Redevelopement of Sagar Prakash Hsg Co-op Soc
RG-MH-04109 · RERA P99000021177 · Last updated on MahaRERA portal: 23 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 46 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Redevelopement of Sagar Prakash Hsg Co-op Soc is a Residential / Group Housing project by TRIMURTI CONSTRUCTION in Palghar, Maharashtra, registered with MahaRERA as P99000021177 on 14 Jun 2019. Possession is promised by 31 Dec 2027. The completion date has moved by 46 months from the original filing. 217 of the 360 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameRedevelopement of Sagar Prakash Hsg Co-op Soc
- TypeResidential / Group Housing
- Location
- Survey No.188
- H.No.5
- 6
- Village Achole
- Nallasopara East
- Nallasopara East
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401209
- Pincode401209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000021177
- ReraGenie IDRG-MH-04109
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jun 2019
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 15 Feb 2024)
- Buildings1 building record
- Documents filed117 files
Current status
Figures as on 23 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A B C D | NA | 14 | 14 | 327 | 33 | 360 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 65%.
WING A B C D: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35% |
Progress on shared amenities15
As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 60% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed228
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A B C D | NA | Rs 29.02 cr | Rs 28.73 cr |
| - | NA | Rs 4.05 cr | Rs 3.85 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Associate Planners & Appraises |
| Architect | Prithvi Arch Consultants |
| Engineer | Darsh Consultant |
| Chartered Accountant | Y K Chaturvedi & co |
| Chartered Accountant | Kunal Atul Mody |
| Partner | Role in project |
|---|---|
| TRIMURTI CONSTRUCTION | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDate: 19th December, 2023. To MAHARERA Authority, Mumbai, Maharashtra. Re:- Extension Application for a period of one year from 15/02/2024 till 14/02/2025 for project registered with Certificate bearing P99000021177. Sir, It is humbly submitted that though the promoter started the construction work after having obtained Commencement Certificate and above referred RERA certificate, owning to Covid 19 pandemic the construction was almost stalled. Post Covid 19 pandamic the promoter regained its strength and started construction in full swing. However, owing to scarcity of certain skilled manpowe
Reason as filed by the promoterApplication for Extension of Project Completion Timeline To, The Competent Authority, Maharashtra Real Estate Regulatory Authority (MahaRERA) Subject: Request for Extension of Completion Timeline for Project RERA No. P99000021177 Respected Sir/Madam, We, Trimurti Construction (Builders & Developers), hereby submit this application seeking an extension of the project completion timeline for the redevelopment of Sagar Prakash HSG Co-op Society (RERA No. P99000021177), currently under construction at Nallasopara (E), Palghar. Reasons for Requesting Extension: Ongoing Structural Work Delays: As pe
Reason as filed by the promoterDear Sir/Ma’am, We, Trimurti Construction, hereby declare the following with respect to the project “Redevelopement of Sagar Prakash Hsg Co-op Soc” bearing registration number P99000021177 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed117
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 2A 2025-2026 Infra.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 20 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 20 Jun 2026 |
| Form 2A (FY 2019-2020)File: Form 2A FY 19-20.pdf | 20 Jun 2026 |
| Form 2A (FY 2020-2021)File: Form 2A FY 20-21.pdf | 20 Jun 2026 |
| Form 2A (FY 2021-2022)File: Form 2A FY 21-22.pdf | 20 Jun 2026 |
| Form 2A (FY 2022-2023)File: Form 2A FY 22-23.pdf | 20 Jun 2026 |
| Form 2A (FY 2023-2024)File: Form 2A FY 23-24.pdf | 20 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 20 Jun 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 20 Jun 2026 |
| Form 5 (FY 2021-2022)File: Form 5 by Umesh M for FY 21-22.pdf | 19 Jun 2026 |
| Form 5 (FY 2022-2023)File: Form 5 by YKC upto 31 Dec 23.pdf | 19 Jun 2026 |
| Form 5 (FY 2020-2021)File: Form 5 FY 20-21.pdf | 19 Jun 2026 |
| Form 5 (FY 2023-2024)File: Form 5 FY 23-24.pdf | 19 Jun 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 19 Jun 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf | 19 Jun 2026 |
| Form 5 (FY 2019-2020)File: Form 5 by BALA for FY 19-20.pdf | 4 Jun 2026 |
| Declaration in FORM BFile: FORM B Trimurti.pdf | 15 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 15-05-2024.pdf | 25 Oct 2024 |
| Certificates of CA (Form 3)File: Form -3 Dated 05-09-2024.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser Of Sold Inventory-signed_11zon.pdf | 25 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Dated 05-09-2024.pdf | 25 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Dated 05-09-2024.pdf | 25 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format B Opening of RERA designated bank account.pdf | 25 Oct 2024 |
| Other - FinanceFile: Disclosure on quarter update in Correction application.pdf | 29 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)_compressed.pdf | 3 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architect’s Certificate.pdf | 3 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032023.pdf | 3 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer’s Certificate on Cost Incurred on Project.pdf | 3 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 23 08 2023.pdf | 3 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 dt 20072023.pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A dt 13082022.pdf | 3 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A dt 13082022.pdf | 3 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 202021).pdf | 3 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 27 10 2023.pdf | 3 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 9 2 2023.pdf | 3 Feb 2024 |
| Declaration in FORM BFile: Revised Form B.pdf | 2 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Recent sold booked inventory.pdf | 2 Feb 2024 |
| Certificates of CA (Form 3)File: final Form 3 Updated 02022024.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate compressed.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate latest compressed.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 as on 31122023 compressed.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on 31122023 compressed.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate compressed.pdf | 30 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory of Sold Flat Trimurti construction.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate DATED 311223 compressed.pdf | 30 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 11 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank account details 7102023.pdf | 8 Oct 2023 |
| Other - FinanceFile: explaination to RERA 6102023.pdf | 6 Oct 2023 |
| Layout approvalFile: Layout Blue Print_11zon.pdf | 4 Oct 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 4 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Blue Print_11zon.pdf | 4 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW REVISED CC DATED 13-07-2023_11zon.pdf | 4 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DATED 31-03-2023 FY 22-23_11zon.pdf | 4 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE 31032023.pdf | 4 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A DATED 31-3-23.pdf | 4 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory of Sold Flat - Trimurti construction DATE 31-03-2023_11zon.pdf | 4 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3_11zon.pdf | 4 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on 31-03-2023_11zon.pdf | 4 Oct 2023 |
| Proforma of Agreement for saleFile: PRO FORM AGREMENT FOR SALE.pdf | 4 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A for 2021 2022.pdf | 26 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of other real estate Format A.pdf | 17 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 21 22.pdf | 17 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20 21 Scan Copy.pdf | 17 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 21 22.pdf | 17 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold booked inventory.pdf | 20 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 20 21 Scan Copy.pdf | 20 Feb 2023 |
| Proforma of Agreement for saleFile: AFS.pdf | 20 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about seperate bank account.pdf | 20 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 117 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Redevelopement of Sagar Prakash Hsg Co-op So on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nallasopara East3,200+ in Palghar
Filed coordinates, straight-line distance. 153 registered projects within 2 km.
MLDC YASHWANT ORCHID PHASE I
SAI RYDAM REALTORS PVT LTD
AV CRYSTAL PRESTIGE
RELIABLE HOUSING INDIA PRIVATE LIMITED
ARMAAN LOTUS
MANGAL ARJUN VARATHA
SANSKRUTI SAPPHIRE
SANSKRUTI BUILDER AND DEVELOPER
DEEP LANDMARK
ATHARVA ENTERPRISES
Dharma Residency
Dharma Builders and Developers
See every Palghar project, with the district possession charts
Builder: TRIMURTI CONSTRUCTION
TRIMURTI CONSTRUCTION has 8 registrations on MahaRERA, including TRIMURTI PARK and DURVA HERITAGE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if Redevelopement of Sagar Prakash Hsg Co-op Soc is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Redevelopement of Sagar Prakash Hsg Co-op Soc?
The registered promoter entity is TRIMURTI CONSTRUCTION, a partnership as per the filing. Its GSTIN 27AANFT8021F1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Redevelopement of Sagar Prakash Hsg Co-op Soc?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Redevelopement of Sagar Prakash Hsg Co-op Soc?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Redevelopement of Sagar Prakash Hsg Co-op Soc?
The professionals named in the filing: Architect: Associate Planners & Appraises; Architect: Prithvi Arch Consultants; Engineer: Darsh Consultant; Chartered Accountant: Y K Chaturvedi & co; Chartered Accountant: Kunal Atul Mody. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Redevelopement of Sagar Prakash Hsg Co-op Soc?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.