Registration lapsed No litigation declared Residential / Group Housing project

FLAMINGO A1 TO A4

By GOLDENDREAM BUILDCON PVT LTD

RG-MH-01559 · RERA P51500005457 · Last updated on MahaRERA portal: 22 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

FLAMINGO A1 TO A4 is a Residential / Group Housing project by GOLDENDREAM BUILDCON PVT LTD in Aurangabad, Maharashtra, registered with MahaRERA as P51500005457 on 11 Aug 2017. Possession was promised by 29 Jun 2023 and is now 40 months past that date. The completion date has moved by 30 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameFLAMINGO A1 TO A4
  • TypeResidential / Group Housing
  • Location
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431210
  • Pincode431210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500005457
  • ReraGenie IDRG-MH-01559

Builder

  • NameGOLDENDREAM BUILDCON PVT LTD
  • Entity typeCompany
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseDec 2020Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion29 Jun 2023
  • Revised completionRevised to 29 Jun 2023 (originally 30 Dec 2020)
  • Buildings4 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A-1NA100000
BUILDING A-2NA100000
BUILDING A-3NA100000
BUILDING A-4NA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A-291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A-391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING A-491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed161

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots161
Closed/Covered80
Open Space81
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A-1171633
BUILDING A-2232548
BUILDING A-3232649
BUILDING A-4171431

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,860 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GOLDENDREAMS TECHNOPARK PVT LTDAurangabad (M Corp.)Aurangabad

Approvals and building plan

Permissible FSI13756.7
Proposed, not sanctioned13,757 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAULANA AZAD EDU SOCIETY CAMPUS,ROZABAGH,AURANGABAD 431001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOJ KALA AND ASSOCIATES
EngineerPRECISION PRECAST SOLUTIONS PVT LTD
Chartered AccountantNarendra Navandar and company
PartnerRole in project
GOLDENDREAM BUILDCON PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500010646Dec 2020 → Dec 2022

Reason as filed by the promoterThe construction of the project got delayed on account pandemic situation across country due to COVID-19. The construction work at site is completely stopped due to non-availability of labour, we have communicated the same to our customers and they are also understanding the difficulty. The customers have issued their consent for extension of the date of completion of the project. Hence, we request you to allow us extension by 24 months from original date of completion.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC003000000000058SAFFRON DEVELOPERSPVT LTD THROUGH MR RAHUL GUPTA DIRECTORM/S GOLDENDREAM BUILDCON PVT LTD31/07/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B Afidavit cum Declaration (1).pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - 01-10-2021 To 31-12-2021.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - 01-01-2022 To 31-03-2022.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-04-2022 To 30-06-2022.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-07-2022 To 30-09-2022.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-01-2023 To 31-03-2023.pdf22 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Quality Assurance - 01-10-2022 To 31-12-2022.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - 01-07-2023 To 30-09-2023.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - 01-10-2023 To 31-12-2023.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - 01-01-2024 To 31-03-2024.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance - 01-04-2024 To 30-06-2024.pdf22 Apr 2025
Certificates of CA (Form 3)File: CA Certificate To Golden Dream Buildcon Dt-31-03-2024_0001.pdf28 Feb 2025
Certificates of CA (Form 3)File: CA Certificate To Golden Dream Buildcon Dt-31-12-2024_0001.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: SEP'23.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: DEC'23.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: MAR'24.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: JUN'24.pdf28 Feb 2025
Disclosure of sold/ booked inventoryFile: SEP'24.pdf28 Feb 2025
Certificates of CA (Form 3)File: Form-3 Dt-31-03-2021_0001.pdf3 Jan 2025
Certificates of CA (Form 3)File: CA Certificate Dt-31-03-2022_0001.pdf3 Jan 2025
Certificates of CA (Form 3)File: CA Certificate Dt-31-03-2023_0001.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 01-04-2023 To 31-03-2024.pdf3 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certifcates Manoj Kala Flamingo.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: JUN'23.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: MAR'23.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: DEC'22.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: SEP'22.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: JUN'22.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: MAR'22.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: DEC'21.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: SEP'21.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: JUN'21.pdf9 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar'22.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'23.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar'23.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec'22.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep'22.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'22.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec'21.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep'21.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'21.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar'21.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep'20.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jun'20.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: fORM 2 Mar'20.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 01-04-2020 To 31-03-2021.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 01-04-2021 To 31-03-2022.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 01-04-2022 To 31-03-2023.pdf4 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance 01-07-23 To 30-09-23.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Quality Assurance - 01-10-2021 To 31-12-2021.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - 01-10-2021 To 31-12-2021.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance - 01-01-2022 To 31-03-2022.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-04-2022 To 30-06-2022.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-07-2022 To 30-09-2022.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-10-2022 To 31-12-2022.pdf3 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance - 01-01-2023 To 31-03-2023.pdf3 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 03-07-20.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 02-10-20.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 05-01-21.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 04-04-21.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 03-07-22.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 02-10-22.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 05-01-23.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architecht Certificate 04-04-23.pdf9 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MANOJ KALA MAR'20.pdf25 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Flamingo AOP Agreement (1).pdf16 Nov 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Mar'20 Final.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Mar'21 Final.pdf22 Sep 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY (1).pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 Mar'19.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Mar'20.pdf22 Sep 2021
Certificates of CA (Form 3)File: MAR20 FORM 3 - CA Cert FLAMINGO.pdf15 May 2021
Certificates of CA (Form 3)File: JUNE19 FORM 3 - CA Cert FLAMINGO.pdf9 Feb 2021
Certificates of CA (Form 3)File: JUNE19 FORM 3 - CA Cert FLAMINGO.pdf9 Feb 2021
Certificates of CA (Form 3)File: SEP19 FORM 3 - CA Cert FLAMINGO.pdf9 Feb 2021
Certificates of CA (Form 3)File: DEC19 FORM 3 - CA Cert FLAMINGO.pdf9 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MANOJ KALA JUN'19.pdf26 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MANOJ KALA SEP'19.pdf26 Sep 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Manoj Kala Dec'19.pdf26 Sep 2020

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 30 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep FLAMINGO A1 TO A4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Aurangabad (M Corp.)1,400+ in Aurangabad

2 kmFLAMINGO A1 TO A4Completed 3Lapsed / revoked 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: GOLDENDREAM BUILDCON PVT LTD

GOLDENDREAM BUILDCON PVT LTD has 3 registrations on MahaRERA, including MILLENNIUM PARK A1 TO A4 and MILLENNIUM PARK A5 TO A7. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that FLAMINGO A1 TO A4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if FLAMINGO A1 TO A4 is delayed beyond 29 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of FLAMINGO A1 TO A4?

The registered promoter entity is GOLDENDREAM BUILDCON PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in FLAMINGO A1 TO A4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against FLAMINGO A1 TO A4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for FLAMINGO A1 TO A4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at FLAMINGO A1 TO A4?

The professionals named in the filing: Architect: MANOJ KALA AND ASSOCIATES; Engineer: PRECISION PRECAST SOLUTIONS PVT LTD; Chartered Accountant: Narendra Navandar and company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in FLAMINGO A1 TO A4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About FLAMINGO A1 TO A4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save FLAMINGO A1 TO A4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.