Home / Browse projects / Pune, Maharashtra / Mont Vert Grande Plot 4 Bldg D
Mont Vert Grande Plot 4 Bldg D
By Niraj Kumar Associates Pvt Ltd
RG-MH-97506 · RERA P52100020690 · Last updated on MahaRERA portal: 10 Oct 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Mont Vert Grande Plot 4 Bldg D is a Residential / Group Housing project by Niraj Kumar Associates Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100020690 on 3 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameMont Vert Grande Plot 4 Bldg D
- TypeResidential / Group Housing
- Location
- Pashan-Sus Road
- Pashan
- Haveli
- Pune
- 411021
- Pincode411021
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100020690
- ReraGenie IDRG-MH-97506
Builder
- NameNiraj Kumar Associates Pvt Ltd
- Entity typeCompany
- CINU45209MH1995PTC094283
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorJayant Vallabhdas Kaneria
- Other registrations6 more →
- Completed5 of 7
- No longer live2 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on3 May 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed104 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building D | NA | 18 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Building D: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 10 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
| Swimming pool | Yes | 100% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Team Work Architects |
| Engineer | HPA Associates |
| Partner | Role in project |
|---|---|
| Niraj Kumar Associates Pvt Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Oct 2024
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: 01-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 02-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 03-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 04-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 05-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 06-07.pdf | 10 Oct 2024 |
| Building plan approvalFile: 07-07.pdf | 10 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 01-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 02-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 03-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 04-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 05-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 06-07.pdf | 10 Oct 2024 |
| Building Plan Approval (IOD)File: 07-07.pdf | 10 Oct 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Grande D Form 4.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grande D Rera Certificate.pdf | 8 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grande D completion certificate.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 Mont Vert Grande D Building 2023 2024.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mont Vert Grande D BUILDING June 2024.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Grande D June 2024.pdf | 9 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold GRANDE D BUILDING June 2024.pdf | 9 Aug 2024 |
| Certificates of CA (Form 3)File: form3 Mont Vert Grand D Building 30-06-2024_compressed.pdf | 9 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A grande D RERA 2023 2024.pdf | 15 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22 23 D.pdf | 14 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: GRANDE D.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 D Bldg .pdf | 15 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 GRANDE D.pdf | 15 May 2024 |
| Certificates of CA (Form 3)File: MONT VERT GRAND D BUILIDNG FORM 3 March 2024_compressed.pdf | 26 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: NKAPL GRANDE D.pdf | 8 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 MONTVERT GRAND D BUILDING FORM 3 Dec 2023.pdf | 8 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 GRAND D Dec 2023.pdf | 3 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-9-23 GRANDE D.pdf | 6 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Vert Grande plot 4 Bldg D.pdf | 28 Nov 2023 |
| Certificates of CA (Form 3)File: FORM 3 MONTVERT GRAND D BUILDING Sept 2023_compressed.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Grande D Bldg Form 2 June 2023.pdf | 9 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-6-23 GRANDE D.pdf | 9 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory 30-6-23 GRANDE D.pdf | 9 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 - D Building - June 2023_compressed.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D BLDG.pdf | 6 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D BLDG.pdf | 6 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3 Grande D Bldg Mar 23.pdf | 24 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande D Bldg Mar 23.pdf | 8 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M M V Grande D Bldg Mar 23.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A M V Grande D Bldg Mar 23.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Grande D Bldg Mar 23.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Grande D Bldg Mar 22.pdf | 1 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Grande D Mar 21.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 Grande D Aug 2022.pdf | 25 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 D BUILDING MARCH 2020.pdf | 25 Feb 2023 |
| Certificates of CA (Form 3)File: FORM 3 D BUILDING MARCH 2021.pdf | 25 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande D Bldg Mar 20.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande D Bldg Mar 21.pdf | 16 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 M V Grande D Bldg Mar 22.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande D Bldg Mar 20.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande D Bldg Mar 21.pdf | 16 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 M V Grande D Bldg Mar 22.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Grande Bldg D FY 2021-22.pdf | 4 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold M V Grande D Dec 22 Qtr.pdf | 18 Jan 2023 |
| Building plan approvalFile: HPSCANNER3487_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: HPSCANNER3486_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: HPSCANNER3485_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: HPSCANNER3483_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: HPSCANNER3482_compressed.pdf | 10 Nov 2022 |
| Building plan approvalFile: Grande 15th Floor Sanction Plan _compressed.pdf | 10 Nov 2022 |
| Layout approvalFile: Grande D Building Layout 16 floor.pdf | 10 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Grande D Building Layout 16 floor.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: HPSCANNER3487_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: HPSCANNER3486_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: HPSCANNER3485_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: HPSCANNER3483_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: HPSCANNER3482_compressed.pdf | 10 Nov 2022 |
| Building Plan Approval (IOD)File: Grande 15th Floor Sanction Plan _compressed.pdf | 10 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Grande D Building CC 2021.pdf | 10 Nov 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Scan Copy of Society Registration Certificate.pdf | 24 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory M V Grande D Marr 22.pdf | 23 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FOrm 5 - FY 19-20 Mont Vert Grande Plot 4 Bldg D Final.pdf | 13 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FOrm 5 - FY 20-21 Mont Vert Grande Plot 4 Bldg D Final.pdf | 13 Dec 2021 |
| Proforma of Allotment letterFile: New Mont Vert Grande bldg D allotment letter Draft.pdf | 11 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A M V Grande D Bldg June 2021.pdf | 24 Jul 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Avion | 1401A Pashan-Sus Rd Pashan | 93 | Completed | Dec 2017 | Late, Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
Keep Mont Vert Grande Plot 4 Bldg D on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pashan13,700+ in Pune
Filed coordinates, straight-line distance. 254 registered projects within 2 km.
NYATI EQUINOX I
MIHIR HOMES ENTERPRISE LLP
Puraniks Abitante Fiore, Phase 2A
Puranik Buildcon Private Limited
Puraniks Abitante Fiore, Phase 2B
Puranik Buildcon Private Limited
cloud 51
OREE REALITY PVT LTD
CIELO BY VTP LUXE
DELAS REALCON LLP
Puraniks Abitante Fiore Phase 2C1
Puranik Buildcon Private Limited
Builder: Niraj Kumar Associates Pvt Ltd
Niraj Kumar Associates Pvt Ltd has 7 registrations on MahaRERA, including Mont Vert Avion and Mont Vert Velocity. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Mont Vert Grande Plot 4 Bldg D is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Mont Vert Grande Plot 4 Bldg D?
The registered promoter entity is Niraj Kumar Associates Pvt Ltd, a company as per the filing. Its CIN U45209MH1995PTC094283 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Mont Vert Grande Plot 4 Bldg D?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Mont Vert Grande Plot 4 Bldg D?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Mont Vert Grande Plot 4 Bldg D?
The professionals named in the filing: Architect: Team Work Architects; Engineer: HPA Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mont Vert Grande Plot 4 Bldg D?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback