Home / Browse projects / Palghar, Maharashtra / SANSKRUTI SAPPHIRE

Registered No litigation declared Others project

SANSKRUTI SAPPHIRE

By SANSKRUTI BUILDER AND DEVELOPER

RG-MH-39553 · RERA P99000033857 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • Rs 22.00 crore secured on the land, in favour of Piramal Ananta Agastya Corporate Park
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 90%
179 of 359Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SANSKRUTI SAPPHIRE is a Others project by SANSKRUTI BUILDER AND DEVELOPER in Palghar, Maharashtra, registered with MahaRERA as P99000033857 on 14 Mar 2022. Possession is promised by 31 Dec 2027. 180 of the 359 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSANSKRUTI SAPPHIRE
  • TypeOthers
  • Location
    • ACHOLE
    • NALLASOPARA
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000033857
  • ReraGenie IDRG-MH-39553

Builder

  • NameSANSKRUTI BUILDER AND DEVELOPER
  • Entity typePartnership
  • GSTIN27AEPFS8662D1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersPRADEEPKUMAR ATMAPRASAD CHATURVEDI, PRAMOD ATMAPRASAD CHATURVEDI
  • Other registrations3 more →

Key dates

this monthRegisteredMar 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

50%180 of 359 units booked
93.4%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANSKRUTI SAPPHIRENA131333425359

