANAND MISHRA
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Sep 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 26 Aug 2023)
- Buildings3 building records
- Documents filed115 files
Current status
Figures as on 17 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 28 | 28 | 180 | 44 | 224 |
| B WING | NA | 28 | 28 | 232 | 0 | 232 |
| C - Wing | NA | 24 | 24 | 135 | 0 | 135 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
A WING44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 18% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 55% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 18% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C - Wing46%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 12% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 22% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BINDIA BHATT SANAT MEHTA AND ASSOCIATES |
| Engineer | MUKESH KUMAR |
| Engineer | Rajesh Kumar Shrivastava |
| Chartered Accountant | S LAKDAWALA & ASSOCIATES |
| Chartered Accountant | PRATIK VORA |
| Chartered Accountant | MAA & COMPANY |
| Partner | Role in project |
|---|---|
| RELIABLE HOUSING INDIA PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterKey Director aliasgar bhanpurwala murdered in 2017 and hence project stopped and now we have obtained full commencement certificate dated 4th August 2022 and we have merely sold 60 units out of 464 units which is only 13% of total units, so kindly grant us extension for the project, we herewith attach documents for your reference.
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195819 | ANOOP SHYAMSUNDER SHUKLA | ISRAR MOINUDDIN KHAN,NISHEETH RAMESH TAUNK,FATEMA ALIASGAR BHANPURWALA,MINHAJ SIRAJ AHMED,ANIL GUPTA | 31/01/2021 |
| CC006000000396183 | Reliable Prestige 1 CHSL | Ms Reliable Housing India Pvt Ltd | 13/06/2023 |
| CC006000000479922 | Sharad Vishwas Pawar | M/s Reliable Housing India Pvt Ltd | 03/04/2024 |
| CC12400288 | RAAZ MOHAMMED ABDUL SAMAD PATHAN | RELIABLE HOUSING INDIA PRIVATE LIMITED | 30/09/2024 |
| CC12400289 | RAAZ MOHAMMED ABDUL SAMAD PATHAN | RELIABLE HOUSING INDIA PRIVATE LIMITED | 30/09/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Jan to Mar 26.pdf | 17 Jun 2026 |
| Form 2File: From 2 Jan to Mar 26.pdf | 17 Jun 2026 |
| Form 3File: Form 3 Jan to Mar 26.pdf | 17 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Jan to Mar 26.pdf | 17 Jun 2026 |
| Form 1File: Form 1 July to Sep 25.pdf | 7 Feb 2026 |
| Form 2File: Form 2 July to Sep 25.pdf | 7 Feb 2026 |
| Form 3File: Form 3 Jul to Sep 2025.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Jul to Sep 25.pdf | 7 Feb 2026 |
| Form 1File: Form 1 Oct to Dec 25.pdf | 7 Feb 2026 |
| Form 2File: Form 2 Oct to Dec 25.pdf | 7 Feb 2026 |
| Form 3File: Form 3 Oct to Dec 25.pdf | 7 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Oct to Dec 25.pdf | 7 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf | 7 Feb 2026 |
| Form 1File: Form 1 Apr to Jun 25.pdf | 16 Oct 2025 |
| Form 2File: Form 2 Apr to Jun 25.pdf | 16 Oct 2025 |
| Form 3File: Form 3.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 16 Oct 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jan-March 2025.pdf | 29 May 2025 |
| Certificates of CA (Form 3)File: Form 3 Jan to Mar 25_11zon.pdf | 29 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan 25-Mar 25_11zon.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold March-25_11zon.pdf | 29 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5A 2022-23.pdf | 29 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5A 2023-24.pdf | 29 May 2025 |
| Form 1File: Form 1 Jan-March 2025.pdf | 29 May 2025 |
| Form 2File: Form 2 Jan 25-Mar 25_11zon.pdf | 29 May 2025 |
| Form 3File: Form 3 Jan to Mar 25_11zon.pdf | 29 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold March-25_11zon.pdf | 29 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Oct to Dec 2024_11zon (1).pdf | 6 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct to Dec-24.pdf | 23 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec-24.pdf | 23 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3- Oct-24 to Dec-24.pdf | 13 Feb 2025 |
| Proforma of Agreement for saleFile: Agreement for sale.pdf | 13 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Apr-Jun 24 Reliable Housing.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Jul to Sep 24.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 11 Nov 2024 |
| Certificates of CA (Form 3)File: Form 3_Jul to Sep 24.pdf | 11 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 11 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Jul to Sep 24.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Housing Sold Unsold_Jan to Mar 24_11zon.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Housing Sold Unsold_Jan to Mar 24_11zon.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Housing Sold Unsold_Apr to Jun 24_11zon.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_Jul to Sep 24.pdf | 11 Nov 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 20 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (Jan to March 2024).pdf | 20 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 20 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jan to Mar 2023.pdf | 14 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jul to Sep 2023.pdf | 14 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Apr to Jun 2023.pdf | 14 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct to Dec 2023.pdf | 14 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to Mar 2023.pdf | 14 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Apr to Jun 2023.pdf | 14 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jul to Sep 2023.pdf | 14 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2023.pdf | 14 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Av Crystal prestige Sold Unsold _11zon.pdf | 9 Sep 2023 |
| Layout approvalFile: BP 1-1 Layout.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 1-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 2-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 3-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 4-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 5-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 6-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 7-8.pdf | 28 Jun 2023 |
| Building plan approvalFile: BP 8-8.pdf | 28 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: BP 1-1 Layout.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 1-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 2-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 3-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 4-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 5-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 6-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 7-8.pdf | 28 Jun 2023 |
| Building Plan Approval (IOD)File: BP 8-8.pdf | 28 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A FY 22-23.pdf | 28 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Av crystal prestige - May 9 2023 .pdf | 9 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Av crystal prestige - May 9 2023.pdf | 9 May 2023 |
| Certificates of CA (Form 3)File: Form-3 Av crystal prestige - May 9 2023_11zon.pdf | 9 May 2023 |
| Other - TechnicalFile: Form-2A Av crystal prestige - May 9 2023.pdf | 9 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLDG NO 2 WING A B.pdf | 25 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RERA-15 A Form-2A 2019-20.pdf | 25 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AV CRYSTAL PRESTIGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NALLASOPARA EAST3,200+ in Palghar
Filed coordinates, straight-line distance. 156 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
ARMAAN LOTUS
MANGAL ARJUN VARATHA
Redevelopement of Sagar Prakash Hsg Co-op Soc
TRIMURTI CONSTRUCTION
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
Dharma Residency
Dharma Builders and Developers
See every Palghar project, with the district possession charts
Builder: RELIABLE HOUSING INDIA PRIVATE LIMITED
RELIABLE HOUSING INDIA PRIVATE LIMITED has 2 registrations on MahaRERA, including RELIABLE PRESTIGE 1 and AV CRYSTAL PRESTIGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if AV CRYSTAL PRESTIGE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AV CRYSTAL PRESTIGE?
The registered promoter entity is RELIABLE HOUSING INDIA PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AV CRYSTAL PRESTIGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AV CRYSTAL PRESTIGE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AV CRYSTAL PRESTIGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AV CRYSTAL PRESTIGE?
The professionals named in the filing: Architect: BINDIA BHATT SANAT MEHTA AND ASSOCIATES; Engineer: MUKESH KUMAR; Engineer: Rajesh Kumar Shrivastava; Chartered Accountant: S LAKDAWALA & ASSOCIATES; Chartered Accountant: PRATIK VORA; Chartered Accountant: MAA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AV CRYSTAL PRESTIGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback