Home / Browse projects / Mumbai Suburban, Maharashtra / MONTANA PHASE - 2
MONTANA PHASE - 2
RG-MH-84973 · RERA P51800014539 · Last updated on MahaRERA portal: 20 Jan 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 2 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MONTANA PHASE - 2 is a Residential / Group Housing project by LOHITKA PROPERTIES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014539 on 8 Dec 2017. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 2 complaints are on record with the regulator.
At a glance
Project
- NameMONTANA PHASE - 2
- TypeResidential / Group Housing
- Location
- LBS ROAD
- MULUND
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800014539
- ReraGenie IDRG-MH-84973
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Dec 2017
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SIERRA | NA | 45 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
SIERRA: 94% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities19
As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 25% |
| Community Buildings | Yes | 25% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 72% |
| Solid Waste Management And Disposal | Yes | 55% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 75% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| TENNIS COURT | Yes | 0% |
| SWIMMING POOL | Yes | 0% |
| MULTI PURPOSE HALL | Yes | 0% |
| FITNESS CENTRE | Yes | 0% |
Parking filed378
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| LOHITKA PROPERTIES LLP | - |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000078198 | Mr. Jimit B. Mehta & Mr. Bipinchandra S. Mehta | Lohitka Properties LLP | 21/02/2019 |
| CC12400420 | Leena Thakker | LOHITKA PROPERTIES LLP | 16/10/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Oct 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 with full OC.pdf | 20 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4.pdf | 8 May 2024 |
| Disclosure of sold/ booked inventoryFile: SIERRA.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sierra.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 - Sierra of Sheth Montana.pdf | 22 Apr 2024 |
| Certificates of CA (Form 3)File: FORM-3 - Montana Sierra C.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SIERRA.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sierra.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sieera.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 - Sierra.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1) 1st quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2) 2nd quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3) 3rd quater.pdf | 7 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4) 4th quater.pdf | 7 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: SIERRA.pdf | 27 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -Sierra.pdf | 18 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 - Sierra.pdf | 18 Oct 2023 |
| Certificates of CA (Form 3)File: Form - 3 - Sierra.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 - MONTANA (SIERRA-WING C).pdf | 8 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Montana Ph 2.pdf | 7 Aug 2023 |
| Certificates of CA (Form 3)File: Form 3 Montana Ph 2.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Montana Phase 2.pdf | 17 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Sierra - Jan'23 - Mar'23.pdf | 24 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Sierra - Jan 23 to Mar 23.pdf | 24 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Montana Ph 2 Jan 23 to Mar 23.pdf | 24 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Montana Phase 2 - Sierra.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 - Sierra - Jan 23 to Mar 23.pdf | 24 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Montana Ph 2.pdf | 23 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 SIERRA.pdf | 18 Jan 2023 |
| Certificates of CA (Form 3)File: FORM - 3 SIERRA.pdf | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIERA BUILDING.pdf | 9 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Montana Ph 2.pdf | 16 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Montana Ph 2.pdf | 14 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Montana - Ph 2 Siearra.pdf | 5 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Montana Ph 2.pdf | 25 Oct 2022 |
| Certificates of CA (Form 3)File: From - 3 Montana Ph 2 Sept 2022.pdf | 25 Oct 2022 |
| Certificates of CA (Form 3)File: Montana - Sieara.pdf | 29 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MONTANA SIERRA.PDF | 21 Jul 2022 |
| Certificates of CA (Form 3)File: Montana Ph 2 March 22.pdf | 21 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: MONTANA SIERRA.pdf | 19 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sierra.pdf | 13 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MONTANA SIERRA.PDF | 13 Jun 2022 |