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

SANSKRUTI SAPPHIRE: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership5

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,884 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared present
Charge in favour ofPiramal Ananta Agastya Corporate Park
Secured amountRs 22.00 crore
CERSAI search filedYes
Declared on27 Oct 2025
LandownerVillageDistrict
AMIT MAJITHIA PARK CO-OPERATIVE HOUSING SOC. LTD.Vasai-Virar City (M Corp)Palghar
NATASHA MAJITHIA PARK CHSLVasai-Virar City (M Corp)Palghar
NEHA MAJITHIA PARK CHSLVasai-Virar City (M Corp)Palghar
SAAHIL MAJITHIA PARK CHSLVasai-Virar City (M Corp)Palghar
VISHAL MAJITHIA PARK CHSLVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI-VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI15801.35
Proposed, not sanctioned15,801 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASAI EAST , EVERSHINE CITY, 401203
Estimated costRs 30.31 cr
Cost incurredRs 28.30 cr
Work done93.38%
BuildingWingEstimatedIncurred
-NARs 16.33 crRs 15.03 cr
SANSKRUTI SAPPHIRENARs 13.97 crRs 13.28 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectONE SOURCE
EngineerK C SHAH CONSULTANT
Chartered AccountantS B JAIN AND ASSOCIATES
Chartered AccountantMANISH SHINDE AND ASSOCITES
Chartered AccountantJPM AND ASSOCIATES
PartnerRole in project
SANSKRUTI BUILDER AND DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf1 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf1 Jul 2026
Withdrawal Update Form 3File: FORM-3 PDF SIGNED (1)_compressed.pdf1 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf30 Jun 2026
Withdrawal Update Form 3File: FORM-3 PDF SIGNED (1)_compressed.pdf30 Jun 2026
Withdrawal Update Form 3File: FORM-3 PDF SIGNED (1)_compressed.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Jun 2026
Withdrawal Update Form 3File: FORM-3 PDF SIGNED (1)_compressed.pdf29 Jun 2026
Withdrawal Update Form 3File: FORM-3 PDF SIGNED (1)_compressed.pdf29 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dec24.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf21 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Sapphire revised cc - 12032024.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 PDF SIGNED (1)_compressed.pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: sapphire 310322.pdf26 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: sapphire 310323.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: sold unsold 311223 - scanedd.pdf21 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate final dec 23.pdf21 Feb 2024
Proforma of Agreement for saleFile: New Sale deed - sanskruti sapphire (1).pdf15 Jan 2024
Details of encumbrancesFile: New - encumbrance n index 2.pdf14 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect letter form-1 SAPP.pdf14 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate JANSAP.pdf14 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold list.pdf14 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FINAL till 31122023.pdf14 Jan 2024
Proforma of Agreement for saleFile: New Sale deed - sanskruti sapphire (1).pdf14 Jan 2024
Details of encumbrancesFile: enc fin sansk.pdf11 Jan 2024
Proforma of Agreement for saleFile: SALE DRFT SANSK.pdf11 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 22-23 SAPPHIRE.pdf24 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 21-22 sapphire.pdf24 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH SAPPHIRE 3009.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGI SAPPHIRE 3009.pdf5 Dec 2023
Layout approvalFile: majithiya1.pdf19 Sep 2023
Building plan approvalFile: wing a plan.pdf19 Sep 2023
Building plan approvalFile: wing b plan.pdf19 Sep 2023
Building plan approvalFile: wing c plan1.pdf19 Sep 2023
Building plan approvalFile: WING A PART2.pdf19 Sep 2023
Building plan approvalFile: WING B PART2.pdf19 Sep 2023
Building plan approvalFile: WING C PART2.pdf19 Sep 2023
Copy of Layout Approval (in case of layout)File: majithiya1.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: wing a plan.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: wing b plan.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: wing c plan1.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: WING A PART2.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: WING B PART2.pdf19 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: WING C PART2.pdf19 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: PhaseIIrevised CC30062022RE.pdf19 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase architect letter15072023.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Form 2july23.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA certificate 3006231.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_RERA_REV.pdf9 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CALETTE.pdf9 Mar 2022
Declaration in FORM BFile: Affidavit_compressed.pdf6 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231727580_For_Asset_Based_Search_06_03_2022_15_22_51_568.pdf6 Mar 2022
Layout approvalFile: LAYOUT PLAN (phase- II)_compressed.pdf4 Mar 2022
Building plan approvalFile: BUILDING PLAN 2 (phase- II)_compressed.pdf4 Mar 2022
Building plan approvalFile: BUILDING PLAN 3 (phase- II)_compressed.pdf4 Mar 2022
Details of encumbrancesFile: NO ENCUMBRANCE_compressed.pdf4 Mar 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN (phase- II)_compressed.pdf4 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 2 (phase- II)_compressed.pdf4 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 3 (phase- II)_compressed.pdf4 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: majithia -CC-phase II_compressed.pdf4 Mar 2022
Declaration about Commencement CertificateFile: CC DECLEATION_compressed.pdf4 Mar 2022
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf4 Mar 2022
Building plan approvalFile: building planc.pdf20 Feb 2022
PAN CardFile: COMPANY PAN.pdf20 Feb 2022
Copy of the legal title reportFile: AMIT MAJITHIA PARK CHS LTD TITLE REPORT_compressed.pdf20 Feb 2022
Copy of the legal title reportFile: NATASHA MAJITHIA PARK CHS LTD TITLE REPORT_compressed.pdf20 Feb 2022
Copy of the legal title reportFile: NEHA MAJITHIA PARK CHS LTD TITLE REPORT_compressed.pdf20 Feb 2022
Copy of the legal title reportFile: SAAHIL MAJITHIA PARK CHS LTD TITLE REPORT_compressed.pdf20 Feb 2022
Copy of the legal title reportFile: VISHAL MAJITHIA PARK CHS LTD TITLE REPORT_compressed.pdf20 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: building planc.pdf20 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 ARCHITECT CERTIFICATE.pdf20 Feb 2022

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SANSKRUTI SAPPHIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA3,200+ in Palghar

2 kmSANSKRUTI SAPPHIRECompleted 63Lapsed / revoked 46Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 216 registered projects within 2 km.

Builder: SANSKRUTI BUILDER AND DEVELOPER

SANSKRUTI BUILDER AND DEVELOPER has 4 registrations on MahaRERA, including SANSKRUTI SAPPHIRE and SANSKRUTI ROSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SANSKRUTI SAPPHIRE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANSKRUTI SAPPHIRE?

The registered promoter entity is SANSKRUTI BUILDER AND DEVELOPER, a partnership as per the filing. Its GSTIN 27AEPFS8662D1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANSKRUTI SAPPHIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANSKRUTI SAPPHIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANSKRUTI SAPPHIRE?

The professionals named in the filing: Architect: ONE SOURCE; Engineer: K C SHAH CONSULTANT; Chartered Accountant: S B JAIN AND ASSOCIATES; Chartered Accountant: MANISH SHINDE AND ASSOCITES; Chartered Accountant: JPM AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANSKRUTI SAPPHIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANSKRUTI SAPPHIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANSKRUTI SAPPHIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.