ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / MY WORLD BUILDING A1-A2

Completed No litigation declared Others project

MY WORLD BUILDING A1-A2

By SIMAR PRIDE VENTURES LLP

RG-MH-07785 · RERA P51500015785 · Last updated on MahaRERA portal: 9 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 10 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

MY WORLD BUILDING A1-A2 is a Others project by SIMAR PRIDE VENTURES LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500015785 on 26 Mar 2018. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameMY WORLD BUILDING A1-A2
  • TypeOthers
  • Location
    • JALNA ROAD
    • CHIKALTHANA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431210
  • Pincode431210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500015785
  • ReraGenie IDRG-MH-07785

Builder

  • NameSIMAR PRIDE VENTURES LLP
  • Entity typePartnership
  • PartnersNITIN VENUPRASAD BAGADIYA, RAJENDRA SING DHARAM SINGH RAJPAL
  • Other registrations9 more →
  • Completed8 of 10
  • Declared earlier projects10 →

Key dates

this monthRegisteredMar 2018PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Mar 2018
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed125 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A1NA120000
BUILDING A2NA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

BUILDING A1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 9 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
otherNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68
BuildingClosed/CoveredTotal
BUILDING A13434
BUILDING A23434

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,522 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
HIRAMAN RAMCHANDRA RITHEAurangabad (M Corp.)Aurangabad
YAMAJI RAMCHANDRA RITHEAurangabad (M Corp.)Aurangabad
SHANTILAL BABAN RITHEAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI7127.95
Proposed, not sanctioned6,628 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKRANTI CHOWK AURANGABAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKW ASSOCIATES
PartnerRole in project
SIMAR PRIDE VENTURES LLP-

Litigation declared11

CaseCourtStatus
38/2021/2021Civil Judge Senior DivisionDisposed
90/2021/2021Sub Division Officer AurangabadPending
7171/2020/2020Honourable High Court of Bombay AurangabadPending
RCS 128/2020/2020Ninth Civil Judge Senior division Aurangabad Mr Rajendra TuwarPending
486/2020/2020Civil Judge Senior divisionPending
RCS/538/2020/2020Civil Judge Senior division AurangabadDisposed
RCS/729/2020/2020Civil Judge Senior division AurangabadDisposed
RCS-546/2021/2021Civil Judge Senior DivisionPending
RCS-550/2021/2021Civil Judge Senior DivisionPending
RCS-847/2021/2021Civil Judge Senior DivisionPending
RCS-1596/2022/2022Civil Judge Senior DivisionPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Nov 2021

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form no 3 My World A1 A2 Dt31 Dec 21_0001.pdf9 Oct 2023
Certificates of CA (Form 3)File: A1-A2 SEP21 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf8 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 My World A1 A2 Building.pdf24 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: My World A-1 A-2 Architect's Certificae_0001_0001.pdf17 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: my_world_A-1_A-2.pdf11 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE A1 A2-Sep21.pdf15 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHI A-1,2 BUILDING.pdf5 Mar 2022
Status of ConveyanceFile: My World A1A2 Building-Conveyance Declaration.pdf19 Feb 2022
Disclosure of sold/ booked inventoryFile: corrigandum My World A1A2 Type Building.pdf2 Feb 2022
Disclosure of sold/ booked inventoryFile: corrigandum My World A1A2 Type Building.pdf2 Feb 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 (Architect Competion)-My world A1A2 Building.pdf13 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC -PLOT 1.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0214.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0215.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0216.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0217.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0218.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0220.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0219.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0221.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0222.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0223.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0224.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0225.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0226.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0227.pdf19 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: HPSC0228.pdf19 Nov 2021
Certificates of CA (Form 3)File: A1-A2 MAR20 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Certificates of CA (Form 3)File: A1-A2 JUN20 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Certificates of CA (Form 3)File: A1 A2 SEP20 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Certificates of CA (Form 3)File: A1-A2 DEC20 FORM 3 - CA CertMY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Certificates of CA (Form 3)File: A1-A2 MAR21 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Certificates of CA (Form 3)File: A1-A2 JUN21 FORM 3 - CA Cert MY WORLD BUILDING A-1 A-2.pdf16 Nov 2021
Form 2AFile: FORM 2A-A1 A2-Sep'21-My World.pdf21 Oct 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory-My World A1 A2-Jun'21.pdf19 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE A1-A2.pdf15 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE A1-A2 (1).pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE A1- A2-Mar'21.pdf15 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE A1- A2 -Jun'21.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-Mar'21 -My world A1 A2.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 My World A1 A2 Building.pdf15 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: legal entity.pdf15 Aug 2021
Form 2AFile: Form-2A My World A1-A2 June 21.pdf24 Jul 2021
Form 2AFile: Form 2A-Mar'21 -My world A1 A2.pdf29 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-A1A2 Building-Dec'20.pdf14 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-A1A2-Dec'20.pdf14 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1 A2-Architect Certificate -Sep'20.pdf11 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1 A2-Engineers Certificate -Sep'20.pdf11 Feb 2021
Form 2AFile: Form 2A -My world A1A2-Dec'20.pdf1 Feb 2021
OtherFile: Declaration by Devloper.pdf21 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1 A2-Architect Certificate -June'20.pdf3 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1 A2-Engineers Certificate -June'20.pdf3 Nov 2020
Form 2AFile: Form 2A -My world A1-A2-Sept'20.pdf3 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar'20 Architect A 1,2.pdf18 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar'20 Engineeers Certificate A-1,2.pdf18 Sep 2020
Form 2AFile: June'20 A1A2-My World.pdf31 Jul 2020
Form 2AFile: Mar'20 Form 2A A1A2 -My World.pdf6 Jun 2020
Certificates of CA (Form 3)File: My world Building A-1A-2.pdf14 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH A1-2 DEC19.pdf12 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec'20 Engineeers Certificate A-1,2.pdf11 Mar 2020
OtherFile: 200311142723_0001 (1).pdf11 Mar 2020
Form 2AFile: Dec'19 Form 2A A1 A2 -My World.pdf15 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 A1 A2 Mar'19.pdf24 Dec 2019
Certificates of CA (Form 3)File: My World Building A-1 A-2.pdf11 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sep'19 Architect A1 A2.pdf4 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sep'19 Engineer A-1,A-2.pdf4 Dec 2019
Form 2AFile: Sept'19 Form 2A A1A2 -My World.pdf15 Oct 2019
Certificates of CA (Form 3)File: My World Build A-1 A-2.pdf17 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Jun'19 Architect A-1,A-2.pdf9 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: jun'19 Engineer A-1,A-2.pdf9 Sep 2019
Form 2AFile: June'19 Form 2A A1-A2 -My World.pdf13 Aug 2019
Certificates of CA (Form 3)File: my world building a-1 a-2.pdf2 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1, A2 BUILDING MAR-19.pdf1 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1-A2 ENG certificate date 05-04-19.pdf30 Jul 2019
Details of encumbrancesFile: INDEX 2 MY WORLD.pdf25 Jun 2019
Form 2AFile: A-1 2 MARCH-19.pdf22 Apr 2019
Form 2AFile: A-1,A-2.pdf5 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A-1A-2 ARCT CERT 08-01-19.pdf2 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-1A-2 ENGI CERT 10-01-19.pdf2 Mar 2019
Certificates of CA (Form 3)File: My World Building A-1 A-2.pdf2 Mar 2019

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MY WORLD PLOT NO 2 BUILDING D1 TO D6P51500015862CHIKALTHANA, Aurangabad-Mar 2018CompletedDec 2026Jan 2023
MY WORLD BUILDING B1-B2-B3P51500015772CHIKALTHANA, Aurangabad-Mar 2018CompletedDec 2024Jan 2023
My World Building B 4-5-6Gut No 708 Chikalthana108-CompletedDec 2023Jul 2022
My World Building B 7-8-9Gut No 708 Chikalthana108-CompletedMar 2023Oct 2021
My World Building A4Gut No 708 Chikalthana36-CompletedMar 2023Oct 2021
My World Building A3Gut No 708 Chikalthana36-CompletedMar 2023Oct 2021
My World Building A1-A2Gut No 708 Chikalthana88-CompletedMar 2023Oct 2021
MANJEET PRIDE GLORYGUT NO 136P DEOLAI ROAD BEED BYPASS AURANGABAD74-CompletedJul 2017Jul 2017
manjeet prideplot no 361 316A 317 317A mahanagar1 cidco waluj aurangabad112-CompletedJul 2016Jun 2016
MANJEET PRIDE PRIMOGUT NO 81 P BEED BYPASS ROAD AURANGABAD70-CompletedMar 2015Mar 2015

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep MY WORLD BUILDING A1-A2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKALTHANA1,400+ in Aurangabad

2 kmMY WORLD BUILDING A1-A2Completed 15Lapsed / revoked 3Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: SIMAR PRIDE VENTURES LLP

SIMAR PRIDE VENTURES LLP has 10 registrations on MahaRERA, including MY WORLD BUILDING A3 and MY WORLD BUILDING B1-B2-B3. Its filings disclose 10 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if MY WORLD BUILDING A1-A2 is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MY WORLD BUILDING A1-A2?

The registered promoter entity is SIMAR PRIDE VENTURES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MY WORLD BUILDING A1-A2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MY WORLD BUILDING A1-A2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MY WORLD BUILDING A1-A2?

The professionals named in the filing: Architect: AKW ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MY WORLD BUILDING A1-A2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MY WORLD BUILDING A1-A2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MY WORLD BUILDING A1-A2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.