| Details of encumbrancesFile: Montan encumberence details- update_31032022.pdf | 26 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Montana Ph 2.pdf | 26 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: MONTANA -SIERRA.PDF | 20 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MONTANA-2.pdf | 12 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIERRA RERA FORM2 - DEC 21.pdf | 27 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Montana - Sierra.pdf | 25 Jan 2022 |
| CERSAI detailsFile: Montana Ph 1 to 4 CERSAI modified.pdf | 17 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form5 Montana Ph 2_compressed.pdf | 17 Jan 2022 |
| Certificates of CA (Form 3)File: Sierra_Form_3.pdf | 12 Jan 2022 |
| Certificates of CA (Form 3)File: Sierra_Form_3.pdf | 11 Jan 2022 |
| Declaration about Commencement CertificateFile: FORM d mONTANA PH 2.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_Architect_Certificate_-_MONTANA_(Siera)_04012022 (1).pdf | 7 Jan 2022 |
| Proforma of Allotment letterFile: MONTANA-SIEARA.pdf | 28 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Montana Phase - 2.pdf | 10 Jun 2021 |
| Building plan approvalFile: ROSA1.pdf | 3 Jun 2021 |
| Building plan approvalFile: ROSA2.pdf | 3 Jun 2021 |
| Building Plan Approval (IOD)File: ROSA1.pdf | 3 Jun 2021 |
| Building Plan Approval (IOD)File: ROSA2.pdf | 3 Jun 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: MONTANA-PHASE-1 AND 2CC.pdf | 15 Dec 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19 - Siara.pdf | 5 Mar 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf | 30 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Rosa CC 2019 (2)_compressed.pdf | 21 Oct 2019 |
| Certificates of CA (Form 5)File: Montana Phase-2.pdf | 24 Oct 2018 |
| Details of encumbrancesFile: encumberence detail - update 1.pdf | 18 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MONTANA PH2 CC.pdf | 23 Mar 2018 |
| Declaration in FORM BFile: Form-B.pdf | 17 Oct 2017 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE.PDF | 16 Oct 2017 |
| Layout approvalFile: LAYOUT APPROVAL.pdf | 13 Oct 2017 |
| Building plan approvalFile: IOD.pdf | 13 Oct 2017 |
| PAN CardFile: PAN Card - LOHITKA PROP LLP.PDF | 13 Oct 2017 |
| Copy of the legal title reportFile: LEAGAL TITLE REPORT.pdf | 13 Oct 2017 |
| Details of encumbrancesFile: encumberence detail FINAL.pdf | 13 Oct 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf | 13 Oct 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 13 Oct 2017 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE Montana Phase 2.pdf | 13 Oct 2017 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| MONTANA PHASE - 1P51800000735 | MULUND, Mumbai Suburban | 300 | Jul 2017 | Completed | Dec 2023 | Feb 2023 |
| SIGMA | ZANDU PHARMACTICAL GOKHALE ROAD SOUTH DADAR W MUMBAI - 25 | 260 | - | Completed | Jul 2014 | Late, Dec 2014 |
| VIVIANA MALL | Viviana Mall Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 240 | - | Completed | May 2013 | May 2013 |
| Vasant Lawns | Vasant Lawns Voltas Compound Pokharan Rd No 2 Majiwade Thane w 400601 | 465 | - | Completed | Mar 2012 | Late, Nov 2013 |
| BEAUMONDE | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25 | 196 | - | Completed | Dec 2011 | Late, Jan 2012 |
| VASANT MARVEL | WESTRN EXPRESS HIGHWAY BORIWALI EAST MUMBAI - 66 | 641 | - | Completed | Oct 2011 | Late, Jul 2012 |
| CYNERGY | APPASAHEB MARATHE MARG PRABHADEVI MUMBAI 25 | 33 | - | Completed | Sep 2011 | Jul 2011 |
| VASANT GALAXY | JUNCTION OF MG ROAD AND LINK ROAD BANGUR NAGAR GOREGAON WEST MUMBAI | 803 | - | Completed | Oct 2010 | Late, Mar 2011 |
| VASANT VALLEY | MALAD EAST MUMBAI 96 | 127 | - | Completed | Jun 2010 | Late, Dec 2010 |
| VASANT GARDEN | SWAPNA NAGARI OFF LBS MARG MULUND WEST MUMBAI 80 | 1,825 | - | Completed | Mar 2007 | Late, Dec 2007 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep MONTANA PHASE - 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MULUND6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 261 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: LOHITKA PROPERTIES LLP
LOHITKA PROPERTIES LLP has 4 registrations on MahaRERA, including MONTANA PHASE - 1 and MONTANA PHASE - 2. Its filings disclose 10 earlier MahaRERA projects: declares 3 of 10 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that MONTANA PHASE - 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MONTANA PHASE - 2 is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MONTANA PHASE - 2?
The registered promoter entity is LOHITKA PROPERTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MONTANA PHASE - 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MONTANA PHASE - 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MONTANA PHASE - 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in MONTANA PHASE - 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback